Strengthening the recreational and tourist potential of Western Pomerania by building an ethnographic park in Niechorze – Stage I, a way to develop a local labour market based on the endogenous potential of the Rewal municipality (Q138020)
Jump to navigation
Jump to search
Project Q138020 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Strengthening the recreational and tourist potential of Western Pomerania by building an ethnographic park in Niechorze – Stage I, a way to develop a local labour market based on the endogenous potential of the Rewal municipality |
Project Q138020 in Poland |
Statements
2,495,234.9 zloty
0 references
2,935,570.52 zloty
0 references
85.0 percent
0 references
2 November 2017
0 references
31 December 2020
0 references
MIŁOŚNICY TRADYCJI RYBOŁÓWSTWA BAŁTYCKIEGO W NIECHORZU
0 references
Projekt (P) wpisuje się katalog przedsięwzięć z regulaminu: odtwórstwo/rekonstrukcja historyczna miejsca i czasu wraz z przystosowanie rekonstruowanych obiektów do celów wystawienniczych i edukacyjno-turystycznych. Rekonstrukcja dotyczy historycznej zabudowy rybackiej wsi pomorskiej wraz z tradycyjnymi funkcjami historycznymi: wypiek chleba, wędzenie ryb i przygotowanie potraw (do 20% kk). Planowany P przyczyni się do rozwoju wielofunkcyjnej infrastruktury rekreacyjnej, jak i zwiększenie atrakcyjności turystycznej Gminy Rewal. Wnioskodawca (W) przewiduje następujące prace rekonstrukcyjne: wiatraka z Niechorza (obecnie prowadzona), tradycyjnego domu halowego z Niechorza, domu halowego na potrzeby ekspozycyjno – gastronomiczne, rekonstrukcja wędzarni ryb oraz pieca chlebowego z Kępy. Ponadto, zagospodarowanie terenu, poprowadzenie niezbędnych mediów oraz zakup niezbędnego wyposażenia. Działalność handlowa będzie tylko w stopniu pomocniczym i jest niezbędna do pokrycia kosztów funkcjonowania. Wnioskodawca zakłada realizację P z udziałem dwóch wykonawców: 1) prac budowlanych oraz 2) dostawcy wyposażenia. P zgodnie z harmon. Z SW będzie wdrażany w kolejności: 1) uzyskano pozwolenia na budowę, 2)przygotowano SW oraz WOD, 3) przeprowadzenie wyboru wykonawcy prac budowlanych, podpisanie umowy, prace budowlane, odbiór końcowy, 4) przeprowadzenie wyboru dostawców wyposażenia, podpisanie umowy, dostawa wyposażenia, 5) rozliczenie końcowe zadania inwestycyjnego. Bezpośrednio po realizacji P Wnioskodawca uruchomi Park Etnograficzny – przedsięwzięcie nie wymaga dodatkowych działań (innych projektów, itp.) do pełnego wykorzystania - I etap stanowi funkcjonalną całość. W gwarantuje zasoby techniczne (wszelkie niezbędne zasoby są w posiadaniu członków stow.), kadrowych (planowane jest zatrudnienie wykwalifikowanej obsługi Parku) oraz wiedzy (członkowie Stowa. posiadają wiedzę niezbędną do uruchomienia i prowadzenia Parku) zapewniającej uruchomienie infrastruktury po zakończeniu P. (Polish)
0 references
The draft (P) shall be entered in the catalogue of projects of the Rules of Procedure: recreation/reconstruction of the place and time together with the adaptation of reconstructed objects for exhibition and educational and tourism purposes. The reconstruction concerns the historical development of the Pomeranian fishing village with traditional historical functions: baking bread, smoking fish and preparing dishes (up to 20 % kk). The planned P will contribute to the development of multifunctional recreational infrastructure, as well as to increase the tourist attractiveness of the Rewal Commune. The applicant (W) shall provide for the following reconstruction works: windmill from Niechorz (currently run), a traditional hall house from Niechorz, a hall house for exhibition and catering purposes, reconstruction of fish smokehouse and bread oven from Kępa. In addition, land development, maintenance of the necessary media and purchase of necessary equipment. Commercial activities will only be ancillary and necessary to cover operating costs. The applicant assumes the implementation of P with the participation of two contractors: 1) construction works and 2) equipment suppliers. P according to Harmon. The SW will be implemented in order of: 1) Construction permits were obtained, 2) SW and WOD were prepared, 3) selection of the contractor for construction works, signing of the contract, construction works, final acceptance, 4) selection of equipment suppliers, signing of the contract, supply of equipment, 5) final settlement of the investment task. Immediately after the implementation P The applicant will launch the Ethnographic Park – the project does not require additional activities (other projects, etc.) for full use – the first stage is a functional whole. The guarantee of technical resources (all necessary resources are held by members of the table), personnel (skilled service of the Park is planned) and knowledge (members of Stowa. have the necessary knowledge to run and run the Park) ensuring the commissioning of the infrastructure after the end of P. (English)
21 October 2020
0 references
Le projet (P) est inscrit dans le catalogue des projets du Règlement intérieur: restauration/reconstruction historique du lieu et du temps ainsi que l’adaptation d’objets reconstruits à des fins d’exposition et d’éducation et de tourisme. La reconstruction concerne les bâtiments historiques du village de pêcheurs de Poméranie, ainsi que les fonctions historiques traditionnelles: faire cuire du pain, fumer du poisson et préparer des plats (jusqu’à 20 % de kk). Le projet P contribuera au développement d’infrastructures récréatives multifonctionnelles ainsi qu’à accroître l’attrait touristique de la municipalité de Rewal. Le demandeur (W) envisage les travaux de reconstruction suivants: moulin à vent de Niechorze (actuellement géré), maison intérieure traditionnelle de Niechorze, maison intérieure d’exposition et de gastronomie, reconstruction d’un fumoir à poissons et d’un four à pain de Kępa. En outre, l’aménagement du terrain, l’entretien des supports nécessaires et l’achat de l’équipement nécessaire. Les activités commerciales ne seront que accessoires et sont nécessaires pour couvrir les coûts d’exploitation. La requérante suppose la mise en œuvre de P avec la participation de deux contractants: 1) travaux de construction et 2) fournisseurs d’équipements. P selon l’harmon. Avec le SW sera mis en œuvre dans l’ordre de: 1) les permis de construire ont été obtenus, 2) le SW et la WOD ont été préparés, 3) la sélection de l’entrepreneur pour les travaux de construction, la signature du contrat, les travaux de construction, la réception finale, 4) la sélection des fournisseurs d’équipements, la signature du contrat, la livraison des équipements, 5) le règlement définitif de la tâche d’investissement. Immédiatement après la mise en œuvre du P, la requérante lancera le parc ethnographique — le projet n’exige pas d’activités supplémentaires (autres projets, etc.) pour être pleinement exploitées — la première étape constitue un tout fonctionnel. Il garantit les ressources techniques (toutes les ressources nécessaires sont détenues par les membres du chantier), le personnel (l’emploi d’un service qualifié du parc est prévu) et les connaissances (les membres de Stowa. ont les connaissances nécessaires pour exploiter et gérer le parc) assurant la mise en service de l’infrastructure après l’achèvement de P. (French)
2 December 2021