Construction of the Niemodlin bypass within dk 46 (Q2693027)

From EU Knowledge Graph
Revision as of 06:22, 14 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q2693027 in Poland
Language Label Description Also known as
English
Construction of the Niemodlin bypass within dk 46
Project Q2693027 in Poland

    Statements

    0 references
    0 references
    241,571,834.11 zloty
    0 references
    53,701,418.72 Euro
    0.2223 Euro
    0 references
    284,202,157.79 zloty
    0 references
    63,178,139.68 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2022
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references

    50°53'30.8"N, 17°55'55.6"E
    0 references
    Przedsięwzięcie polega na budowie obwodnicy Niemodlina w ciągu drogi krajowej nr 46 o parametrach drogi klasy GP o długości 11,49 km, realizowanej w trybie projektuj i buduj. (Polish)
    0 references
    The project consists of the construction of the Niemodlina ring road along national road No 46 with the parameters of the PG class road with a length of 11.49 km, carried out in the design and construction mode. (English)
    7 July 2021
    0 references
    Le projet consiste en la construction du périphérique Niemodlina le long de la route nationale no 46 avec les paramètres de la route de classe PG d’une longueur de 11,49 km, réalisée en mode conception et construction. (French)
    3 December 2021
    0 references
    Das Projekt besteht aus dem Bau der Ringstraße Niemodlina entlang der Nationalstraße Nr. 46 mit den Parametern der PG-Klasse Straße mit einer Länge von 11,49 km, die im Entwurfs- und Baumodus durchgeführt wird. (German)
    14 December 2021
    0 references

    Identifiers

    POIS.04.02.00-00-0056/20
    0 references