Completion and reconstruction of the water supply system and sewerage networks in the separate area, served by WSS OOD, Kardzhali, Bulgaria (Q3834367)

From EU Knowledge Graph
Revision as of 13:18, 6 December 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3834367 in Bulgaria
Language Label Description Also known as
English
Completion and reconstruction of the water supply system and sewerage networks in the separate area, served by WSS OOD, Kardzhali, Bulgaria
Project Q3834367 in Bulgaria

    Statements

    0 references
    42,288,174.21 Bulgarian lev
    0 references
    21,566,968.85 Euro
    1 December 2021
    0 references
    56,547,844.01 Bulgarian lev
    0 references
    28,839,400.45 Euro
    1 December 2021
    0 references
    0.75 percent
    0 references
    22 October 2019
    0 references
    22 April 2024
    0 references
    0 references
    0 references

    41°34'7.54"N, 25°23'41.50"E
    0 references
    Основни компоненти на проектаПредвиденото инвестиционно намерение включва:1. Компонент водоснабдяване 1.1. Агломерация Кърджали:- ОБЕКТ 1: Инженеринг на обект „Реконструкция и модернизация на ПСПВ (Пречиствателна станция за питейни води) Енчец“;- ОБЕКТ 4: Инженеринг на обект „Външни водопроводи на ВС Боровица“. Обособена позиция: Инженеринг на обект „Реконструкция на магистрален водопровод на ВС „Боровица“ от с. Ненково до ПСПВ Енчец“- ОБЕКТ 4: Инженеринг на обект „Външни водопроводи на ВС Боровица“. Обособена позиция: Реконструкция на главните водопроводи на ВС Боровица от ПСПВ Енчец до НР13000 м³ и НР 5000 м³. Подобект: Изграждане на втора камера на НР 5000 м³“- ОБЕКТ 2: Инженеринг на обект „Реконструкция на компоненти от ВС Боровица“. Обособена позиция: „Реконструкция и доизграждане на вътрешна водопроводна мрежа на гр. Кърджали“.1.2. Агломерация Момчилград:- ОБЕКТ 2: Инженеринг на обект „Реконструкция на компоненти от ВС Боровица“. Обособена позиция: „Реконструкция и доизграждане на вътрешна водопроводна мрежа на гр. Момчилград“2. Компонент отвеждане и пречистване2.1. Агломерация Кърджали:- ОБЕКТ 3: Инженеринг на обект „Доизграждане и реконструкция на канализационната мрежа в агломерация Кърджали“: Доизграждане и реконструкция на канализационна мрежа кв. Гледка и кв. Горна Гледка; Доизграждане и реконструкция на канализационна мрежа в с. Резбарци; Доизграждане и реконструкция на канализационна мрежа в кв. Прилепци; Изграждане на нова входна шахта и укрепващо съоръжение на дюкер под р. Арда. (Bulgarian)
    0 references
    Main components of the projectThe envisaged investment intention includes:1. Component water supply 1.1. Kardzhali agglomeration:- OBECT 1: Engineering of the project “Reconstruction and modernisation of PWTP (Drinking Water Treatment Plant) Enchetz”;- OPECT 4: Engineering of the project “External water ducts of Borovitsa Air Force”. Lot: Engineering of the site “Reconstruction of a highway water pipeline of Borovitsa Air Force from the village of Nenkovo to PSPV Enchetz” — OBECT 4: Engineering of the project “External water ducts of Borovitsa Air Force”. Lot: Reconstruction of the main water supply lines of Borovitsa from PWTP Enčec to HP13000 m³ and HP 5 000 m³. Sub-site: Construction of a second camera of HP 5 000 m³"- OBECT 2: Engineering of the project “Reconstruction of components from Borovitsa Air Force”. Lot: “Reconstruction and completion of the internal water supply network of Kardzhali”.1.2. Agglomeration Momchilgrad:- OBECT 2: Engineering of the project “Reconstruction of components from Borovitsa Air Force”. Lot: “Reconstruction and completion of the internal water supply network of Momchilgrad”2. Drainage and purification component2.1. Kardzhali agglomeration:- OBEKT 3: Engineering of the site “Completement and reconstruction of the sewerage network in the agglomeration of Kardzhali”: Completion and reconstruction of sewerage network View and quarter Upper view; Completion and reconstruction of sewerage network in the village of Rezbartsi; Completion and reconstruction of sewerage network in Bats; Construction of a new entrance shaft and reinforcement facility of the duker under the Arda River. (English)
    2 December 2021
    0 references
    Principaux éléments du projetL’intention d’investissement envisagée comprend: 1. Approvisionnement en eau des composants 1.1. Agglomération de Kardzhali:- obect 1: Ingénierie du projet «Reconstruction et modernisation de PWTP (usine de traitement de l’eau potable) Enchetz»;- OPECT 4: Ingénierie du projet «Canalisations d’eau extérieures de Borovitsa Air Force». Lot: Ingénierie du site «Reconstruction d’une autoroute conduite d’eau de Borovitsa Air Force du village de Nenkovo à PSPV Enchetz» — obect 4: Ingénierie du projet «Canalisations d’eau extérieures de Borovitsa Air Force». Lot: Reconstruction des principales conduites d’approvisionnement en eau de Borovitsa de PWTP Enčec à HP13000 m³ et HP 5 000 m³. Sous-site: Construction d’une deuxième caméra de HP 5 000 m³"- obect 2: Ingénierie du projet «Reconstruction de composants de Borovitsa Air Force». Lot: «Reconstruction et achèvement du réseau interne d’approvisionnement en eau de Kardzhali».1.2. Agglomération Momchilgrad:- obect 2: Ingénierie du projet «Reconstruction de composants de Borovitsa Air Force». Lot: «Reconstruction et achèvement du réseau interne d’approvisionnement en eau de Momchilgrad»2. Composante de drainage et de purification2.1. Agglomération de Kardzhali:- Obekt 3: Ingénierie du site «achèvement et reconstruction du réseau d’assainissement dans l’agglomération de Kardzhali»: Achèvement et reconstruction du réseau d’assainissement Vue et trimestre Vue supérieure; Achèvement et reconstruction du réseau d’assainissement dans le village de Rezbartsi; Achèvement et reconstruction du réseau d’assainissement Chauves-souris; Construction d’un nouveau puits d’entrée et d’une installation de renforcement du Duker sous la rivière Arda. (French)
    3 December 2021
    0 references
    Hauptkomponenten des ProjektsDie geplante Investitionsabsicht umfasst: 1. Komponenten Wasserversorgung 1.1. Kardzhali Agglomeration:- obect 1: Engineering des Projekts „Rekonstruktion und Modernisierung von PWTP (Drinking Water Treatment Plant) Enchetz“;- OPECT 4: Konstruktion des Projekts „Außenwasserkanäle der Luftwaffe Borovitsa“. Los: Engineering des Standorts „Rekonstruktion der Autobahn Wasserleitung Borovitsa Luftwaffe aus dem Dorf Nenkovo zu PSPV Enchetz“ – obect 4: Konstruktion des Projekts „Außenwasserkanäle der Luftwaffe Borovitsa“. Los: Rekonstruktion der wichtigsten Wasserversorgungslinien von Borovitsa von PWTP Enčec auf HP13000 m³ und HP 5 000 m³. Unterseite: Bau einer zweiten Kamera von HP 5 000 m³"- obect 2: Engineering des Projekts „Rekonstruktion von Bauteilen von Borovitsa Air Force“. Los: „Rekonstruktion und Fertigstellung des internen Wasserversorgungsnetzes von Kardzhali“.1.2. Agglomeration Momchilgrad:- obect 2: Engineering des Projekts „Rekonstruktion von Bauteilen von Borovitsa Air Force“. Los: „Rekonstruktion und Fertigstellung des internen Wasserversorgungsnetzes von Momchilgrad“2. Entwässerungs- und Reinigungskomponente2.1. Kardzhali Agglomeration:- Obekt 3: Engineering des Standorts „Vervollständigung und Rekonstruktion des Kanalisationsnetzes im Ballungsraum von Kardzhali“: Fertigstellung und Umbau des Kanalisationsnetzes Blick und Viertel Oberer Blick; Fertigstellung und Wiederaufbau des Kanalisationsnetzes im Dorf Rezbartsi; Fertigstellung und Rekonstruktion des Kanalisationsnetzes in Fledermäuse; Bau einer neuen Eingangswelle und Verstärkungsanlage des Herzogs unter dem Arda-Fluss. (German)
    4 December 2021
    0 references
    Кърджали
    0 references

    Identifiers

    BG16M1OP002-1.016-0010
    0 references