“Construction of 0,4 MW photovoltaic installations on roofs of sorting and composting plants in RZGO in Słajsin” (Q137790)

From EU Knowledge Graph
Revision as of 21:53, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’investissement prévu est stationnaire et consistera en la construction d’installations photovoltaïques sur les toits de l’usine de tri et de compostage de l’usine régionale de gestion des déchets d’une capacité totale de 400 kW, dont: — 350 kW sur le toit de l’usine de compostage; — 50 kW sur le toit de l’usine de tri à Słajsin sur la parcelle no 66/10, zone no 0040. Dans le cadre de l’investissement prévu, la requérante a précisé les étapes s...)
Jump to navigation Jump to search
Project Q137790 in Poland
Language Label Description Also known as
English
“Construction of 0,4 MW photovoltaic installations on roofs of sorting and composting plants in RZGO in Słajsin”
Project Q137790 in Poland

    Statements

    0 references
    1,184,078.71 zloty
    0 references
    284,178.89 Euro
    13 January 2020
    0 references
    1,973,464.53 zloty
    0 references
    473,631.49 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    14 July 2015
    0 references
    30 March 2019
    0 references
    CELOWY ZWIAZEK GMIN R - XXI
    0 references
    0 references
    Planowana do realizacji inwestycja wykazuje charakter stacjonarny i polegać będzie na budowie instalacji fotowoltaicznych na dachach sortowni i kompostowni Regionalnego Zakładu Gospodarowania Odpadami o łącznej mocy 400 kW, w tym: - 350 kW na dachu kompostowni; - 50 kW na dachu sortowni w Słajsinie na działce nr 66/10, nr obrębu 0040. W ramach planowanej inwestycji Wnioskodawca wyszczególnił następujące etapy realizacji przedsięwzięcia: 1. Przeprowadzenie procedury zapytania ofertowego dla realizacji zadania związanego z wykonaniem projektu budowlanego. 2. Projekt budowlany. 3. Uzyskanie pozwolenia na budowę. 4. Przeprowadzenie procedury zapytania ofertowego dla realizacji zadania związanego z wykonaniem studium wykonalności dla projektu. 5. Opracowanie dokumentacji aplikacyjnej – studium wykonalności. 6. Przeprowadzenie procedury w formie przetargu nieograniczonego – realizacja robót budowlanych w zakresie instalacji fotowoltaicznych. 7. Realizacja robót budowlanych – budowa instalacji fotowoltaicznych na dachach sortowni i kompostowni. 8. Odbiór końcowy robót i rozliczenie końcowe zadania inwestycyjnego. 9. Promocja projektu. 10. Nadzór inwestorski. Energia elektryczna wyprodukowana w ramach powstałych instalacji PV w całości zostanie wykorzystana na potrzeby własne Wnioskodawcy. (Polish)
    0 references
    The planned investment is stationary and will consist of the construction of photovoltaic installations on the roofs of the sorting plant and composting plant of the Regional Waste Management Plant with a total capacity of 400 kW, including: — 350 kW on the roof of the composting plant; — 50 kW on the roof of the Słajsin sorting plant on plot No. 66/10, No. 0040. As part of the planned investment, the applicant specified the following stages of the project: 1. Carrying out the procedure for requesting an offer for carrying out the task related to the execution of the construction project. 2. It’s a construction project. 3. Obtaining a building permit. 4. Carrying out a request procedure for the execution of a feasibility study for the project. 5. Development of application documentation – feasibility study. 6. Carrying out the procedure in the form of an open tender – execution of construction works in the field of photovoltaic installations. 7. Construction works – construction of photovoltaic installations on roofs of sorting and composting plants. 8. Final receipt of works and final settlement of the investment task. 9. Promotion of the project. 10. It’s investor supervision. The electricity produced by the resulting PV installations will be used entirely for the applicant’s own needs. (English)
    21 October 2020
    0 references
    L’investissement prévu est stationnaire et consistera en la construction d’installations photovoltaïques sur les toits de l’usine de tri et de compostage de l’usine régionale de gestion des déchets d’une capacité totale de 400 kW, dont: — 350 kW sur le toit de l’usine de compostage; — 50 kW sur le toit de l’usine de tri à Słajsin sur la parcelle no 66/10, zone no 0040. Dans le cadre de l’investissement prévu, la requérante a précisé les étapes suivantes du projet: 1. Réalisation d’une procédure d’appel d’offres pour l’exécution d’une tâche liée à l’exécution d’un projet de construction. 2. Projet de construction. 3. L’obtention d’un permis de construire. 4. Réalisation d’une procédure d’appel d’offres pour la réalisation d’une étude de faisabilité du projet. 5. Préparation de la documentation relative à la demande — étude de faisabilité. 6. Exécution de la procédure sous forme d’appel d’offres ouvert — exécution de travaux de construction dans le domaine des installations photovoltaïques. 7. Travaux de construction — construction d’installations photovoltaïques sur les toits des usines de triage et de compostage. 8. Acceptation définitive des travaux et règlement définitif de la tâche d’investissement. 9. Promotion du projet. 10. Surveillance des investisseurs. L’électricité produite par les installations photovoltaïques qui en résultent sera entièrement utilisée pour répondre aux besoins propres de la requérante. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.10.00-32-B155/17
    0 references