Increasing the energy efficiency of public buildings in the town of Novi Pazar, building of the ODMVR — Shumen, RU Novi Pazar (Q3886179)

From EU Knowledge Graph
Revision as of 17:00, 3 December 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Jump to navigation Jump to search
Project Q3886179 in Bulgaria
Language Label Description Also known as
English
Increasing the energy efficiency of public buildings in the town of Novi Pazar, building of the ODMVR — Shumen, RU Novi Pazar
Project Q3886179 in Bulgaria

    Statements

    0 references
    505,375.47 Bulgarian lev
    0 references
    257,741.49 Euro
    1 December 2021
    0 references
    602,680.53 Bulgarian lev
    0 references
    307,367.07 Euro
    1 December 2021
    0 references
    0.84 percent
    0 references
    15 September 2016
    0 references
    28 June 2019
    0 references
    0 references

    43°20'49.96"N, 27°11'44.30"E
    0 references
    Настоящото проектно предложение включва дейности за подобряване на енергийната ефективност на административната сграда на РУ на МВР гр. Нови пазар, допринасящи за намаляване на крайното потребление на енергия и косвено – за намаляване на емисиите на парникови газове в малките градове – опорни центрове на полицентричната система, съгласно НКПР. Мерките ще имат и допълнителен ефект, тъй като ще осигурят рентабилна експлоатация на обществената сграда, което ще позволи устойчиво да продължи управлението и поддръжката ѝ. Изпълнението на заложените в проектното предложение дейности ще допринесат за: • Достигане клас на енергопотребление „В“ в сградата на административната сграда на РУ на МВР гр. Нови пазар.• Намаляване на разходите за енергия.• По-високо ниво на енергийната ефективност, което пряко да допринесе за намаляване на крайното енергийно потребление и косвено - за намаляване на емисиите на парникови газове в малките градове• Постигане на индикативните национални цели за пестене на енергия за 2020 г., заложени в Националния план за действие за енергийна ефективност 2014- 2020 г.; • Осигуряване на по-добро качество на въздуха, условия за живот и работна среда в съответствие с критериите за устойчиво развитие; • Подобряване на експлоатационните характеристики за удължаване на жизнения цикъл на сградата; • Запазване на традиционните функции на малките градове - опорни центрове, свързани с предлагане на обществени услуги, не само за местното население, но също и за населението на околните периферни райони. Предвидените по проекта енергоспестяващи мерки и задължителните мерки от обследването на техническите характеристики ще се изпълняват въз основа на направените обследвания за съответната сграда. (Bulgarian)
    0 references
    This project proposal includes activities to improve the energy efficiency of the administrative building of the Regional Department of the Ministry of the Interior of Novi Pazar, contributing to the reduction of final energy consumption and indirectly to reducing greenhouse gas emissions in small towns — backbone centres of the polycentric system, according to the NCPR. The measures will also have an additional effect as they will ensure the cost-effective operation of the public building, allowing the sustainable continuation of its management and maintenance. The implementation of the activities set out in the project proposal will contribute to: • A higher level of energy efficiency, which will directly contribute to reducing final energy consumption and indirectly — reducing greenhouse gas emissions in small towns • Achieving the indicative national energy saving targets for 2020 set in the National Action Plan for Energy Efficiency 2014-2020; • Ensuring better air quality, living conditions and working environments in line with sustainable development criteria; • Improvement of performance to extend the life cycle of the building; • Preserving the traditional functions of small towns — backbone centres for the provision of public services, not only for the local population but also for the populations of the surrounding peripheral areas. The energy-saving measures provided for in the project and the mandatory measures of the technical performance audit will be carried out on the basis of the audits carried out for the building concerned. (English)
    2 December 2021
    0 references
    Нови пазар
    0 references

    Identifiers

    BG16RFOP001-2.001-0012
    0 references