Arc SAR remodeling (Q2982589)
Jump to navigation
Jump to search
Project Q2982589 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Arc SAR remodeling |
Project Q2982589 in Portugal |
Statements
37,965.0 Euro
0 references
44,664.0 Euro
0 references
85.0 percent
0 references
1 November 2017
0 references
31 December 2020
0 references
MUNICÍPIO DE VILA FLOR
0 references
Com esta operação pretende-se dotar a ETAR existente de uma obra de entrada que garanta a eficiência dos equipamentos a jusante, de modo a ser assegurado o tratamento satisfatório das águas residuais urbanas da localidade de Arco, pertencente à União das freguesias de Vila Flor e Nabo. (Portuguese)
0 references
With this operation it is intended to equip the existing sewage plant with an entrance work that ensures the efficiency of downstream equipment, in order to ensure the satisfactory treatment of urban waste water of the locality of Arco, belonging to the Union of the parishes of Vila Flor and Nabo. (English)
9 July 2021
0 references
L’objectif de cette opération est de doter la station d’épuration existante d’un site d’entrée garantissant l’efficacité des équipements en aval, afin d’assurer un traitement satisfaisant des eaux urbaines résiduaires dans la ville d’Arco, appartenant à l’Union des paroisses de Vila Flor et de Nabo. (French)
7 December 2021
0 references
Ziel dieses Vorhabens ist es, der bestehenden Abwasserbehandlungsanlage eine Einfahrtsstätte zu bieten, die die Effizienz der nachgelagerten Anlagen gewährleistet, um eine zufrieden stellende Behandlung von kommunalem Abwasser in der Stadt Arco zu gewährleisten, die der Union der Pfarreien Vila Flor und Nabo angehört. (German)
16 December 2021
0 references
Vila Flor, União das freguesias de Vila Flor e Nabo
0 references
Identifiers
POSEUR-03-2012-FC-000848
0 references