Thermal modernisation of the School Complex in Sieroszewice. Thermal Modernisation of the School Complex in Wielowsi (Q134854)
Jump to navigation
Jump to search
Project Q134854 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the School Complex in Sieroszewice. Thermal Modernisation of the School Complex in Wielowsi |
Project Q134854 in Poland |
Statements
856,765.81 zloty
0 references
1,007,959.78 zloty
0 references
85.0 percent
0 references
29 October 2015
0 references
1 October 2018
0 references
GMINA SIEROSZEWICE
0 references
1. Przedmiot projektu Przedmiotem projektu jest kompleksowa modernizacja energetyczna 2 budynków użyteczności publicznej na terenie gminy Sieroszewice 2. Zakres rzeczowy 2.1. Budynek Szkoły Podstawowej w Sieroszewicach – adres: Sieroszewice, ul. Szkolna 9: - termomodernizacja stropodachu warstwą gr. 15 cm granulowanej wełny mineralnej o współczynniku ?=0,041W/(mK) na stropie parteru i I piętra; - docieplenie ścian zewnętrznych piwnicy warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - docieplenie ścian zewnętrznych parteru i piętra warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - wymiana okien istniejących o współczynniku U =2,2 W/(m2*K) na okna o współczynniku U=1,1 W/(m2*K); - wymiana drzwi zewnętrznych istniejących o współczynniku U =2,7 W/(m2*K) na drzwi o współczynniku U=1,1-1,6 W/(m2*K). 2.2. Budynek Szkoły Podstawowej w Wielowsi - adres: Wielowieś, ul. Grabowska 2: - termomodernizacja stropodachu warstwą gr. 15 cm wełny mineralnej granulowanej o współczynniku ?=0,052W/(mK) na stropie parteru; - docieplenie ścian zewnętrznych piwnicy warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - docieplenie ścian zewnętrznych parteru warstwą gr. 12 cm styropianu o współczynniku ?=0,040W/(mK); - wymiana okien istniejących o współczynniku U =1,8 W/(m2*K) na okna o współczynniku U=1,1 W/(m2*K); - wymiana drzwi zewnętrznych istniejących o współczynniku U =2,5 W/(m2*K) na drzwi o współczynniku U=1,1-1,6 W/(m2*K); - wymiana instalacji centralnego ogrzewania i kotłów. 3. Produkty projektu W wyniku realizacji projektu zostaną osiągnięte następujące produkty: - Liczba zmodernizowanych energetycznie budynków – 2 szt. - Powierzchnia użytkowa budynków poddanych termomodernizacji – 3 361,7 m2; - Liczba zmodernizowanych źródeł ciepła – 1 szt. (Polish)
0 references
1. Subject of the project The subject of the project is comprehensive energy modernisation of 2 public utility buildings in the municipality of Sieroszewice 2. Material scope 2.1. Building of the Primary School in Sieroszewice – address: Sieroszewice, ul. School day 9: — thermo-modernisation of the stropode with a layer of gr. 15 cm of granulated mineral wool with a coefficient?=0,041W/(mK) on the floor floor and the first floor; — insulation of the outer walls of the basement with a layer of gr. 12 cm of styrofoam with a factor of?=0,040W/(mK); — insulation of the exterior walls of the ground floor and floor with a layer of 12 cm styrofoam with a factor of?=0,040W/(mK); — replacement of existing windows with U = 2,2 W/(m²*K) for windows with U = 1,1 W/(m²*K); — replacement of existing external doors with a factor U = 2,7 W/(m²*K) for a door with a factor U=1.1-1.6 W/(m²*K). IT’S 2.2. Building of the Primary School in Wielowsi – address: Big boy, hive. Grabowska 2: — thermo-modernisation of the stropode with a layer of gr. 15 cm of granulated mineral wool with a coefficient?=0,052W/(mK) on the floor floor; — insulation of the outer walls of the basement with a layer of gr. 12 cm of styrofoam with a factor of?=0,040W/(mK); — warming of the outer walls of the ground floor with a layer of 12 cm of styrofoam with a factor of?=0,040W/(mK); — replacement of existing windows with U = 1,8 W/(m²*K) for windows with U = 1,1 W/(m²*K); — replacement of existing external doors with a factor U = 2,5 W/(m²*K) for a door with a factor U=1.1-1.6 W/(m²*K); — replacement of central heating and boiler systems. 3. Project products As a result of the project, the following products will be achieved: — Number of energy-upgraded buildings – 2 pieces. — The usable area of buildings undergoing thermal upgrade – 3361,7 m²; — Number of modernised heat sources – 1 pcs. (English)
21 October 2020
0 references
1. L’objet du projet est la modernisation énergétique complète de 2 bâtiments publics dans la municipalité de Sieroszewice 2. Champ d’application matériel 2.1. Construction de l’école primaire à Sieroszewice — adresse: Sieroszewice, St. École 9: — thermomodernisation du stropode avec une couche de 15 cm de laine minérale granulaire avec un coefficient de?=0,041W/(mK) aux étages du rez-de-chaussée et du premier étage; — réchauffement des parois extérieures du sous-sol avec une couche de jeu. 12 cm de polystyrène avec un coefficient?=0,040W/(mK); — réchauffement des parois extérieures du rez-de-chaussée et du sol avec une couche de polystyrène de 12 cm de jeu avec un coefficient?=0,040W/(mK); — remplacement des fenêtres existantes par un coefficient U = 2,2 W/(m²*K) par des fenêtres avec un coefficient de U=1,1 W/(m²*K); — remplacement des portes extérieures existantes par un coefficient U = 2,7 W/(m²*K) pour les portes avec un coefficient de U=1,1-1,6 W/(m²*K). 2.2. Construction de l’école primaire à Wielowsi — adresse: Wielowieś, St. Grabowska 2: — thermomodernisation du stropode avec une couche de 15 cm de laine minérale granulée avec un coefficient de?=0,052W/(mK) au rez-de-chaussée; — réchauffement des parois extérieures du sous-sol avec une couche de jeu. 12 cm de polystyrène avec un coefficient?=0,040W/(mK); — réchauffement des parois extérieures du rez-de-chaussée avec une couche de jeu. 12 cm de polystyrène avec un coefficient?=0,040W/(mK); — remplacement des fenêtres existantes par un coefficient U = 1,8 W/(m²*K) par des fenêtres avec un coefficient de U=1,1 W/(m²*K); — remplacement des portes extérieures existantes par un coefficient U = 2,5 W/(m²*K) pour les portes d’un coefficient U=1,1-1,6 W/(m²*K); — remplacement des installations de chauffage central et des chaudières. 3. Résultats du projet À la suite de la mise en œuvre du projet, les produits suivants seront obtenus: — Nombre de bâtiments modifiés par l’énergie — 2 — Surface utilisable des bâtiments soumis à modernisation thermique — 3 361,7 m²; — Nombre de générateurs de chaleur modernisés — 1 pcs. (French)
2 December 2021
0 references
Identifiers
RPWP.03.02.04-30-0002/16
0 references