TŘEBOŇ, OLD CLAY – DRAINAGE AND WWTP (Q59912)
Jump to navigation
Jump to search
Project Q59912 in Czech Republic
Language | Label | Description | Also known as |
---|---|---|---|
English | TŘEBOŇ, OLD CLAY – DRAINAGE AND WWTP |
Project Q59912 in Czech Republic |
Statements
12,998,436.93 Czech koruna
0 references
20,389,705.0 Czech koruna
0 references
63.75 percent
0 references
1 October 2016
0 references
31 March 2019
0 references
Město Třeboň
0 references
37901
0 references
Obsahem projektu je výstavba ČOV a splaškové kanalizace (s jednou čerpací stanicí) ve Staré Hlíně - místní části města Třeboně. Na novou kanalizaci bude napojeno 243 trvale žijících obyvatel. ČOV je navržena o kapacitě 304 EO. (Czech)
0 references
The project includes the construction of the WWTP and sewage sewerage (with one petrol station) in Staré Hlín – the local part of the city Třeboň. 243 permanent residents will be connected to the new sewer system. The WWTP is designed with a capacity of 304 EO. (English)
23 October 2020
0 references
Le projet consiste en la construction d’une station d’épuration des eaux usées et d’un réseau d’égouts (avec une station-service) à Stará Hlín, la partie locale de la ville de Třeboň. 243 résidents permanents seront raccordés au nouveau réseau d’assainissement. La WWTP est conçue avec une capacité de 304 EO. (French)
28 November 2021
0 references
Das Projekt umfasst den Bau von WWTP und Kanalisation (mit einer Tankstelle) in Stará Hlín – dem Ortsteil der Stadt Třeboň. 243 permanente Bewohner werden an die neue Kanalisation angeschlossen. Der WWTP ist mit einer Kapazität von 304 EO ausgelegt. (German)
2 December 2021
0 references
Identifiers
CZ.05.1.30/0.0/0.0/15_021/0001266
0 references