“Construction of sanitary sewage system in the Agglomeration Old Town, towns of Żjary and Barczygłów” (Q135047)

From EU Knowledge Graph
Revision as of 21:04, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Dans le cadre de ce projet, il est prévu de construire un réseau d’assainissement sanitaire dans la région de Stare Miasto Agglomeration, dżary et Barczygłów.Dans la zone du village de dżary, il est prévu de construire 1708 mb d’un réseau de drainage d’égouts par gravité à partir de tuyaux en PVC -U 200/5,9 mm SN 8,428 mb, un réseau de drainage des conduites de triwar PE 100 RC. SDR 17 PN 1 090 mm, 153 m de branches latérales de tuyaux en PVC —...)
Jump to navigation Jump to search
Project Q135047 in Poland
Language Label Description Also known as
English
“Construction of sanitary sewage system in the Agglomeration Old Town, towns of Żjary and Barczygłów”
Project Q135047 in Poland

    Statements

    0 references
    1,834,372.31 zloty
    0 references
    440,249.35 Euro
    13 January 2020
    0 references
    2,158,085.08 zloty
    0 references
    517,940.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    3 February 2020
    0 references
    31 December 2020
    0 references
    GMINA STARE MIASTO
    0 references
    W ramach projektu planuje się budowę sieci kanalizacji sanitarnej na terenie Aglomeracji Stare Miasto, miejscowości Żdżary i Barczygłów.Na terenie miejscowości Żdżary planuje się wybudowanie 1708 mb sieci kanalizacji sanitarnej grawitacyjnej z rur PVC –U 200/5,9 mm SN 8,428 mb, sieci kanalizacji tłocznej z rur PE 100 RC trójwar. SDR 17 PN 10 90 mm, 153 mb odgałęzień bocznych z rur PVC –U 160/4, 7 mm SN 8, 1 podziemną przepompownię ścieków oraz 47 odgałęzień bocznych.Na terenie miejscowości Barczygłów powstanie natomiast 1065 mb sieci kanalizacji sanitarnej grawitacyjnej z rur KAM 200 mm, 14 mb sieci kanalizacji tłocznej z rur PE 100 RC trójwar. SDR 17 PN 10 90 mm, 266 mb odgałęzień bocznych z rur PVC – U 160/4, 7 mm SN 8, 5 podziemnych przepompowni ścieków oraz 59 odgałęzień bocznych.Przewidziane działania przyczynią się do osiągnięcia celu projektu, jakim jest zachowanie i ochrona środowiska naturalnego oraz wspieranie efektywnego gospodarowania zasobami. Zadaniem projektowanej kanalizacji sanitarnej jest uporządkowanie gospodarki ściekowej Gminy Stare Miasto, zapobiec niekontrolowanemu zrzutowi ścieków do gruntu i cieków wodnych oraz likwidacji zbiorników na ścieki.Roboty budowlane zostaną przeprowadzone w ramach zadań "Budowa sieci kanalizacji - Żdżary" oraz "Budowa sieci kanalizacyjnej - Barczygłów". Ponadto w ramach projektu przewidziano realizację zadań "Nadzór inwestorski" oraz "Informacja i promocja", które są niezbędne do zapewnienia prawidłowego wdrożenia inwestycji oraz wypełnienia obowiązków informacyjnych Beneficjenta.W efekcie realizacji projektu w 2020 r. osiągnięty zostanie wskaźnik produktu "Długość wybudowanej kanalizacji sanitarnej" - 3,634 km (Polish)
    0 references
    The project plans to build a sanitary sewer system in the Agglomeration Stare Miasto, the town of Żjary and Barczygłów.In the area of Żjary, it is planned to build 1708 mb of the sewage system made of gravitational sanitary pipes PVC – U 200/5.9 mm SN 8.428 m, a pipe drainage system PE 100 RC triwar. SDR 17 PN 1090 mm, 153 mb side branches from PVC-U 160/4, 7 mm SN 8, 1 underground sewage pumping station and 47 side branches.In the area of Barczygłów there will be 1065 m of the sewer system of the gravitational sanitary pipes KAM 200 mm, 14 m of the exhaust drainage system from PE 100 RC triwar pipes. SDR 17 PN 1090 mm, 266 mb side branches from PVC pipes – U 160/4, 7 mm SN 8, 5 underground sewage pumping plants and 59 side branches.The planned actions will contribute to the project’s goal of preserving and protecting the environment and supporting resource efficiency. The task of the designed sanitary sewage system is to organise the sewage management of Stare Miasto commune, prevent uncontrolled discharge of sewage into land and watercourses and liquidate wastewater.The construction works will be carried out as part of the tasks “Construction of sewage networks – Żjara” and “Construction of sewage network – Barczygłów”. Moreover, the project provides for the implementation of the tasks “Investor Supervision” and “Information and Promotion”, which are necessary to ensure proper implementation of the investment and fulfil the information obligations of the beneficiary.As a result of the project’s implementation in 2020, the “Length of built sanitary sewage system” – 3.634 km will be achieved. (English)
    21 October 2020
    0 references
    Dans le cadre de ce projet, il est prévu de construire un réseau d’assainissement sanitaire dans la région de Stare Miasto Agglomeration, dżary et Barczygłów.Dans la zone du village de dżary, il est prévu de construire 1708 mb d’un réseau de drainage d’égouts par gravité à partir de tuyaux en PVC -U 200/5,9 mm SN 8,428 mb, un réseau de drainage des conduites de triwar PE 100 RC. SDR 17 PN 1 090 mm, 153 m de branches latérales de tuyaux en PVC — U 160/4, 7 mm SN 8, 1 station souterraine de pompage des eaux usées et 47 branches latérales. Dans la zone de Barczygłów, un réseau d’assainissement par gravité de 1065 mb de canalisations KAM 200 mm, 14 mb de réseau de décharge de tuyaux PE 100 RC sera construit. SDR 17 PN 1 090 mm, 266 mb de branches latérales en PVC — U 160/4, 7 mm SN 8, 5 stations de pompage d’eaux usées souterraines et 59 branches latérales.Les actions envisagées contribueront à l’objectif du projet de préservation et de protection de l’environnement naturel et de promotion de l’utilisation efficace des ressources. L’objectif du système d’assainissement prévu est d’organiser la gestion des eaux usées de la municipalité de Stare Miasto, d’empêcher le rejet incontrôlé des eaux usées dans le sol et les cours d’eau et de déclasser les réservoirs d’eaux usées. En outre, le projet prévoit la mise en œuvre des tâches «Suivi des investisseurs» et «Information et promotion», qui sont nécessaires pour assurer la bonne mise en œuvre de l’investissement et remplir les obligations d’information du bénéficiaire.À la suite de la mise en œuvre du projet en 2020, l’indicateur de réalisation «Longueur d’assainissement sanitaire construit» — 3,634 km sera atteint. (French)
    2 December 2021
    0 references

    Identifiers

    RPWP.04.03.01-30-0030/17