(10360.14072017.115000025) ENERGY REFURBISHMENT OF PODENZANA SCHOOLS (Q2056949)

From EU Knowledge Graph
Revision as of 17:39, 23 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2056949 in Italy
Language Label Description Also known as
English
(10360.14072017.115000025) ENERGY REFURBISHMENT OF PODENZANA SCHOOLS
Project Q2056949 in Italy

    Statements

    0 references
    56,794.72 Euro
    0 references
    141,986.8 Euro
    0 references
    40.0 percent
    0 references
    15 March 2018
    0 references
    15 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI PODENZANA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO 1: ISOLAMENTO TERMICO DELLA COPERTURA SIA PIANA CHE A FALDE INCLINATAINTERVENTO 2: SOSTITUZIONE DEGLI INFISSI DEL PIANO PRIMOINTERVENTO 3: SOSTITUZIONE CALDAIA ESISTENTE CON CALDAIA A CONDENSAZIONE E INSERIMENTO VALVOLE TERMOSTATICHE SUI DISPOSITIVI TERMINALIINTERVENTO 4: REALIZZAZIONE DI IMPIANTO SOLARE TERMICO PER LA PRODUZIONE DI ACQUA CALDA SANITARIA INTEGRATO ALL'IMPIANTO DI CLIMATIZZAZIONE INVERNALE INTERVENTO 5: REALIZZAZIONE DI IMPIANTO FOTOVOLTAICO PER LA PRODUZIONE DI ENERGIA ELETTRICA IN REGIME DI AUTOCONSUMOINTERVENTO 6: REALIZZAZIONE DI IMPIANTO DI DOMOTICA COMPRENSIVO DI RILEVATORI DI PRESENZA INFRAROSSI (Italian)
    0 references
    ACTION 1: THERMAL INSULATION OF COVER FOR BOTH FLAT AND INCLINATORIES 2: REPLACEMENT OF THE INPRIMINFORVENTION WINDOW FRAMES 3: REPLACEMENT OF EXISTING BOILER WITH CONDENSING BOILER AND INSERTION OF TEST VALVES ON THE TERMS OF THE 4: ESTABLISHMENT OF A SOLAR THERMAL SYSTEM FOR THE PRODUCTION OF HOT WATER INTEGRATED INTO THE WINTER AIR CONDITIONING SYSTEM INTERVENTION 5: PRODUCTION OF PHOTOVOLTAIC INSTALLATIONS FOR THE PRODUCTION OF ELECTRICITY UNDER THE AUTHORITY OF AUTOLAW 6: CONSTRUCTION OF HOME AUTOMATION SYSTEMS INCLUDING INFRARED FIRE DETECTORS (English)
    0 references
    ACTION 1: ISOLATION THERMIQUE DES TOITS PLATS ET RABATS INCLINATAINTERVENTO 2: REMPLACEMENT DES CADRES DE FENÊTRES DU PLAN PRIMOINTERVENT 3: REMPLACEMENT DE CHAUDIÈRES EXISTANTES PAR CHAUDIÈRE À CONDENSATION ET INSERTION DE VANNES THERMOSTATIQUES SUR LES DISPOSITIFS TERMINALIINTERVENTO 4: RÉALISATION D’UN SYSTÈME THERMIQUE SOLAIRE POUR LA PRODUCTION D’EAU CHAUDE DOMESTIQUE INTÉGRÉE AU SYSTÈME DE CLIMATISATION HIVERNAL INTERVENTION 5: RÉALISATION D’UN SYSTÈME PHOTOVOLTAÏQUE POUR LA PRODUCTION D’ÉLECTRICITÉ SOUS AUTOCONSUMOINTERVENTO 6: RÉALISATION D’UN SYSTÈME DOMOTIQUE COMPRENANT DES DÉTECTEURS DE PRÉSENCE INFRAROUGES (French)
    16 December 2021
    0 references
    ACTIE 1: THERMISCHE ISOLATIE VAN ZOWEL VLAKKE ALS FLAP DAKEN INCLINATAINTERVENTO 2: VERVANGING VAN DE RAAMKOZIJNEN VAN HET PRIMOINTERVENT-PLAN 3: BESTAANDE KETELVERVANGING DOOR CONDENSOR EN THERMOSTATISCHE KLEPPEN OP TERMINALIINTERVENTO APPARATEN 4: REALISATIE VAN ZONNEWARMTESYSTEEM VOOR DE PRODUCTIE VAN WARM WATER VOOR HUISHOUDELIJK GEBRUIK GEÏNTEGREERD MET DE WINTER AIRCONDITIONING SYSTEEM INTERVENTIE 5: REALISATIE VAN EEN FOTOVOLTAÏSCH SYSTEEM VOOR DE PRODUCTIE VAN ELEKTRICITEIT ONDER AUTOCONSUMOINTERVENTO 6: REALISATIE VAN DOMOTICASYSTEEM INCLUSIEF INFRAROOD AANWEZIGHEIDSMELDERS (Dutch)
    23 December 2021
    0 references

    Identifiers