Thermal modernisation of the building of the Municipality and Municipality in Skoki (Q134832)
Jump to navigation
Jump to search
Project Q134832 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation of the building of the Municipality and Municipality in Skoki |
Project Q134832 in Poland |
Statements
640,210.87 zloty
0 references
753,189.27 zloty
0 references
85.0 percent
0 references
7 April 2015
0 references
14 November 2018
0 references
GMINA SKOKI
0 references
Realizacja proj. przebiegać będzie w ramach jednego zadania–termomodernizacja budynku Urzędu Miasta i Gminy w Skokach. Proj.realiz.będzie w okresie 07.04.2015r.-14.11.2018r. W ramach proj.wykonane zostaną następujące prace: -Ocieplenie 1 253,11m2 ścian zewn.-styropian EPS-70 ?=0,032 W/m2K,gr.14 cm -Ociepl.78,91m2 ścian piwnic-styropian ekstrudowany XPS-150 ?=0,037 W/m2K,gr.12 cm -Ociepl.291,6m2 stropodachu niewentyl.(seg.A)-płyty warstwowe PW-11 EPS-100 ?=0,041 W/m2K,gr.15 cm -Ociepl.405,99m2 stropodachu niewentyl.(seg.B)-płyty warstwowe PW-11 EPS-100 ?=0,041W/m2K,gr.15 cm -Wym.drzwi i starych okien o łącznej pow.25,42m2 o U=0,9 W/m2*K Realiz.proj.obejmuje uspr. wentylacji mech.:montaż rekuperatorów ciepła i wym. instalacji na agregaty z odzysk. ciepła i chłodzenia z wymiennikiem obrot. Realiz.proj.zakłada moderniz. instalacji c.o.: -Zmiana2 kotłów węglowych na 1 gazowy k. kondensacyjny -Wym. instalacji c.o. -Wym.grzejników, montaż zaworów termostatycznych, regulacja pogodowa i czasowa Proj. zakłada wykonane prace budowl.: Rozbudowa budynku UMiG o hol wejściowy(13,34m2) i wykonanie podestu i pochylni dla wózków inwalidzkich(17,65m2) W wyniku realiz. ww. zapotrzebowanie na energię/rok zmniejszy się 68,79%. W ramach proj. wykonane zostaną nast.prace budowlane: -Rozbudowa budynku UMiG w Skokach o hol wejściowy wraz z wykonaniem podestu i pochylni dla wózków inwalidzkich W ramach projektu wykonane zostaną następujące roboty towarzyszące: -Wymurowanie kominów -Prace dekarskie i ślusarskie (opierzenie,parapety itd) -Wym. inst. odgromowej -Roboty uzupełniające(przełożenie nr policyjnych,tablic info) Ponadto w ramach proj. zostaną poniesione koszty związane z opracowaniem dok. technicznej (proj. budowlany, audyt energet., ekspertyza ornitolog. i chiropterolog.),nadzorem budowl. oraz promocją proj. Produkty proj.(rok osiągnięcia-2018): -Lb zmodernizowanych energetycznie budynków-1 szt -Lb zmodernizowanych źródeł ciepła–1 szt -Pow.użyt.-1453,90 m2 (Polish)
0 references
Implementation of the project will take place within one task-thermal modernisation of the building of the City and Municipality in Skoki. Proj.realiz. will be in the period 07.04.2015-14.11.2018r. The following work will be carried out under the project: The warming of 1253.11 m² of external walls.-styrofoam EPS-70?=0.032 W/m2K,gr.14 cm -Owarpl.78,91 m² of cellar-styrofoam walls extruded XPS-150?=0.037 W/m2K,gr.12 cm -78 cm-Owarpl. Realiz.proj.establishes a modernised central heating system: —Changing 2 coal boilers to 1 gas condensation station -Central heating system, thermostatic valve assembly, weather and time control The project assumes construction works: Expansion of the UMiG building with an entrance hall (13.34 m²) and construction of a platform and ramp for wheelchairs (17.65 m²) The energy demand/year will decrease 68.79 % as a result of the above-mentioned energy demand. As part of the project, the following construction work will be carried out: —Expansion of the UMiG building in Skoki with the entrance hall with the construction of a platform and ramp for wheelchairs As part of the project, the following accompanying works will be carried out: —stacking of chimneys -Dearing and locksmithing works (smoking, parapets, etc.) -Additional work(police no., table info) In addition, costs related to the development of technical doc. (construction project, energet audit, ornithologist expert, and chiropterologist) will be incurred as part of the project. Projected products (year of achievement-2018): —Lb of energy-upgraded buildings-1 pcs -Lb of modernised heat sources-1 pcs -Pow.Use.-1453,90 m² (English)
21 October 2020
0 references
Le projet sera mis en œuvre dans le cadre d’une tâche unique — la thermomodernisation de la construction de l’hôtel de ville et de la municipalité de Skoki. Proj.realiz. sera dans la période 07.04.2015r.-14.11.2018r. Les travaux suivants seront réalisés dans le cadre du projet: —Chauffage 1 253,11 m² de parois extérieures EPS-70?=0,032 W/m2K,gr.14 cm -Ociepl.78,91 m² de caves-styromousse extrudée XPS-150?=0,037 W/m2K,gr.12 cm -Ociepl.291,6 m² de stock non ventilé. gr.15 cm -Ociepl.405,99 m² de panneaux de non-ventil.(sex.B)-couche PW-11 EPS-100?=0.041W/m2K,gr.15 cm -Échange de portes et fenêtres anciennes d’une surface totale de 25,42 m² avec U=0.9 W/m²*K Realiz.proj.comprend la ventilation mech: installation de récupérateurs de chaleur et installation pour les refroidisseurs avec échangeur de chaleur et de refroidissement. Realiz.proj.comprend la modernisation de l’installation centrale: —Changement2 de chaudières au charbon à 1 condensation de gaz k. — Échange de systèmes de chauffage, installation de vannes thermostatiques, conditions météorologiques et de régulation du temps Proj. implique des travaux de bâtiments. L’extension du bâtiment umig avec hall d’entrée (13,34 m²) et la construction d’une plate-forme et d’une rampe pour fauteuils roulants (17,65 m²) À la suite de la mise en œuvre de la demande d’énergie susmentionnée diminuera de 68,79 %. Dans le cadre du projet, les travaux de construction suivants seront réalisés: —Agrandissement du bâtiment umig à Skoki avec hall d’entrée avec la construction d’une plate-forme et d’une rampe pour fauteuils roulants Dans le cadre du projet, les travaux d’accompagnement suivants seront réalisés: —Moulage de cheminées — Décoration et serrurier (protection, seuils de fenêtre, etc.) -Ext. foudre -Robots complémentaires (transmission des numéros de police, des tableaux d’information) En outre, les coûts liés au développement de documents techniques (projet de construction, audit énergétique, opinion d’expert ornithologue et chiroptérologue.), la supervision des bâtiments et la promotion du projet seront engagés dans le cadre du projet. Produits du projet (année de réalisation-2018): —Lb bâtiments modifiés par l’énergie-1 pcs -Lb de sources de chaleur modernisées-1 pcs -Pow.use-1 453,90 m² (French)
2 December 2021
0 references
Identifiers
RPWP.03.02.03-30-0004/16
0 references