Project Q3884185 in Bulgaria
Language Label Description Also known as
English
Introduction of energy efficiency measures in public and multi-apartment buildings in the town of Botevgrad — stage 1
Project Q3884185 in Bulgaria

    Statements

    0 references
    953,618.23 Bulgarian lev
    0 references
    486,345.3 Euro
    1 December 2021
    0 references
    1,121,903.78 Bulgarian lev
    0 references
    572,170.93 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    11 March 2019
    0 references
    11 September 2021
    0 references
    0 references

    42°54'28.26"N, 23°47'34.62"E
    0 references
    Проект "Въвеждане на мерки за енергийна ефективност в обществени и многофамилни жилищни сгради на територията на град Ботевград – етап 1" е по приоритетна ос 2 ,,Подкрепа за енергийната ефективност в опорни центрове в периферните райони“ на ОПРР. В рамките на проекта за 1 обществена сграда (РУ на МВР, ул. „Свобода“ № 11) и 4 сгради от жилищната инфраструктура ("Славейков 20", кв. 39, ул. "Славейков" № 20, вх. А, Б; "Янтра", ул. "Янтра" № 4, "Зелин", ул. "Стефан Караджа" № 2, "Александрови", ул. "Стара планина" № 16) ще бъдат изпълнени следните видове работи:-всички мерки за енергийна ефективност, които са предписани в обследването за енергийна ефективност на всяка от сградите; -дейности по конструктивно възстановяване/усилване, които са предписани в техническия паспорт на сградите; -СМР, които обхващат ремонт и реконструкция на различни части на сградата (важи само за сградите, които постигат най-малко клас на енергопотребление „С“ и минимум 60% енергийни спестявания на първична енергия), които са предписани като задължителни в техническия паспорт на сградата;-Съпътстващи строителни и монтажни работи, свързани с изпълнението на мерките за енергийна ефективност и възстановяване на първоначалното състояние, нарушено в резултат на обновяването;-Дейности за подобряване достъпа за лица с увреждания до гореспоменатите сгради.За всяка от сградите в рамките на проекта ще бъде изготвен инвестиционен проект, ще бъде изпълнен авторски надзор, оценка на съответствието на инвестиционния проект и строителен надзор по време на строителството. Ще бъде осигурена необходимата информация и публичност и високоефективно управление на проекта.В резултат от изпълнението на проекта ще бъдат обновени 5 сгради, ще се понижи годишното потребление на първична енергия от сградите в размер на 1 251 750,90 kWh/год., ще се намалят годишните нива на парникови газове в размер на еквивалент на 249,75 тона CO2 и 30 домакинства, ще преминат в по-горен клас на енергопотребление. (Bulgarian)
    0 references
    The project “Implementation of energy efficiency measures in public and multi-apartment buildings on the territory of the town of Botevgrad — Stage 1” is under Priority Axis 2,Support for energy efficiency in support centres in peripheral areas of the OPRG. Within the framework of the project for 1 public building (RU of the Ministry of Interior, 11 Svoboda Street) and 4 buildings from the residential infrastructure (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; “Yantra”, 4, Yantra Str., “Zelin”, 2 Stefan Karadzha Str., “Alexandrovi”, 16 Stara Planina Str.) the following types of work will be implemented:-all energy efficiency measures prescribed in the energy efficiency audit of each building; — structural restoration/improvement activities prescribed in the technical passport of the buildings; Construction works covering the renovation and reconstruction of different parts of the building (only for buildings that achieve at least energy consumption class “C” and at least 60 % primary energy savings) which are prescribed as mandatory in the technical passport of the building;-Accompanying construction and installation works related to the implementation of energy efficiency measures and restoration of the initial condition impaired as a result of the renovation; — Activities to improve access for persons with disabilities to the above-mentioned buildings. For each of the buildings within the project an investment project will be prepared, author’s supervision, assessment of the conformity of the investment project and construction supervision during construction will be carried out. The necessary information and publicity and high-efficiency management of the project will be provided. As a result of the implementation of the project, 5 buildings will be renovated, the annual primary energy consumption of buildings will be reduced by 1 251 750.90 kWh/year, the annual greenhouse gas levels of the equivalent of 249.75 tonnes of CO2 and 30 households will be reduced, and will be converted to the higher energy consumption class. (English)
    2 December 2021
    0 references
    Le projet «Mise en œuvre de mesures d’efficacité énergétique dans les bâtiments publics et multi-appartements sur le territoire de la ville de Botevgrad — phase 1» fait l’objet de l’axe prioritaire 2 (Appui à l’efficacité énergétique dans les centres d’appui dans les zones périphériques de l’OPRG). Dans le cadre du projet pour un bâtiment public (RU du Ministère de l’intérieur, 11 rue Svoboda) et 4 bâtiments de l’infrastructure résidentielle (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; «Yantra», 4, rue Yantra, «Zelin», 2 Stefan Karadzha Str., «Alexandrovi», 16 Stara Planina Str.) les types de travaux suivants seront mis en œuvre: — toutes les mesures d’efficacité énergétique prescrites dans l’audit d’efficacité énergétique de chaque bâtiment; — les activités de restauration et d’amélioration structurelles prescrites dans le passeport technique des bâtiments; Les travaux de construction couvrant la rénovation et la reconstruction de différentes parties du bâtiment (uniquement pour les bâtiments qui atteignent au moins la classe de consommation d’énergie «C» et au moins 60 % d’économies d’énergie primaires) qui sont prescrits comme obligatoires dans le passeport technique du bâtiment;-Accompagner les travaux de construction et d’installation liés à la mise en œuvre de mesures d’efficacité énergétique et à la restauration de l’état initial altéré à la suite de la rénovation; — Activités visant à améliorer l’accès des personnes handicapées aux bâtiments susmentionnés. Pour chacun des bâtiments du projet, un projet d’investissement sera élaboré, la supervision de l’auteur, l’évaluation de la conformité du projet d’investissement et la supervision de la construction pendant la construction seront réalisées. À la suite de la mise en œuvre du projet, 5 bâtiments seront rénovés, la consommation annuelle d’énergie primaire des bâtiments sera réduite de 1 251 750,90 kWh/an, les niveaux annuels de gaz à effet de serre de l’équivalent de 249,75 tonnes de CO2 et 30 ménages seront réduits et seront convertis à la classe de consommation d’énergie plus élevée. (French)
    3 December 2021
    0 references
    Das Projekt „Umsetzung von Energieeffizienzmaßnahmen in öffentlichen Gebäuden und Mehrfamilienhäusern auf dem Gebiet der Stadt Botevgrad – Stufe 1“ steht unter Prioritätsachse 2,Unterstützung der Energieeffizienz in Förderzentren in Randgebieten der OPRG. Im Rahmen des Projekts für 1 öffentliches Gebäude (RU des Innenministeriums, 11 Svoboda Straße) und 4 Gebäude aus der Wohninfrastruktur (Slaveykov 20), 39, 20 Slaveykov Str., Ent. A, B; „Yantra“, 4, Yantra Str., „Zelin“, 2 Stefan Karadzha Str., „Alexandrovi“, 16 Stara Planina Str.) folgende Arten von Arbeiten werden umgesetzt:-alle Energieeffizienzmaßnahmen, die in der Energieeffizienzprüfung jedes Gebäudes vorgeschrieben sind; — bauliche Restaurierung/Verbesserung, die im technischen Reisepass der Gebäude vorgeschrieben ist; Bauarbeiten zur Renovierung und Rekonstruktion verschiedener Teile des Gebäudes (nur für Gebäude, die mindestens die Energieverbrauchsklasse „C“ und mindestens 60 % Primärenergieeinsparungen erzielen), die im technischen Pass des Gebäudes vorgeschrieben sind;-Begleitung von Bau- und Installationsarbeiten im Zusammenhang mit der Durchführung von Energieeffizienzmaßnahmen und der Wiederherstellung des anfänglichen Zustands infolge der Renovierung; – Maßnahmen zur Verbesserung des Zugangs von Menschen mit Behinderungen zu den oben genannten Gebäuden. Für jedes Gebäude im Rahmen des Projekts wird ein Investitionsprojekt vorbereitet, die Aufsicht des Autors, die Bewertung der Übereinstimmung des Investitionsvorhabens und die Bauaufsicht während des Baus. Die notwendigen Informationen und Publizität sowie ein hocheffizientes Management des Projekts werden zur Verfügung gestellt. Als Ergebnis der Projektdurchführung werden 5 Gebäude renoviert, der jährliche Primärenergieverbrauch von Gebäuden um 1 251 750,90 kWh/Jahr gesenkt, der jährliche Treibhausgasgehalt von 249.75 Tonnen CO2 und 30 Haushalte verringert und in die höhere Energieverbrauchsklasse umgewandelt. (German)
    4 December 2021
    0 references
    Ботевград
    0 references

    Identifiers

    BG16RFOP001-2.002-0044
    0 references