Energy modernisation of the House of Social Welfare in Resk (Q137608)

From EU Knowledge Graph
Revision as of 21:32, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet consiste à réaliser une modernisation énergétique approfondie et complète de la maison de protection sociale à la demande. À la suite de la reconstruction, une chaufferie à gaz de condensation sera créée en coopération avec l’installation existante de capteurs solaires et l’installation d’une chaudière de chauffage pour la biomasse. Dans le bâtiment principal, la buanderie et la chaudière, le système de chauffage central et l’installat...)
Jump to navigation Jump to search
Project Q137608 in Poland
Language Label Description Also known as
English
Energy modernisation of the House of Social Welfare in Resk
Project Q137608 in Poland

    Statements

    0 references
    3,698,334.88 zloty
    0 references
    887,600.37 Euro
    13 January 2020
    0 references
    4,350,982.22 zloty
    0 references
    1,044,235.73 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2014
    0 references
    30 September 2019
    0 references
    POWIAT ŁOBESKI
    0 references
    0 references
    Projekt zakłada wykonanie głębokiej, kompleksowej modernizacji energetycznej Domu Pomocy Społecznej w Resku. W wyniku przebudowy powstanie kondensacyjna kotłownia gazowa współpracująca z istniejącą instalacją kolektorów słonecznych oraz montaż kotła grzewczego na biomasę. W budynku głównym, budynku pralni i kotłowni instalacja centralnego ogrzewania oraz instalacja ciepłej wody użytkowej i cyrkulacji zostanie przebudowana. Przegrody zewnętrzne zostaną ocieplone, izolacja przeciwwilgociowa w budynkach zostanie wykonana. Strop poddasza nieogrzewanego w budynku głównym został ocieplony w 2014 roku. Stropodach wentylowany oraz połać dachowa w budynku pralni i kotłowni zostanie ocieplona. Wymienione zostaną wyeksploatowane drzwi oraz okna zewnętrze i fasada. Instalacja wentylacji mechanicznej pomieszczeń kuchni ze stołówką w budynku głównym, pomieszczeń pralni zostanie przebudowana. Zamontowane zostanie energooszczędne oświetlenie w budynku głównym, budynku pralni i kotłowni. Ponadto zamontowana zostanie instalacja paneli fotowoltaicznych na dachu łącznika. Zaproponowane rozwiązania pozwolą na najbardziej efektywne wykorzystanie energii cieplnej i elektrycznej dostarczanej do budynku. (Polish)
    0 references
    The project involves the implementation of a deep, comprehensive energy modernisation of the Social Assistance House in Resk. As a result of the reconstruction, a condensation gas boiler room will be created, cooperating with the existing installation of solar collectors and the installation of a heating boiler for biomass. In the main building, the central heating system and the installation of hot water and circulation will be reconstructed in the main building, the laundry and boiler room. The outer bulkheads will be warmed up, the damp insulation in the buildings will be made. The roof of the unheated loft in the main building was warmed up in 2014. Ventilated ceilings and roof panels in the laundry and boiler room building will be warmed up. The excavated doors and exterior windows and façade will be replaced. Installation of mechanical ventilation of kitchen rooms with canteen in the main building, laundry rooms will be rebuilt. Energy-efficient lighting will be installed in the main building, the laundry building and the boiler room. In addition, the installation of photovoltaic panels on the roof of the connector will be installed. The proposed solutions will allow for the most efficient use of heat and electricity supplied to the building. (English)
    21 October 2020
    0 references
    Le projet consiste à réaliser une modernisation énergétique approfondie et complète de la maison de protection sociale à la demande. À la suite de la reconstruction, une chaufferie à gaz de condensation sera créée en coopération avec l’installation existante de capteurs solaires et l’installation d’une chaudière de chauffage pour la biomasse. Dans le bâtiment principal, la buanderie et la chaudière, le système de chauffage central et l’installation d’eau chaude et de circulation seront reconstruits. Les cloisons extérieures seront isolées, l’isolation anti-humidité dans les bâtiments sera réalisée. Le plafond du grenier non chauffé dans le bâtiment principal a été isolé en 2014. Les sols ventilés et la toiture dans le bâtiment de la buanderie et de la chaufferie seront isolés. Les portes et les fenêtres et façades extérieures seront remplacées. Installation de ventilation mécanique des salles de cuisine avec cantine dans le bâtiment principal, salles de lavage seront reconstruites. Un éclairage économe en énergie sera installé dans le bâtiment principal, la buanderie et la chaufferie. En outre, l’installation de panneaux photovoltaïques sur le toit du connecteur sera installée. Les solutions proposées permettront l’utilisation la plus efficace de la chaleur et de l’électricité fournies au bâtiment. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.05.00-32-A022/16
    0 references