Revision as of 21:28, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Dans le cadre de l’investissement, 6 bâtiments inclus dans la coopérative d’habitation «Piast» à BarLink à ul. Supérieur 28,Kościelna 1, Cour No 1 et No 2, Lac 2, Chmielna 1.Les travaux comprendront la thermomodernisation des bâtiments dans la gamme de: 1) le réchauffement des cloisons extérieures: murs longitudinaux, murs de crête, balustrades et loggias, 2) les tropodes, les plafonds sur les garages et les caves, 3) le remplacement de la menui...)
Jump to navigation Jump to search
Project Q137646 in Poland
Language Label Description Also known as
English
Energy modernisation of 6 Housing Buildings SM Piast in Barlink
Project Q137646 in Poland

    Statements

    0 references
    838,960.0 zloty
    0 references
    201,350.4 Euro
    13 January 2020
    0 references
    2,662,661.5 zloty
    0 references
    639,038.76 Euro
    13 January 2020
    0 references
    31.51 percent
    0 references
    2 April 2018
    0 references
    29 November 2019
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA "PIAST" W BARLINKU
    0 references
    0 references
    W ramach inwestycji planuje się modernizację energetyczną 6 budynków wchodzących w skład Spółdzielni Mieszkaniowej "Piast" w Barlinku przy ul. Górnej 28,Kościelnej 1, Sądowej nr 1 i nr 2, Jeziornej 2,Chmielnej 1.Prace obejmą termomodernizację budynków w zakresie:1)ocieplenia przegród zewnętrznych:ścian podłużnych,szczytowych ,balustrad i loggii,2)stropodachów,stropów nad garażami i piwnicami,3)wymiana stolarki okiennej w częściach wspólnych klatek i piwnic,4)instalacja C.O – zostanie wykonane przyłącze do sieci cieplnej oraz zainstalowanie jednofunkcyjnego węzła cieplnego, jak również wymiana istniejących zaworów podpionowych i grzejnikowych wraz z głowicami termostatycznymi,5)wymiana żarówek. W związku z faktem, iż obecnie w częściach wspólnych obiektów są stare, tradycyjne żarówki żarowe, planuje się ich wymianę na nowoczesne żarówki typu LED.Ponadto dla obiektu przy ul.Górnej 28 zostaną zamontowane panele fotowoltaiczne oraz likwidacja niskoparametrowej lokalnej sieci cieplnej na rzecz wysokoparametrowego przyłącza c.o. oraz montaż kompaktowego węzła cieplnego.Szczegółowy zakres został przedstawiony w SW 3.1.3,4.1.3.2.Powyższe prace są konieczne aby zrealizować zaplanowany zakres związany z termomodernizacją. Rezultatem projektu będzie: spadek emisji gazów cieplarnianych [tony równoważnika CO2/rok] o 327,55toeCO2/rok,ilość zaoszczędzonej energii cieplnej w wysokości 3120,44 GJ/rok,ilość zaoszczędzonej energii elektrycznej w wysokości 6,37 MWh/rocznie,a także zmniejszenie zużycia energii końcowej w wyniku realizacji projektu o 3144,59GJ/rok.Efektem będzie także poddanie modernizacji 12.464,41m2 powierzchni mieszkalnej,zamieszkałej przez 215 gosp.domowych.Po zakończeniu projektu możliwe będzie wykorzystanie pełnej funkcjonalności infr.powstałej w ramach realizacji projektu i nie będzie to wymagało już dodatkowych działań.Projekt w swoich założeniach ma charakter stacjonar (Polish)
    0 references
    As part of the investment, the energy modernisation of 6 buildings included in the “Piast” Housing Cooperative in Barlink is planned at ul. Upper 28,Castral 1, Judicial No.1 and No.2, Lake 2,Chmielna 1.Works will include thermal modernisation of buildings in the range of:1)warming of outer partitions:longitudinal walls, peak walls, balustrades and loggia,2)stropods, ceilings over garages and cellars,3)change of window carpentry in common parts of cages and cellars,4) Due to the fact that currently in common areas there are old, traditional incandescent bulbs, they are planned to be replaced with modern LED bulbs.In addition, for the facility at ul.Górna 28, photovoltaic panels and the liquidation of the low-parameter local heat network for the high-parameter hot tubing will be installed as well as the installation of a compact thermal node.Detailed scope is presented in SW 3.1.3,4.1.3.2. The result of the project will be: the decrease in greenhouse gas emissions [tonnes of CO2/year equivalent] by 327.55toeCO2/year, the amount of heat savings of 3120.44 GJ/year, the amount of electricity saved at 6.37 MWh/year, and the reduction of final energy consumption as a result of the project by 3144.59GJ/year. (English)
    21 October 2020
    0 references
    Dans le cadre de l’investissement, 6 bâtiments inclus dans la coopérative d’habitation «Piast» à BarLink à ul. Supérieur 28,Kościelna 1, Cour No 1 et No 2, Lac 2, Chmielna 1.Les travaux comprendront la thermomodernisation des bâtiments dans la gamme de: 1) le réchauffement des cloisons extérieures: murs longitudinaux, murs de crête, balustrades et loggias, 2) les tropodes, les plafonds sur les garages et les caves, 3) le remplacement de la menuiserie des fenêtres dans les parties communes des cages et des sous-sols, 4) l’installation C.O — sera raccordé au réseau de chaleur et installera un nœud thermique à fonction unique, ainsi que le remplacement des vannes verticales et radiateurs existantes par des têtes thermostatiques, 5) le remplacement des ampoules. En raison du fait qu’actuellement dans les parties communes des bâtiments sont des ampoules à incandescence traditionnelles anciennes, il est prévu de les remplacer par des ampoules LED modernes. En outre, pour l’installation à ul.Górna 28, des panneaux photovoltaïques seront installés et la suppression du réseau de chaleur local à faible paramètre en faveur d’une connexion thermique à haut paramètre et l’installation d’un nœud thermique compact. Le champ d’application détaillé est défini dans SW 3.1.3,4.1.3.2.Les travaux ci-dessus sont nécessaires pour compléter le champ d’application prévu de la thermomodernisation. Le résultat du projet sera: une diminution des émissions de gaz à effet de serre [tonnes d’équivalent CO2/an] de 327 55 à CO2/an, la quantité de chaleur économisée de 3120,44 GJ/an,la quantité d’électricité économisée de 6,37 MWh/an, et la réduction de la consommation finale d’énergie à la suite du projet d’ici 3144,59 GJ/an.Le résultat sera également la modernisation de 12 464,41 m² de surface habitable,habitée par 215 gosp.domowe.Après l’achèvement du projet, il sera possible d’utiliser la pleine fonctionnalité de l’en. (French)
    2 December 2021
    0 references

    Identifiers

    RPZP.02.07.00-32-B006/17
    0 references