DIRECTOR OF THE SAN CONE — PATERNò (Q2021724)

From EU Knowledge Graph
Revision as of 00:15, 24 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2021724 in Italy
Language Label Description Also known as
English
DIRECTOR OF THE SAN CONE — PATERNò
Project Q2021724 in Italy

    Statements

    0 references
    5,599,013.63 Euro
    0 references
    7,578,939.49 Euro
    0 references
    73.88 percent
    0 references
    24 October 2017
    0 references
    15 December 2020
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    37°34'0.34"N, 14°16'50.70"E
    0 references
    L'ATTIVITà CONSISTE NELLA SOSTITUZIONE DEI CONDUTTORI CON ALTRI AD ALTA CAPACITà DI TRASPORTO DI TIPO ZTAL PER LE LINEE AEREE 150 KV TRA LA C.P. NICOLETTI E LA S.E. PATERNò, PER UN TOTALE DI CIRCA 80 KM. L'INTERVENTO SARà, INOLTRE, COMPRENSIVO DELLA SOSTITUZIONE DEI RELATIVI EQUIPAGGIAMENTI, DI SOSTEGNI E DELLA FUNE DI GUARDIA CON QUELLA INCORPORANTE FIBRA OTTICA (F.O), ANCHE AL FINE DI AUMENTARE LE FUNZIONALITà CONNESSE CON IL MONITORAGGIO DELLA RETE.TALI INTERVENTI CONSENTIRANNO DI AUMENTARE L'AFFIDABILITà DELLA RETE ELETTRICA DI TRASMISSIONE NAZIONALE E DI FAR FRONTE ALL'INTRODUZIONE IN RETE DI QUOTE SEMPRE MAGGIORI DI ENERGIE RINNOVABILI GARANTENDO MAGGIORE FLESSIBILITà DELLA CAPACITà DI TRASPORTO. (Italian)
    0 references
    THE ACTIVITY CONSISTS OF THE REPLACEMENT OF ZTAL TYPES FOR CONDUCTORS OF ZAL FOR THE 150 KV OVERHEAD LINES BETWEEN THE C.P. NICOLETTI AND THE AE PATERNò, AMOUNTING TO A TOTAL OF APPROXIMATELY 80 KM. IN ADDITION, THE INTERVENTION WILL INCLUDE THE REPLACEMENT OF THE RELATED EQUIPMENT, SUPPORTS AND GUARD ROPE WITH THAT INCORPORATING OPTICAL FIBRE (F.O), INCLUDING WITH A VIEW TO INCREASING THE OPERATIONAL TASKS ASSOCIATED WITH THE MONITORING OF THE NATIONAL TRANSMISSION GRID, AND WILL ENABLE THE AFFIDABILITY OF THE NATIONAL ELECTRICITY TRANSMISSION NETWORK TO BE INCREASED AND TO BE ABLE TO COPE WITH THE INTRODUCTION OF INCREASING SHARES OF RENEWABLE ENERGIES IN THE NETWORK BY ENSURING A HIGHER LEVEL OF TRANSPORT CAPACITY. (English)
    0 references
    L’ACTIVITÉ CONSISTE À REMPLACER LES CONDUCTEURS PAR D’AUTRES GRANDES CAPACITÉS DE TRANSPORT DE TYPE ZTAL POUR LES COMPAGNIES AÉRIENNES DE 150 KV ENTRE C.P. NICOLETTI ET S.E. PATERNò, POUR UN TOTAL D’ENVIRON 80 KM. L’INTERVENTION COMPRENDRA ÉGALEMENT LE REMPLACEMENT DE L’ÉQUIPEMENT CONNEXE, DES SUPPORTS ET DES CÂBLES DE PROTECTION PAR CEUX INCORPORANT LA FIBRE OPTIQUE (F.O.), ÉGALEMENT AFIN D’ACCROÎTRE LES FONCTIONS LIÉES À LA SURVEILLANCE DU RÉSEAU NETWORK.TALI PERMETTRA D’ACCROÎTRE LA FIABILITÉ DU RÉSEAU NATIONAL D’ÉLECTRICITÉ DE TRANSPORT ET DE FAIRE FACE À L’INTRODUCTION DANS LE RÉSEAU DE PARTS TOUJOURS CROISSANTES D’ÉNERGIES RENOUVELABLES ASSURANT UNE PLUS GRANDE FLEXIBILITÉ DE LA CAPACITÉ DE TRANSPORT. (French)
    14 December 2021
    0 references
    DE ACTIVITEIT BESTAAT ERIN DE GELEIDERS TE VERVANGEN DOOR ANDERE HOGE TRANSPORTCAPACITEIT VAN HET TYPE ZTAL VOOR 150 KV-LUCHTVAARTMAATSCHAPPIJEN TUSSEN C.P. NICOLETTI EN S.E. PATERNò, VOOR EEN TOTAAL VAN ONGEVEER 80 KM. DE INTERVENTIE OMVAT OOK DE VERVANGING VAN DE BIJBEHORENDE APPARATUUR, STEUNEN EN WACHTKABEL MET DIE WAARIN GLASVEZEL (F.O.), OOK OM DE FUNCTIES VERBONDEN MET DE MONITORING VAN DE NETWORK.TALI INTERVENTIES ZULLEN HET MOGELIJK MAKEN OM DE BETROUWBAARHEID VAN HET NATIONALE TRANSMISSIE ELEKTRICITEITSNET TE VERHOGEN EN OM TE GAAN MET DE INVOERING IN HET NETWERK VAN STEEDS GROTERE AANDELEN VAN HERNIEUWBARE ENERGIE, WAARDOOR EEN GROTERE FLEXIBILITEIT VAN DE TRANSPORTCAPACITEIT. (Dutch)
    23 December 2021
    0 references
    DIE TÄTIGKEIT BESTEHT DARIN, DIE LEITER DURCH ANDERE HOHE TRANSPORTKAPAZITÄTEN DES TYPS ZTAL FÜR 150 KV FLUGGESELLSCHAFTEN ZWISCHEN C.P. NICOLETTI UND S.E. PATERNò FÜR INSGESAMT CA. 80 KM ZU ERSETZEN. DIE MASSNAHME UMFASST AUCH DEN AUSTAUSCH DER ZUGEHÖRIGEN AUSRÜSTUNG, STÜTZEN UND SCHUTZSEIL MIT DEM MIT GLASFASER (F.O.), AUCH UM DIE FUNKTIONEN IM ZUSAMMENHANG MIT DER ÜBERWACHUNG DER NETWORK-INTERVENTIONEN ZU ERHÖHEN.TALI WIRD ES ERMÖGLICHEN, DIE ZUVERLÄSSIGKEIT DES NATIONALEN ÜBERTRAGUNGSSTROMNETZES ZU ERHÖHEN UND MIT DER EINFÜHRUNG IMMER GRÖSSERER ANTEILE ERNEUERBARER ENERGIEN IN DAS NETZ FERTIG ZU WERDEN, UM EINE GRÖSSERE FLEXIBILITÄT DER TRANSPORTKAPAZITÄTEN ZU GEWÄHRLEISTEN. (German)
    24 December 2021
    0 references

    Identifiers

    G73G17001010007
    0 references