“Expansion of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. “People” (Q135185)

From EU Knowledge Graph
Revision as of 19:53, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est l’extension du réseau routier. Sous trois ponts à Gniezno, sur la section d’al. Reymonta à St. Osiniec, qui conduit à la ZES et à la zone industrielle de la ville de Gniezno, assure ainsi la connexion directe nécessaire aux sites d’investissement existants. Le projet prévoit de reconstruire la route existante reliant Al. Reymonta d’ul. Ensoleillé pour env. 354 m et construction d’une nouvelle route à partir de ul. Ensoleill...)
Jump to navigation Jump to search
Project Q135185 in Poland
Language Label Description Also known as
English
“Expansion of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. “People”
Project Q135185 in Poland

    Statements

    0 references
    17,888,065.0 zloty
    0 references
    4,293,135.6 Euro
    13 January 2020
    0 references
    23,850,753.34 zloty
    0 references
    5,724,180.8 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    27 June 2017
    0 references
    31 October 2019
    0 references
    MIASTO GNIEZNO
    0 references
    0 references
    Przedmiotem projektu jest rozbudowa układu drogowego ul. Pod Trzema Mostami w Gnieźnie, na odcinku od al. Reymonta do ul. Osiniec, doprowadzającego do terenów SSE i obszaru przemysłowego Miasta Gniezna, a zatem zapewniającej konieczne bezpośrednie połączenie z istniejącymi terenami inwestycyjnymi. W ramach proj. planuje się przebudowę istniejącej drogi łączącej Al. Reymonta z ul. Słoneczną na dł. ok. 354 m oraz budowę nowej drogi na odcinku od ul. Słonecznej do ul. Osieniec na długości ok. 450 m. Ponadto inwestycja obejmuje elementy niezbędne do zrealizowania celu projektu, tj. sygnalizacja świetlna i dźwiękowa, chodniki i drogi rowerowe, odwodnienie powierzchniowe, oznakowanie pionowe i poziome, demontaż ist. przepompowni z piaskownikiem i wykonanie nowej przepompowni, a także demontaż ist. opraw oświetleniowych z słupami oraz kablem zasil. oraz zasilania demontowanej ist. przepompowni i oświetlenie oprawami LED oraz poszerzenie światła wiaduktu, jego pogłębienie i wykonanie nowych ścian oporowych w celu dostosowania do parametrów spełniających aktualne przepisyW ramach projektu zrealizowane zostaną nast. zadania:1. Przygotowanie projektu2. Roboty drogowe3. Nadzór inwestorski4. Informacja i promocja projektuW efekcie real. projektu osiągnięte zostaną nast. wskaźniki:produktu (kluczowe):Dł. wybudowanych dróg gminnych: 0,157 kmDł. przebudowanych dróg gminnych: 0,354 kmDł. wybudowanych dróg dla rowerów: 0,511 kmproduktu (specyficzne dla projektu):L. wybudowanych lub przebudowanych drogowych obiektów inżynierskich: 1 szt.Dł. wybudowanych lub przebudowanych chodników: 0,511 kmL. wybudowanych lub przebudowanych punktów oświetleniowych: 12 szt.L. wybudowanych lub przebudowanych skrzyżowań: 3 szt.rezultatu (specyficzne dla projektu):Średni czas przejazdu między dwoma punktami sieci: 1,39 minNośność drogi: 115 kN/oś (Polish)
    0 references
    The subject of the project is the extension of the road system ul. Under the Three Bridges in Gniezno, on the section from al. Reymonta to St. Osiniec, which leads to the SEZ and the industrial area of the City of Gniezno, and therefore provides the necessary direct connection with existing investment areas. As part of the project, it is planned to rebuild the existing road connecting Al. Reymonta from St. Sunshine approx. 354 m and construction of a new road on the section from ul. Sunny to St. It is on a length of approx. 450 m. In addition, the investment includes elements necessary to achieve the objective of the project, i.e. light and audible signalling, walkways and cycle paths, surface drainage, vertical and horizontal markings, dismantling of ist. pumping room with sandbox and execution of a new pumping room, as well as the dismantling of the objectives of the lighting luminaires with columns and power cable. Preparation of the project2. Roadworks3. Investor supervision4. Information and promotion of the project as a result of the project will be achieved next indicators:product (key): 0.157 kmL. of reconstructed communal roads: 0,354 kmL. of built roads for bicycles: 0,511 kmproduct (specific to the project):L. built or reconstructed road engineering facilities: 1 pieces of built or reconstructed sidewalks: 0,511 kmL. built or reconstructed lighting points: 12 units of L. built or reconstructed intersections: 3 pieces of result (specific to the project):The average journey time between two points of the network: 1,39 min Road load capacity: 115 kN/axis (English)
    21 October 2020
    0 references
    L’objet du projet est l’extension du réseau routier. Sous trois ponts à Gniezno, sur la section d’al. Reymonta à St. Osiniec, qui conduit à la ZES et à la zone industrielle de la ville de Gniezno, assure ainsi la connexion directe nécessaire aux sites d’investissement existants. Le projet prévoit de reconstruire la route existante reliant Al. Reymonta d’ul. Ensoleillé pour env. 354 m et construction d’une nouvelle route à partir de ul. Ensoleillé jusqu’à la rue. Osieniec en longueur env. 450 m. En outre, l’investissement comprend les éléments nécessaires à la réalisation de l’objectif du projet: signaux lumineux et sonores, chaussées et pistes cyclables, drainage de surface, marquage vertical et horizontal, démontage des stations de pompage avec bac à sable et construction d’une nouvelle station de pompage, démontage des appareils d’éclairage avec poteaux et alimentation électrique, alimentation électrique de la station de pompage démontée et éclairage avec luminaires LED et extension de la lumière du viaduc, son approfondissement et la construction de nouveaux murs de soutènement afin de s’adapter aux paramètres conformes aux dispositions actuelles du projet. Préparation du projet2. Travaux routiers3. Surveillance des investisseurs4. L’information et la promotion du projet à la suite du projet réel seront réalisées wskaźniki:produktu (clé):Pour la construction de routes municipales: 0,157 kmRoutes municipales construites: 0,354 kmPour les routes construites pour les vélos: 0,511 kmproduit (spécifique à la conception): 1 pcs pour chaussées construites ou reconstruites: 0,511 kmL. points d’éclairage construits ou reconstruits: 12 L. intersections construites ou reconstruites: 3 réalisations (spécifiques au projet): Durée moyenne du trajet entre deux points du réseau: 1,39 min Capacité de charge routière: 115 kN/essieu (French)
    2 December 2021
    0 references

    Identifiers

    RPWP.05.01.02-30-0016/16
    0 references