Construction of roads for bicycles in Osieczna commune as part of the action to reduce low emissions in the Leszczyńska Agglomeration (Q134886)
Jump to navigation
Jump to search
Project Q134886 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of roads for bicycles in Osieczna commune as part of the action to reduce low emissions in the Leszczyńska Agglomeration |
Project Q134886 in Poland |
Statements
6,400,500.0 zloty
0 references
7,530,000.0 zloty
0 references
85.0 percent
0 references
1 July 2019
0 references
14 December 2020
0 references
GMINA OSIECZNA
0 references
Przedmiotem projektu jest budowa 10,662km dróg dla rowerów na terenie gm. Osieczna, należącej do Leszczyńskiego Obszaru Strategicznej Interwencji.Budowa ciągów pieszo-rower w ciągu dróg pow. na odc: Osieczna-Świerczyna,Świerczyna-Ziemnice, Łoniewo-Grodzisko,Grodzisko-Świerczyna,w m.Świerczyna.Zostaną też wybudowane 2 miejsca przesiadkowe. W miejscach tych wybudowane/zorganizowane zostaną miejsca parkingowe dla samochodów (z miejscami dla os. niepełnosprawnych), zamontowane zostaną stojaki rowerowe w wiatach oraz efektywne energetycznie oświetlenie (solarne).Zaplanowano również umieszczenie informacji o powstałych ścieżkach w aplikacji internetowej o połączeniach komunikacji zbiorowej na terenie powiatu (aplikacja należy do Partnera, stworzona w ramach projektu nr RPWP.03.03.01-30-0036/16). Z uwagi na fakt, że bardzo ważnym elementem projektu jest pobudzanie świadomości i odpowiedzialności społeczeństwa za jakość powietrza,działaniom inwestycyjnym towarzyszyć będą działania inform-prome skierowane do mieszk. gminy i leszczyńskiego obszaru funkcjonalnego. Ma to na celu wzmocnienie wśród mieszkańców poczucia konieczności akceptacji działań prowadzonych do ograniczania zanieczyszczeń powietrza,emitowanych głównie przez samochody.Efekty rzeczowe-Dł. wspartej infrastruktury rower-10,662km/2020r.-Licz wybud. zintegrowanych węzł przesiadkowych- 2 szt/2020r.-Licz akcji i kampanii infor-prom-1 szt./2020r.-Licz nowych/zmodern punktów świetlnych- 2 szt/2020r-Licz miejsc postojowych dla os niepełnospr. w wybud. obiektach „parkuj i jedź”- 6/2020r-Licz miejsc postojowych w wybud. obiektach „parkuj i jedź”-46/2020r-Licz stanowisk postojowych w wybud. obiektach „Bikeamp;Ride”-40szt. /2020r-Licz wybud. obiektów „Bikeamp;Ride” -2 szt/2020r.-Licz wybud. obiektów „parkuj i jedź-2 szt/2020r.Projekt stanowi uzupełnienie inwestycji Powiatu i ma za zadanie połączenie istniejących odcinków dróg rowerowych i stworzenie spójnej sieci, która swoim zasięgiem oddziaływać będzie na cały obszar LO (Polish)
0 references
The subject of the project is the construction of 10.662 km of roads for bicycles in the area of Osieczna, belonging to the Strategic Intervention Area of Leszczyński.Construction of walking-bicycles along the roads over the area: Osieczna-Świerczyna, Świerczyna-Ziemnice, Łoniewo-Grodzisko, Grodzisko-Świerczyna, in Swierczyna. 2 transfer places will also be built. In these places there will be built/organised parking spaces for cars (with spaces for people with disabilities), bicycle stands in the worlds and energy-efficient lighting (solar) will be installed.It is also planned to include information about the created paths in the web application on public transport connections in the district (the application belongs to the Partner, created within the framework of project no RPWP.03.03.01-30-0036/16). Due to the fact that an important element of the project is to stimulate public awareness and responsibility for air quality, the investment activities will be accompanied by information-Prome actions aimed at residents of the municipality and Leszno functional area. This is aimed at strengthening among residents the sense of the need to accept activities carried out to reduce air pollution, emitted mainly by cars.Commercial effects-For the supported infrastructure of bicycle-10.662 km/2020r.-Number of built-in interchanges- 2 pcs/2020r.-Number of actions and campaigns infor-prom-1 pcs/2020r.-Number of new/smodern lighting points- 2 pcs/2020r-Number of parking spaces for parking places. /2020r-Number of buildings "Bikeamp;Ride" -2 pcs/2020-Number of buildings "park and drive-2 pcs/2020r.The project complements the investment of the District and aims to combine existing sections of bicycle roads and create a coherent network that will affect the entire area of LO (English)
21 October 2020
0 references
Le projet a pour objet la construction de 10 662 km de routes pour vélos à Osieczna, appartenant à la zone d’intervention stratégique de Leszczyński. Osieczna-Świerczyna, Swierczyna-Earnice, Łoniewo-Grodzisko, Grodzisko-Świerczyna, à Swierczyna. 2 places de transfert seront également construites. Des places de stationnement pour les voitures seront construites/organisées dans ces lieux (avec des places pour personnes handicapées), des stands cyclables seront installés dans les mondes et un éclairage économe en énergie (solaire) sera installé. Il est également prévu d’inclure dans l’application internet des informations sur les connexions de transport public dans le comté (l’application appartient au partenaire, créé dans le cadre du projet RPWP.03.03.01-30-0036/16). Étant donné qu’un élément très important du projet est de sensibiliser le public et de responsabiliser le public en matière de qualité de l’air, les activités d’investissement s’accompagneront d’activités d’information destinées à la commune et à la zone fonctionnelle de Leszno. Ceci vise à renforcer le sentiment d’acceptation par les résidents de la nécessité d’accepter des actions menées pour réduire la pollution de l’air, émise principalement par les voitures. Effets sur la nature-vélo soutenu par l’infrastructure longue-10,662 km/2020r.-Nombre de nœuds de transfert intégrés — 2 pcs/2020-Nombre d’actions et de campagnes infor-prom-1 pcs./2020-Nombre de points de lumière nouveaux/modernes — 2 pc/2020-Nombre de places de stationnement pour guêpes en construction. 6/2020r-Nombre d’espaces de stationnement dans la construction d’installations «park and drive»-46/2020r-Nombre de stations de stationnement dans la construction de «Bikeamp;Ride»-40pcs. /2020r-comte construction de "Bikeamp;Ride" -2 pcs/2020-Nombre de bâtiments "park and drive-2 pcs/2020r.Le projet complète l’investissement du District et vise à relier les tronçons existants de routes cyclables et à créer un réseau cohérent qui affectera toute la zone de la LO (French)
2 December 2021
0 references
Identifiers
RPWP.03.03.01-30-0007/18
0 references