Several performances at the crossing of Via Xurra and Metrovalencia line 3 with the ravine of the Carraixet (Q3249769)

From EU Knowledge Graph
Revision as of 10:17, 10 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q3249769 in Spain
Language Label Description Also known as
English
Several performances at the crossing of Via Xurra and Metrovalencia line 3 with the ravine of the Carraixet
Project Q3249769 in Spain

    Statements

    0 references
    682,232.5 Euro
    0 references
    1,364,465.0 Euro
    0 references
    50.0 percent
    0 references
    1 January 2017
    0 references
    31 December 2021
    0 references
    CONSELLERIA DE VIVIENDA, OBRAS PUBLICAS Y VERTEBRACION DEL TERRITORIO
    0 references
    0 references

    38°17'18.38"N, 0°33'41.62"W
    0 references
    46999
    0 references
    La actuación consiste en la construcción de una pasarela ciclopeatonal en la conexión de la Vía Xurra sobre el Barranco del Carraixet para restituir el trazado rectilíneo original de la vía. Además, se incluye la la permeabilización de los caminos de servicio del Barranco del Carraixet bajo la Línea 3 de Metrovalencia y la adecuación de los mismos hasta la conexión con la CV-3002. (Spanish)
    0 references
    The action consists in the construction of a cyclopeatonal footbridge to connect the Via Xurra over the Carraixet ravine to restore the original layout of the track. In addition, it includes the permeabilization of the service roads of Barranco del Carraixet under Line 3 of Metrovalencia and their adaptation to the connection with the CV-3002. (English)
    0 references
    L’action consiste en la construction d’une passerelle cyclopédale dans la connexion de la Via Xurra sur le Barranco del Carraixet pour restaurer la ligne droite originale de la voie. En outre, il comprend la perméabilisation des routes de service du Barranco del Carraixet sous la ligne 3 de Metrovalence et leur adaptation jusqu’à la connexion avec le CV-3002. (French)
    5 December 2021
    0 references
    Die Aktion besteht aus dem Bau eines zyklopädischen Gehwegs in der Verbindung der Via Xurra auf der Barranco del Carraixet, um die ursprüngliche gerade Linie der Strecke wieder herzustellen. Darüber hinaus umfasst es die Permeabilisierung der Dienststraßen der Barranco del Carraixet unter Metrovalence Linie 3 und die Anpassung von ihnen bis zur Verbindung mit dem CV-3002. (German)
    10 December 2021
    0 references
    Varios Municipios de Valencia
    0 references

    Identifiers

    20F06030201U_INFRVARIO00000008
    0 references