(2685.28022017.107000002) “OLD MINE RAIL” PROJECT (Q2060070)

From EU Knowledge Graph
Revision as of 17:57, 23 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2060070 in Italy
Language Label Description Also known as
English
(2685.28022017.107000002) “OLD MINE RAIL” PROJECT
Project Q2060070 in Italy

    Statements

    0 references
    70,000.0 Euro
    0 references
    350,000.0 Euro
    0 references
    20.0 percent
    0 references
    31 May 2017
    0 references
    19 June 2019
    0 references
    31 December 2019
    0 references
    COMUNE DI MURLO
    0 references
    0 references
    0 references

    43°9'38.77"N, 11°23'16.51"E
    0 references
    IL PERCORSO ?VECCHIA FERROVIA DELLA MINIERA? POTRA ESSERE RIORGANIZZATO MEDIANTE UNA RISTRUTTURAZIONE DEL PERCORSO DIDATTICO DEL1996, PARTE DELL?INTERO TRACCIATO;CON IL LAVORO SI PROVVEDERA AL RESTAURO DEL PONTE SUL TORRENTE CREVOLONE IN COMPLETO STATO DI CROLLO, ALLA SISTEMAZIONE E CONSOLIDAMENTO DELLA GALLERIA DI MONTAMBROGIO, ALLA ACQUISIZIONE DI ALCUNI TRATTI DEL PERCORSO CHE PER ERRORI E VICISSITUDINI VARIE IN SEGUITO ALLA CHIUSURA DELLE MINIERE NON VENNERO TRASFERITI AL DEMANIO, MA A DEI PRIVATI.LA TIPOLOGIA DEGLI INTERVENTI PREVISTI E RIVOLTA AL MIGLIORAMENTO, ALLA TUTELA ED ALLA VALORIZZAZIONE DEL BENE, AL FINE DI POTENZIARE LA BIODIVERSITA, LA CONSERVAZIONE DEGLI ECOSISTEMI ANCHE DI GRANDE PREGIO E IL CONSOLIDAMENTO DELLA FUNZIONE PROTETTIVA DELLE BOSCHI. INOLTRE, SI VUOLE GARANTIRE LA FRUIBILITA DA PARTE DELLA COMPAGINE SOCIALE ESALTANDONE IL VALORE ECOLOGICO, SOCIALE, RICREATIVO, TURISTICO E AMBIENTALE E SALVAGUARDANDONE IL VALORE PAESAGGISTICO.GLI INTERVENTI PROPOSTI NELLE (Italian)
    0 references
    THE OLD TRACK OF THE MINE? TO BE REORGANISED BY A RESTRUCTURING OF THE LEARNING PATHWAY OF DEL1996, PART OF THE WHOLE ROUTE, WITH THE WORK BEING CARRIED OUT TO THE RESTORATION OF THE BRIDGE OVER THE RISE IN THE STATE OF THE COLLAPSE, THE FITTING-OUT AND CONSOLIDATION OF THE MOTAMBROGIO TUNNEL, THE ACQUISITION OF SOME SECTIONS OF THE ROUTE WHICH, OWING TO ERRORS AND VICISSITUDES AS A RESULT OF THE CLOSURE OF THE MINES, WERE NOT TRANSFERRED TO THE PUBLIC DOMAIN, BUT TO THE PRIVATICS OF THE MEASURES ENVISAGED AND DIRECTED TOWARDS THE IMPROVEMENT, CONSERVATION AND ENHANCEMENT OF THE PROPERTY, IN ORDER TO ENHANCE BIODIVERSITY, THE CONSERVATION OF ECOSYSTEMS, WHICH ARE ALSO OF GREAT VALUE, AND THE STRENGTHENING OF THE PROTECTIVE FUNCTION OF FORESTS. IN ADDITION, IT IS INTENDED TO ENSURE THE VIABILITY OF THE STRUCTURE AND TO INCREASE THE VALUE OF ITS ECOLOGICAL, SOCIAL, RECREATIONAL, TOURIST AND ENVIRONMENTAL VALUE AND TO SAFEGUARD ITS VALUE BY SAFEGUARDING ITS VALUE AS PROPOSED IN THE (English)
    0 references
    LE VIEUX CHEMIN DE FER DE LA MINE? IL PEUT ÊTRE RÉORGANISÉ PAR UNE RESTRUCTURATION DE LA VOIE DIDACTIQUE DEL1996, UNE PARTIE DE L’ENSEMBLE DE LA ROUTE; AVEC LES TRAVAUX NOUS ALLONS PRÉVOIR LA RESTAURATION DU PONT SUR LE TORRENT CREVOLONE EN ÉTAT COMPLET D’EFFONDREMENT, L’ARRANGEMENT ET LA CONSOLIDATION DU TUNNEL DE MONTAMBROGIO, L’ACQUISITION DE CERTAINS TRONÇONS DE LA ROUTE QUI, EN RAISON DE DIVERSES ERREURS ET VICISSITUDES SUITE À LA FERMETURE DES MINES N’ONT PAS ÉTÉ TRANSFÉRÉS À LA PROPRIÉTÉ DE L’ÉTAT, MAIS AU PRIVATI.THE TYPE D’INTERVENTIONS PRÉVUES ET VISANT À AMÉLIORER, PROTÉGER ET AMÉLIORER LE BIEN, AFIN D’AMÉLIORER LA BIODIVERSITÉ, LA CONSERVATION DES ÉCOSYSTÈMES AUSSI DE GRANDE VALEUR ET LA CONSOLIDATION DE LA FONCTION PROTECTRICE DU BOIS. EN OUTRE, NOUS VOULONS GARANTIR L’UTILISABILITÉ DE LA STRUCTURE SOCIALE EN RENFORÇANT SA VALEUR ÉCOLOGIQUE, SOCIALE, RÉCRÉATIVE, TOURISTIQUE ET ENVIRONNEMENTALE ET EN PRÉSERVANT SA VALUE PAESAGGISTIQUE.LES INTERVENTIONS PROPOSÉES DANS (French)
    16 December 2021
    0 references
    DE ROUTE?OUDE SPOORLIJN VAN DE MIJN? HET KAN WORDEN GEREORGANISEERD DOOR EEN HERSTRUCTURERING VAN DE DIDACTISCHE WEG DEL1996, EEN DEEL VAN DE GEHELE ROUTE; MET HET WERK DAT WIJ ZULLEN VOORZIEN IN HET HERSTEL VAN DE BRUG OVER DE TORRENT CREVOLONE IN VOLLEDIGE STAAT VAN INSTORTING, DE REGELING EN CONSOLIDATIE VAN DE TUNNEL VAN MONTAMBROGIO, DE VERWERVING VAN EEN AANTAL DELEN VAN DE ROUTE DIE ALS GEVOLG VAN VERSCHILLENDE FOUTEN EN WISSELVALLIGHEDEN NA DE SLUITING VAN DE MIJNEN NIET ZIJN OVERGEDRAGEN AAN HET STAATSEIGENDOM; MAAR AAN HET PRIVATI.THE TYPE INTERVENTIES GEPLAND EN GERICHT OP HET VERBETEREN, BESCHERMEN EN VERBETEREN VAN HET GOEDE, MET HET OOG OP DE VERBETERING VAN DE BIODIVERSITEIT, HET BEHOUD VAN ECOSYSTEMEN OOK VAN GROTE WAARDE EN DE CONSOLIDATIE VAN DE BESCHERMENDE FUNCTIE VAN HET BOS. BOVENDIEN WILLEN WIJ DE BRUIKBAARHEID VAN DE SOCIALE STRUCTUUR GARANDEREN DOOR HAAR ECOLOGISCHE, SOCIALE, RECREATIEVE, TOERISTISCHE EN MILIEUWAARDE TE VERGROTEN EN HAAR PAESAGGISTIC VALUE TE BESCHERMEN. (Dutch)
    23 December 2021
    0 references

    Identifiers