ENERGY UPGRADING OF BASIC SCHOOL E. DE AMICIS DI FORGRIA IN FRIULI (Q2034893)

From EU Knowledge Graph
Revision as of 15:14, 23 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2034893 in Italy
Language Label Description Also known as
English
ENERGY UPGRADING OF BASIC SCHOOL E. DE AMICIS DI FORGRIA IN FRIULI
Project Q2034893 in Italy

    Statements

    0 references
    164,500.01 Euro
    0 references
    329,000.0 Euro
    0 references
    50.0 percent
    0 references
    23 May 2018
    0 references
    31 August 2020
    0 references
    COMUNE DI FORGARIA NEL FRIULI
    0 references
    IL PROGETTO PREVEDE LA REALIZZAZIONE DI UNA SERIE DI INTERVENTI DI EFFICIENTAMENTO ENERGETICO CHE RENDERANNO L¿EDIFICIO SCOLASTICO UNA STRUTTURA A CONSUMO ENERGETICO QUASI ZERO (NZEB), IL SUDDETTO INTERVENTO SARà ASSOCIATO ALLA CONTEMPORANEA REALIZZAZIONE DI ADEGUAMENTI STRUTTURALI CHE RENDERANNO L¿EDIFICIO CONFORME ALLA VIGENTE NORMATIVA ANTISISMICA. IN SINTESI Ê PREVISTA LA COIBENTAZIONE DELLE PARETI PERIMETRALI E DEL SOLAIO, LA SOSTITUZIONE DEGLI ATTUALI INFISSI IN METALLO CON ALTRI IN (Italian)
    0 references
    THE PROJECT PROVIDES FOR THE IMPLEMENTATION OF A SERIES OF ENERGY EFFICIENCY MEASURES WHICH WILL RENDER THE SCHOOL BUILDING A NEARLY ZERO ENERGY CONSUMPTION STRUCTURE (NZEBS), THE INTERVENTION WILL BE ACCOMPANIED BY THE SIMULTANEOUS IMPLEMENTATION OF STRUCTURAL ADJUSTMENTS THAT WILL RENDER IT COMPLIANT WITH THE EXISTING ANTI-SEISMIC BUILDING. IN SUMMARY, PROVISION IS MADE FOR THE INSULATION OF THE PERIMETER WALLS AND THE FLOOR, REPLACING THE EXISTING METAL FRAMES WITH OTHER FIXTURES IN (English)
    0 references
    LE PROJET PRÉVOIT LA RÉALISATION D’UNE SÉRIE D’INTERVENTIONS EN MATIÈRE D’EFFICACITÉ ÉNERGÉTIQUE QUI FERONT DU BÂTIMENT SCOLAIRE UNE INSTALLATION DE CONSOMMATION D’ÉNERGIE QUASI NULLE (NZEB), L’INTERVENTION SUSMENTIONNÉE SERA ASSOCIÉE À LA RÉALISATION SIMULTANÉE D’AJUSTEMENTS STRUCTURELS QUI RENDRONT LE BÂTIMENT CONFORME À LA LÉGISLATION ANTISISMIQUE ACTUELLE. EN RÉSUMÉ, L’ISOLATION DES MURS DU PÉRIMÈTRE ET DU GRENIER EST PRÉVUE, LE REMPLACEMENT DES LUMINAIRES MÉTALLIQUES ACTUELS PAR D’AUTRES EN (French)
    16 December 2021
    0 references
    HET PROJECT VOORZIET IN DE REALISATIE VAN EEN REEKS ENERGIE-EFFICIËNTIE-INTERVENTIES DIE VAN HET SCHOOLGEBOUW EEN BIJNA NULENERGIEVERBRUIKSFACILITEIT (NZEB) ZULLEN MAKEN. DE BOVENGENOEMDE INTERVENTIE ZAL WORDEN GEKOPPELD AAN DE GELIJKTIJDIGE UITVOERING VAN STRUCTURELE AANPASSINGEN DIE HET GEBOUW IN OVEREENSTEMMING ZULLEN BRENGEN MET DE HUIDIGE ANTISEISMISCHE WETGEVING. KORTOM, DE ISOLATIE VAN DE OMTREK MUREN EN DE ZOLDER IS GEPLAND, DE VERVANGING VAN DE HUIDIGE METALEN ARMATUREN MET ANDEREN IN (Dutch)
    23 December 2021
    0 references

    Identifiers

    J18E18000020006
    0 references