Freestanding photovoltaic installation with a maximum power of 0,95 MWp in Stare Czarnowo (Q137685)
Jump to navigation
Jump to search
Project Q137685 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Freestanding photovoltaic installation with a maximum power of 0,95 MWp in Stare Czarnowo |
Project Q137685 in Poland |
Statements
2,274,495.49 zloty
0 references
3,055,668.3 zloty
0 references
74.44 percent
0 references
1 December 2016
0 references
30 April 2017
0 references
„SELFA GRZEJNICTWO ELEKTRYCZNE” SPÓŁKA AKCYJNA
0 references
Przedsięwzięcie polegać będzie na posadowieniu instalacji fotowoltaicznej o mocy maksymalnej 0,95 MWp. Inwestycja zlokalizowana będzie w miejscowości Stare Czarnowo, w powiecie gryfińskim. Projekt ma charaktery stacjonarny. Swoim zasięgiem będzie obejmować działki o numerach ew. 74/2, 78/12, 78/14. Łączna powierzchnia przeznaczona pod inwestycję wynosi do 1,5 ha. Instalacja będzie się składać z 3652 modułów o wymiarach ok. 982 mm x 1670 mm i mocy 260 Wp każdy, montowanych na wolnostojących stelażach. Instalacja będzie w pełni zautomatyzowana i podłączona do systemu monitoringu, analizującego wydajność i uzysk energetyczny. Do jej budowy wykorzystane zostaną moduły PV, montowane na stelażach z zachowaniem przerw pomiędzy poszczególnymi rzędami stelaży. W ujęciu bardziej uszczegółowionym instalację fotowoltaiczną tworzyć będą następujące elementy: konstrukcje wolnostojące wbijane w ziemię do montażu modułów PV; moduły PV w ilości 3.652 szt. o mocy 260W każdy; inwertery w ilości do 50 szt. o mocy do 50 kVA; kablowe linie energetyczne niskiego napięcia układane w ziemi, na głębokości 70 ÷ 80 cm; stacja transformatorowa SN/Nn kontenerowa o wymiarach około 3x6 m i wysokości do 4 m z transformatorem 15/0,4 kV, moc znamionowa pozorna do 1250 kVA; przyłącze elektroenergetyczne średniego napięcia. Dla projektu przygotowana została karta informacyjna, uzyskano decyzję o braku obowiązku sporządzania raportu oddziaływania na środowisko. Projekt wymaga pozwolenia na budowę, w dniu 13.05.2016r. złożono wniosek o jego wydanie. Rozpoczęcie realizacji inwestycji planowane jest na początek września, inwestycja obejmuje przygotowanie gruntu, posadowienie instalacji oraz podłączenie jej do sieci energetycznej. Zakończenie inwestycji planowane jest na pierwszą połowę grudnia. Ok 8% wyprodukowanej energii zostanie zużytej na potrzeby własne: oświetlenie, zasilanie urządzeń w trybie stand by, monitoring wizyjny instalacji. Pozostałe 92% zostanie odprowadzone do sieci do odsprzedaży. (Polish)
0 references
The project will consist of planting a photovoltaic installation with a maximum capacity of 0,95 MWp. The investment will be located in Stare Czarnowo, in the Gryfin County. The project has a stationary character. The range will include plots with numbers of 74/2, 78/12, 78/14. The total area for the investment is up to 1.5 ha. The installation will consist of 3652 modules with dimensions approx. 982 mm x 1670 mm and 260 Wp each, mounted on standalone frames. The installation will be fully automated and connected to a monitoring system analysing efficiency and energy yield. For its construction, PV modules will be used, mounted on the frames, while maintaining gaps between individual rows of frames. In a more detailed way, the photovoltaic installation will create the following elements: ground-mounted freestanding structures for the installation of PV modules; PV modules in the amount of 3.652 units with a capacity of 260 W each; inverters up to 50 units up to 50 kVA; cable power lines of low voltage laid in the ground, at a depth of 70 ÷ 80 cm; SN/Nn container transformer station with dimensions of approximately 3x6 m and height up to 4 m with 15/0.4 kV transformer, rated output up to 1250 kVA; medium-voltage power supply. An information sheet was prepared for the project, and the decision was not made to compile an environmental impact report. The project requires a construction permit, and an application for its issue was submitted on 13.05.2016. The investment is planned to start at the beginning of September, the investment includes preparing the land, planting the plant and connecting it to the power grid. Completion of the investment is planned for the first half of December. About 8 % of the energy produced will be consumed for own consumption: lighting, power supply in stand by mode, video surveillance of the installation. The remaining 92 % will be returned to the network for resale. (English)
21 October 2020
0 references
Le projet consistera à planter une installation photovoltaïque d’une capacité maximale de 0,95 MWc. L’investissement sera situé à Stare Czarnowo, dans le comté de Gryfin. Le projet est stationnaire. Il couvrira les colis portant les numéros 74/2, 78/12, 78/14. La superficie totale des investissements s’élève à 1,5 hectare. L’installation se composera de 3652 modules avec des dimensions d’env. 982 mm x 1 670 mm et puissance 260 Wp chacun, monté sur châssis autoportants. L’installation sera entièrement automatisée et connectée au système de surveillance, en analysant l’efficacité et le rendement énergétique. Pour sa construction, des modules PV seront utilisés, montés sur des cadres, en gardant les écarts entre les différentes rangées de racks. Plus précisément, l’installation PV créera les éléments suivants: structures détachées pour le montage de modules photovoltaïques; Modules PV d’une quantité de 3.652 pcs d’une puissance de 260 W chacun; onduleurs jusqu’à 50 pièces jusqu’à 50 kVA; câbles basse tension posés dans le sol, à une profondeur de 70 ″ 80 cm; station de transformateur SN/Nn conteneur d’environ 3x6 m et hauteur jusqu’à 4 m avec transformateur 15/0,4 kV, puissance nominale jusqu’à 1250 kVA; connexion d’alimentation moyenne tension. Une fiche d’information a été préparée pour le projet, une décision a été obtenue de ne pas établir de rapport d’impact sur l’environnement. Le projet nécessite un permis de construire et une demande a été présentée le 13 mai 2016. Le début de l’investissement est prévu pour début septembre, l’investissement comprend la préparation du terrain, la fondation de l’installation et sa connexion au réseau électrique. L’achèvement de l’investissement est prévu pour la première quinzaine de décembre. Environ 8 % de l’énergie produite sera consommée à des fins propres: éclairage, alimentation en mode veille, surveillance visuelle de l’installation. Les 92 % restants seront retournés au réseau en vue de leur revente. (French)
2 December 2021
0 references
Identifiers
RPZP.02.10.00-32-A032/16
0 references