Thermal modernisation of public buildings in the Piaseczyński District (Q109002)

From EU Knowledge Graph
Revision as of 15:40, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q109002 in Poland
Language Label Description Also known as
English
Thermal modernisation of public buildings in the Piaseczyński District
Project Q109002 in Poland

    Statements

    0 references
    6,282,767.73 zloty
    0 references
    1,507,864.26 Euro
    13 January 2020
    0 references
    8,656,041.19 zloty
    0 references
    2,077,449.89 Euro
    13 January 2020
    0 references
    72.58 percent
    0 references
    15 July 2015
    0 references
    28 June 2019
    0 references
    POWIAT PIASECZYŃSKI
    0 references

    51°59'3.8"N, 21°12'50.4"E
    0 references

    52°5'0.6"N, 21°7'14.9"E
    0 references

    52°4'28.9"N, 21°1'37.6"E
    0 references
    Celem Projektu jest zwiększenie efektywności energetycznej i poprawa jakości powietrza poprzez poprawę parametrów energetycznych budynków użyteczności publicznej na terenie Powiatu Piaseczyńskiego (PP). Projekt realizowany będzie w partnerstwie PP (Lider) i Gmin: Konstancin-Jeziorna (KJ) i Góra Kalwaria (GK) -Partnerzy, w 8 budynkach użyteczn. publicznej zlokalizowanych na terenie Powiatu Piaseczyńskiego, w tym 5 budynkach należących do PP, 1 – do Gminy KJ i 2-do Gminy GK. Zakres rzeczowy projektu obejmuje termomodernizację następujących obiektów: budynku Starostwa przy ul. Czajewicza 2/4 w Piasecznie (popr. efektywn.energet (EN) - o 84,43%), budynku LO im. I Dywizji Kościuszkowskiej w Piasecznie (EN- 65,31%), budynku szkoły ZS RCKU w Piasecznie (EN- 51,20%), 2 budynków DPS w KJ (1 wolnostoj i 3 połącz - EN od 68,45- do 86,84%). Wszystkie budynki spełniają zatem Kryterium Dostępu (KD) nr 3. Zakres prac służących poprawie efektywności energetycznej określono na podstawie audytów energetycznych (KD nr 1). Cel zostanie osiągnięty poprzez kompleksowe działania termomodernizacyjne, w tym odpowiednio: ocieplenie przegród zewnętrznych obiektu, w tym ścian zewnętrznych, dachów lub stropodachów, wymianę okien/drzwi zewnętrznych , wymianę oświetlenia na energooszczędne, przebudowę systemów grzewczych,budowę systemów wentylacji i klimatyzacji wraz z rekuperacją , zastosowanie automatyki pogodowej , instalację mikrokogeneracji na potrzeby własne , instalację OZE, instalację indywidualnych liczników ciepła oraz c.w.u., instalację zaworów podpionowych i termostatów. W wyniku realizacji projektu nastąpi poprawa efektywności energetycznej dla budynków objętych działaniami termomoderniz. o 64,46% (KMS nr 1). Koszty kwalifikowalne projektu obejmują tylko zadania wskazane w audytach energetycznych (KD nr1). Wnioskodawca wykona audyt energetyczny ex-post (KD nr 2). Projekt jest zgodny z dyrektywami wskazanymi w KD nr 5 oraz przepisami wskazanymi w KF nr 5. (Polish)
    0 references
    The aim of the Project is to increase energy efficiency and improve air quality by improving the energy performance of public buildings in the Piaseczyński District (PP). The project will be implemented in partnership between PP (Leader) and Municipalities: Konstancin-Jeziorna (KJ) and Góra Kalwaria (GK) -Partners, in 8 public buildings located in the Piaseczyński District, including 5 buildings belonging to the PP, 1 – to the Municipality of KJ and 2- to the GK commune. The project’s material scope includes the thermal modernisation of the following facilities: building of the Starostwo at ul. Czajewicza 2/4 in Piaseczno (per. effectwn.energet (EN) – 84.43 %), the building of the First Kościuszkowska Division in Piaseczno (EN-65.31 %), the building of the ZS RCKU school in Piaseczno (EN-51.20 %), 2 DPS buildings in KJ (1 detachment and 3 connect – EN from 68.45-86.84 %). All buildings therefore meet the Access Criterion (KD) No 3. The scope of the work to improve energy efficiency was determined on the basis of energy audits (DRA No 1). The objective will be achieved through comprehensive thermo-modernisation measures, including as appropriate: warming of external partitions of the facility, including external walls, roofs or stropodaches, replacement of windows/doors, replacement of lighting for energy-efficient, conversion of heating systems, construction of ventilation and air conditioning systems with recuperation, use of weather automation, installation of microcogeneration for own needs, RES installation, installation of individual heat meters and central heating, installation of underpilot valves and thermostats. The project will result in an improvement of energy efficiency for buildings covered by thermomodernisation activities by 64.46 % (RBM No 1). The eligible costs of the project cover only the tasks indicated in the energy audits (KD No1). The applicant will carry out an ex-post energy audit (KD No 2). The draft complies with the Directives set out in the PPA No 5 and the provisions set out in the NF No 5. (English)
    17 October 2020
    0 references
    L’objectif du projet est d’améliorer l’efficacité énergétique et la qualité de l’air en améliorant la performance énergétique des bâtiments publics du district de Piaseczyński (PP). Le projet sera mis en œuvre dans le cadre d’un partenariat PP (leader) et Municipalités: Konstancin-Jeziorna (KJ) et Góra Kalwaria (GK) — Partenaires, dans 8 bâtiments d’utilité publique situés dans le district de Piaseczyński, dont 5 bâtiments appartenant à PP, 1 à la municipalité de KJ et 2 à la municipalité de GK. Le champ d’application matériel du projet comprend la thermomodernisation des installations suivantes: le bâtiment Starostwo à ul. Czajewicza 2/4 à Piaseczno (Am. Efficace Energy (EN) — 84,43 %), le bâtiment de la 1ère division Kościuszko LO à Piaseczno (EN-65,31 %), le bâtiment de l’école ZS RCKU à Piaseczno (EN-51,20 %), 2 bâtiments DPS à KJ (1 stands lents et 3 connexions — EN de 68,45- à 86,84 %). Tous les bâtiments sont donc conformes au critère d’accès no 3. Le champ d’application des travaux visant à améliorer l’efficacité énergétique est défini sur la base d’audits énergétiques (KD 1). L’objectif sera atteint au moyen d’activités globales de thermomodernisation, y compris, le cas échéant: isolation des cloisons extérieures du bâtiment, y compris les murs extérieurs, les toits ou les planchers, remplacement des fenêtres/portes, remplacement de l’éclairage à faible consommation d’énergie, conversion des systèmes de chauffage, construction de systèmes de ventilation et de climatisation avec récupération, application d’automatisation des conditions météorologiques, installation de micro-cogénération pour usage propre, installation de SER, installation de compteurs de chaleur individuels et d’eau chaude, installation de vannes et de thermostats sous tension. Le projet permettra d’améliorer l’efficacité énergétique des bâtiments couverts par la thermomodernisation de 64,46 % (KMS 1). Les coûts éligibles du projet ne couvrent que les tâches indiquées dans les audits énergétiques (KD no 1). Le demandeur réalisera un audit énergétique ex post (KD 2). Le projet est conforme aux directives énoncées dans la DK no 5 et aux dispositions du KF no 5. (French)
    1 December 2021
    0 references
    Ziel des Projekts ist es, die Energieeffizienz zu steigern und die Luftqualität zu verbessern, indem die Energieeffizienz öffentlicher Gebäude im Bezirk Piaseczyński (PP) verbessert wird. Das Projekt wird in Partnerschaft mit PP (Leader) und Gemeinden durchgeführt: Konstancin-Jeziorna (KJ) und Góra Kalwaria (GK) – Partner, in 8 öffentlichen Versorgungsgebäuden im Bezirk Piaseczyński, darunter 5 Gebäude der PP, 1 der Gemeinde KJ und 2 der Gemeinde GK. Der materielle Umfang des Projekts umfasst die Thermomodernisierung folgender Einrichtungen: das Starostwo-Gebäude in ul. Czajewicza 2/4 in Piaseczno (Am. Effective Energy (EN) – 84,43 %), das Gebäude der 1. Kościuszko Division LO in Piaseczno (EN-65,31 %), das Gebäude der ZS RCKU Schule in Piaseczno (EN-51,20 %), 2 DPS-Gebäude in KJ (1 langsame Stände und 3 Verbindungen – EN 68,45-86,84 %). Alle Gebäude entsprechen daher dem Zugangskriterium (KD) Nr. 3. Der Umfang der Arbeiten zur Verbesserung der Energieeffizienz wird auf der Grundlage von Energieaudits (KD 1) definiert. Das Ziel wird durch umfassende Thermomodernisierungsaktivitäten erreicht, die gegebenenfalls Folgendes umfassen: Isolierung der Außenwände des Gebäudes, einschließlich Außenwände, Dächer oder Böden, Austausch von Fenstern/Türen, Austausch von Beleuchtung für energieeffiziente Gebäude, Umbau von Heizsystemen, Bau von Lüftungs- und Klimaanlagen mit Rückgewinnung, Anwendung der Wetterautomatisierung, Installation von Mikro-Wärme-Kopplung für den Eigengebrauch, Installation von RES, Installation einzelner Wärmezähler und Warmwasser, Installation von Unterspannungsventilen und Thermostaten. Das Projekt wird zu einer Verbesserung der Energieeffizienz von Gebäuden führen, die unter die Thermomodernisierung fallen, um 64,46 % (KMS 1). Die förderfähigen Kosten des Projekts decken nur die in den Energieaudits (KD Nr. 1) genannten Aufgaben ab. Der Antragsteller führt ein Ex-post-Energieaudit (KD 2) durch. Das Projekt entspricht den Richtlinien in KD Nr. 5 und den Bestimmungen in KF Nr. 5. (German)
    7 December 2021
    0 references

    Identifiers

    RPMA.04.02.00-14-5323/16
    0 references