Extension of sanitation to Caramulo (Q2982512)
Jump to navigation
Jump to search
Project Q2982512 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Extension of sanitation to Caramulo |
Project Q2982512 in Portugal |
Statements
187,669.0 Euro
0 references
220,787.0 Euro
0 references
85.0 percent
0 references
1 August 2018
0 references
31 May 2021
0 references
MUNICÍPIO DE TONDELA
0 references
Construção de cerca de 2 km de rede de drenagem de águas residuais, com a colocação de caixas de visita e os ramais de ligação prediais com a ligação à ETAR do Caramulo para fecho deste subsistema e remodelação da rede de drenagem de águas residuais existente. (Portuguese)
0 references
Construction of about 2 km of sewage drainage network, with the placement of visiting boxes and the building connecting branches with the connection to the Caramulo sewage plant to close this subsystem and refurbish the existing wastewater drainage network. (English)
9 July 2021
0 references
Construction d’environ 2 km de réseau de drainage des eaux usées, avec la mise en place de trous d’égout et de voies d’évitement avec raccordement à la station d’épuration de Caramulo pour fermer ce sous-système et remettre en état le réseau existant de drainage des eaux usées. (French)
7 December 2021
0 references
Bau von ca. 2 km Abwasserentwässerungsnetz, mit der Platzierung von Manöfen und den Anschluss an den Caramulo WWTP, um dieses Teilsystem zu schließen und das bestehende Abwasserentwässerungsnetz zu sanieren. (German)
15 December 2021
0 references
Aanleg van ongeveer 2 km rioleringsnet, met de plaatsing van mangaten en de bouwsporen met de aansluiting op de Caramulo WWTP om dit subsysteem te sluiten en het bestaande afvalwaterafvoernet te renoveren. (Dutch)
20 December 2021
0 references
Tondela, Guardão
0 references
Identifiers
POSEUR-03-2012-FC-000732
0 references