Thermomodernisation of the public utility building – office: Hospital 4 in Barlink (Q137617)

From EU Knowledge Graph
Revision as of 20:28, 13 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q137617 in Poland
Language Label Description Also known as
English
Thermomodernisation of the public utility building – office: Hospital 4 in Barlink
Project Q137617 in Poland

    Statements

    0 references
    431,237.03 zloty
    0 references
    103,496.89 Euro
    13 January 2020
    0 references
    507,337.75 zloty
    0 references
    121,761.06 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 April 2018
    0 references
    30 November 2018
    0 references
    BARLINECKIE TOWARZYSTWO BUDOWNICTWA SPOŁECZNEGO SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ W BARLINKU
    0 references
    0 references
    W ramach inwestycji planuje się modernizację energetyczną budynku użyteczności publicznej przeznaczonej na biuro BTBS przy ul. Szpitalnej 4 w Barlinku.Ostatecznie planuje się, że w zakres prac wejdą następujące elementy:a) Wykończenie zewnętrzne:1)Ocieplenie ścian zewnętrznych metodą bezspoinową 13cm warstwą styropianu EPS 100.2) Ocieplenie stropodachu pełnego od zewnątrz konstrukcji z użyciem styropianu laminowanego papą (styropapy) gr.22 cm o współczynniku przewodności cieplnej ?=0,040 W/mK oraz wykonanie nowej izolacji przeciwwilgociowej stropodachu z papy.3)Ocieplenie stropu piwnic 12 cm warstwą styropianu. Współczynnik przewodności cieplnej styropianu ?=0,040 W/mK.4)Ocieplenie podłogi na gruncie 5 cm warstwą styropianu EPS 100 o współczynniku przewodzenia ciepła ?=0,036 W/(m K).b)Okna i drzwi.1)Wymiana luksferów na okno o współczynniku U ? 0,9 W/(m2K).2)Wymiana wyeksploatowanych okien na parterze budynku na energooszczędne okna z nawiewnikami sterowanymi automatycznie . Współczynnik przenikania ciepła okien U ? 0,9 W/(m2K).3) Wymiana wyeksploatowanych drzwi zewnętrznych na drzwi o niższych stratach ciepła.c)Instalacje ogrzewania.Kompleksowa wymiana instalacji grzewczej,w tym montaż nowych przewodów poziomych i pionowych, grzejników o małej pojemności wodnej wyposażonych w zawory termostatyczne, izolacja termiczna przewodów,automatyczna regulacja temperatury w funkcji temperatury zewnętrznej.Wykonanie nowego kompaktowego węzła cieplnego z obudową o mocy dostosowanej do zapotrzebowania na ciepło po termomodernizacji.Montaż licznika ciepła.d)Instalacje fotowoltaiki.Budowa na dachu kompletnej instalacji fotowoltaicznej o mocy 5kW wraz z powiązaniem instalacji z istniejąca w budynku instalacją elektroenergetyczną.c)Kompleksowa modernizacja oświetlenia.Po zakończeniu projektu możliwe będzie wykorzystanie pełnej funkcjonalności infr.powstałej w ramach realizacji projektu i nie będzie to wymagało wymagało już dodatkowych działań.Projekt jest stacjonarny. (Polish)
    0 references
    As part of the investment, energy modernisation of the public utility building is planned for BTBS office at ul. Hospital 4 in Barlink. Finally, it is planned that the following elements will be included in the scope of the work:a) Exterior finish:1)The insulation of the outer walls by means of a polyurethane method of 13 cm with a layer of Styrofoam EPS 100.2) Warming of the full ceiling from the outside of the structure with the use of polystyrene laminated polystyrene (styropapapa) gr.22 cm with thermal conductivity coefficient?=0.040 W/mK and making of a new insulation against insulation. Coefficient of thermal conductivity of styrofoam?=0,040 W/mK.4) Floor warming on the ground 5 cm with EPS 100 styrofoam layer with heat conductivity coefficient?=0.036 W/(m K.b)Windows and doors.1)Exchange of luxpheres into a window with U coefficient? 0.9 W/(m2K).2) Replacement of the excavated windows on the ground floor of the building for energy-saving windows with automatically controlled vents. The heat transfer factor of U windows? 0.9 W/(m2K).3) The replacement of the external door with lower heat losses.c)Installation of heating.Comprehensive replacement of the heating system, including installation of new horizontal and vertical pipes, radiators with low water capacity equipped with thermostatic valves, the thermal insulation of the installation, the automatic temperature control in the function of the external temperature.The implementation of a new compact heat integer with the in-house thermal installation of the required power. (English)
    21 October 2020
    0 references
    Dans le cadre de l’investissement, il est prévu de moderniser le bâtiment d’utilité publique au bureau des BTB à ul. Hôpital 4 à Barlink.Enfin, il est prévu que les éléments suivants seront inclus dans le champ d’application de l’ouvrage: a) Finition extérieure: 1)Veuillement des parois extérieures par une méthode sans couture de 13 cm de mousse de mousse EPS 100.2) Réchauffement du sol plein de l’extérieur de la structure à l’aide de polystyrène stratifié avec gr.22 cm avec coefficient de conductivité thermique?=0,040 W/mK et la mise en œuvre d’un nouveau stropode anti-humidité avec papa.3)Rarmer le plafond des caves 12 cm avec une couche de styfoam. Coefficient de conductivité thermique du styromousse?=0,040 W/mK.4) Réchauffement du sol avec une couche de polystyrène EPS 100 avec un coefficient de conduction thermique?=0,036 W/(m K).b)Windows et portes.1)Remplacement du lux à une fenêtre par un facteur U? 0.9 W/(m2K).2)Remplacement des fenêtres actionnées au rez-de-chaussée du bâtiment par des fenêtres économes en énergie avec diffuseurs à commande automatique. Coefficient de transfert de chaleur des fenêtres en U? 0.9 W/(m2K).3) Remplacement des portes extérieures épuisées pour les portes avec des pertes de chaleur plus faibles.c)Installations de chauffage.Remplacement complet du système de chauffage, y compris l’installation de nouveaux fils horizontaux et verticaux, des appareils de chauffage à faible capacité d’eau équipés de vannes thermostatiques, isolation thermique des fils, contrôle automatique de la température en fonction de la température extérieure. (French)
    2 December 2021
    0 references
    Im Rahmen der Investition ist geplant, das öffentliche Versorgungsgebäude in das Büro der BTBs in ul zu bringen. Krankenhaus 4 in Barlink.Schließlich ist geplant, dass die folgenden Elemente in den Umfang der Arbeit aufgenommen werden:(a) Außerhalb der Ausführung:1)Einsatz der Außenwände mit einer nahtlosen Methode von 13 cm EPS Styroporschicht 100.2) Erwärmung des Unterbodens voll von außen der Struktur mit Polystyrol laminiert mit gr.22 cm mit thermischer Leitfähigkeitskoeffizient?=0,40 W/mK und die Umsetzung eines neuen feucht-proofing stropod mit papa.3)Warmen der Decke der Keller 12 cm mit einer Schicht Styrofoam. Wärmeleitfähigkeitskoeffizient von Styropor?=0.040 W/mK.4) Erwärmung des Bodens auf dem Boden mit einer Schicht EPS 100 Polystyrol mit einem Wärmeleitwert?=0.036 W/(m K).b)Windows und Türen.1)Austausch von Lux an ein Fenster mit einem U-Faktor? 0.9 W/(m2K).2)Ersatz von betätigten Fenstern im Erdgeschoss des Gebäudes mit energiesparenden Fenstern mit automatisch gesteuerten Diffusoren. Wärmeübertragungskoeffizient von U-Fenstern? 0.9 W/(m2K).3) Ersatz der erschöpften Außentüren für Türen mit geringeren Wärmeverlusten.c)Heizanlagen. Umfassender Austausch von Heizsystemen, einschließlich der Installation neuer horizontaler und vertikaler Drähte, Heizungen mit geringer Wasserkapazität, ausgestattet mit Thermostatventilen, Wärmedämmung der Drähte, automatische Temperaturregelung in Abhängigkeit von der Außentemperatur. (German)
    13 December 2021
    0 references

    Identifiers

    RPZP.02.05.00-32-A039/16
    0 references