The development and ordering of empty publ spaces through the construction of a sports square.-rekreac. at SP No 1 in Ornet, together with the adaptation of the premises SP No. 1 to increase sports and artistic activity of people at risk of exclusion of the community. (Q132727)

From EU Knowledge Graph
Revision as of 06:53, 9 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q132727 in Poland
Language Label Description Also known as
English
The development and ordering of empty publ spaces through the construction of a sports square.-rekreac. at SP No 1 in Ornet, together with the adaptation of the premises SP No. 1 to increase sports and artistic activity of people at risk of exclusion of the community.
Project Q132727 in Poland

    Statements

    0 references
    1,799,891.92 zloty
    0 references
    431,974.06 Euro
    13 January 2020
    0 references
    2,358,348.96 zloty
    0 references
    566,003.75 Euro
    13 January 2020
    0 references
    76.32 percent
    0 references
    1 April 2020
    0 references
    30 October 2021
    0 references
    GMINA ORNETA
    0 references
    0 references

    54°6'56.2"N, 20°7'49.1"E
    0 references
    Zakres projektu obejmuje: - Zagosp.terenów zielonych przy Szkole.Powstanie park dzielący się na dwie strefy:1.to rekreacyjno-sportowa z ogrodzonym boiskiem wielofunkc.,bieżnią do skoku w dal,bieżnią, siłownią zewn.,skocznią torem rolkowym o naw.betonowej oraz skateparkiem do jazdy ewolucyjnej na deskorolkach,łyżworolkach oraz rowerach. 2.strefa wypoczynkowa,w której projektuje się zestaw ławek ze stołem,zestaw ławek ze stołem do gry w szachy/chińczyka oraz plac zabaw wyposażony w różne sprzęty i urządzenia do zabawy dla najmłodszych. Ciągi pieszo-rowerowe i ścieżki piesze planuje się wykonać o naw.mineralnej,natomiast tor rolkowy o naw.betonowej.Oświetlenie ciągów kom. projektowane jest w postaci lamp parkowych w technologii LED oraz lampy z panelem fotowoltaicznym.Projektuje się również wykonanie instalacji monitoringu zewnętrznego.Wysoki standard rozwiązań i bogata nowa infrastruktura parku,stworzy miejsce rekreacji i wypoczynku adresowanego m.in.do mieszkańców Ornety, w tym zam. tereny wymagające rewit.. - adaptację pomieszczeń w istniejącym budynku Szkoły przy ul. Zamkowej 26. Działanie to polega na: wymianie stolarki okiennej i drzwiowej, remoncie ścian i podłóg, utworzeniu sanitariatów w piwnicy, wydzieleniu nowych pomieszczeń ścianami ścianami działowymi, remoncie inst.elektr, remoncie inst. c.o. i wod-kan, wykonaniu inst.wentylacji mechanicznej i dostosowanie wentylacji do obowiązujących norm, montażu elektrycznego krzesełka schodowego, wyposażaniu w niezbędne sprzęty (dotyczy tylko pomieszczeń wc). Działania planowane w ramach projektu zgodnie z zapisami SZOP mają służyć rewitalizacji przestrzeni publicznej. Możliwa tam będzie organizacja spotkań i zajęć dla osób zagrożonych wykluczeniem społecznym, dzięki czemu wzmocnione zostanie poczucie przynależności tych osób do ogółu społeczeństwa. Realizacja projektu stworzy warunki do integracji grup wykluczonych lub zagrożonych wykluczeniem społecznym. (Polish)
    0 references
    The scope of the project includes: The park is divided into two zones: 1.It is a recreational and sporting field with a fenced multifunctional field, a long-distance jump, a track, an outdoor gym, a roller track with a concrete roller track and a skatepark for skating on skateboards, roller skateboards and bicycles. 2.The seating area, which designs a set of benches with a table, a set of benches with a table for playing chess/Chinese, and a playground equipped with various equipment and facilities for playing games for the youngest. On foot-bicycles and footpaths are planned to be carried out with a mineral wall, while a roller track with a concrete surface is planned.Illustration of com. strings is designed in the form of park lamps in LED technology and lamps with photovoltaic panel.The project is also designed to make an external monitoring installation. High standard of solutions and rich new infrastructure of the park will create a place of recreation and recreation addressed, among others. — adaptation of rooms in the existing school building at ul. Locker 26. This action consists of: replacement of window and door carpentry, renovation of walls and floors, creation of sanitary facilities in the basement, separation of new rooms with partition walls, repair of inst.elektr, repair inst. c.o. and water-channel, manufacture of mechanical ventilation and adaptation of ventilation to the applicable standards, installation of an electric stairchair, fitting the necessary equipment (only for wc rooms). The activities planned under the project in accordance with the provisions of the SZOP are intended to revitalise the public space. It will be possible to organise meetings and activities for those at risk of social exclusion, thereby enhancing their sense of belonging to the general public. The implementation of the project will create the conditions for the integration of groups excluded or at risk of social exclusion. (English)
    21 October 2020
    0 references
    La portée du projet comprend: — Zones Zagosp.green à l’école.Il y aura un parc divisé en deux: un parc de loisirs et de sport avec un champ multifonctionnel clôturé, un parcours pour sauter au loin, un tapis de course, une salle de sport externe, une piste de saut de nef.concrete et un skateboard pour skateboards évolutionnaires, skateboards et vélos. 2.Le coin salon, où un ensemble de bancs avec une table est conçu, un ensemble de bancs avec une table d’échecs/table chinoise, et une aire de jeux équipée de divers équipements et équipements de jeux pour les plus jeunes. Des pistes de marche et de marche sont prévues à l’aide d’une piste aminérale, tandis qu’une piste à rouleaux avec voie naw.concrète.Illumination des cordes kom. est conçue sous la forme de lampes de parc en technologie LED et d’une lampe avec un panneau photovoltaïque. Il est également conçu pour effectuer une installation de surveillance externe. De haut niveau de solutions et de nouvelles infrastructures riches du parc, créera un lieu de loisirs et de loisirs destiné aux résidents d’Orneta, y compris les zones nécessitant REWIT.. — adaptation des locaux du bâtiment scolaire existant à ul. Château 26. Cette action consiste en: remplacement de la menuiserie des fenêtres et des portes, rénovation des murs et des planchers, création d’installations sanitaires dans le sous-sol, séparation des pièces neuves avec des cloisonnements, rénovation de inst.elektr, rénovation de l’inst. c.o. et canal d’eau, exécution de la ventilation mécanique et adaptation de la ventilation aux normes applicables, installation de chaise d’escalier électrique, équipement avec l’équipement nécessaire (applicable uniquement aux toilettes). Les activités prévues dans le cadre du projet conformément aux dispositions du SZOP visent à revitaliser l’espace public. Il sera possible d’organiser des réunions et des activités pour les personnes exposées au risque d’exclusion sociale, renforçant ainsi leur sentiment d’appartenance au grand public. La mise en œuvre du projet créera les conditions d’intégration des groupes exclus ou menacés d’exclusion sociale. (French)
    2 December 2021
    0 references
    Der Anwendungsbereich des Projekts umfasst: — Zagosp.green Areas an der Schule.Es wird ein Park in zwei unterteilt sein: ein Freizeit- und Sportpark mit einem eingezäunten multifunktionalen Feld, eine Rennbahn, um in die Ferne zu springen, ein Laufband, ein externes Fitnessstudio, eine springende Rollbahn von nave.concrete und ein Skateboard für evolutionäre Skateboards, Skateboards und Fahrräder. 2.The Sitzecke, wo ein Satz von Bänken mit einem Tisch entworfen ist, ein Satz von Bänken mit einem Schach/chinesischen Tisch, und ein Spielplatz mit verschiedenen Spielgeräten und Ausrüstung für die Jüngsten ausgestattet. Wander- und Wanderwege sind geplant, um mit einem mineralischen gemacht werden, während eine Rollbahn mit naw.concrete track.Illumination von kom. Saiten ist in Form von Parklampen in LED-Technologie und eine Lampe mit Photovoltaik-Panel konzipiert. Sie ist auch für die Durchführung einer externen Überwachungsinstallation. Hoher Standard an Lösungen und reiche neue Infrastruktur des Parks, wird einen Ort für Erholung und Erholung für Bewohner von Orneta, einschließlich Bereiche, die REWIT erfordern.. — Anpassung der Räumlichkeiten im bestehenden Schulgebäude in ul. Schloss 26. Diese Maßnahme umfasst: Austausch von Fenster- und Türtischlerei, Renovierung von Wänden und Böden, Schaffung von sanitären Einrichtungen im Keller, Trennung von neuen Räumen mit Trennwänden, Renovierung von inst.elektr., Renovierung von Inst. c.o. und Wasserkanal, Durchführung der mechanischen Lüftung und Anpassung der Lüftung an die geltenden Normen, Installation des elektrischen Treppenstuhls, Ausrüstung mit der notwendigen Ausrüstung (gilt nur für Toilettenräume). Die im Rahmen des Projekts gemäß den Vorgaben des SZOP geplanten Aktivitäten sollen den öffentlichen Raum neu beleben. Es wird möglich sein, Treffen und Aktivitäten für Menschen, die von sozialer Ausgrenzung bedroht sind, zu organisieren und so ihr Zugehörigkeitsgefühl zur breiten Öffentlichkeit zu stärken. Die Durchführung des Projekts wird Bedingungen für die Integration von Gruppen schaffen, die von sozialer Ausgrenzung ausgeschlossen sind oder von sozialer Ausgrenzung bedroht sind. (German)
    9 December 2021
    0 references

    Identifiers

    RPWM.08.01.00-28-0007/19
    0 references