839,165.55 zloty
0 references
987,253.6 zloty
0 references
85.0 percent
0 references
29 January 2019
0 references
31 December 2020
0 references
GMINA SZCZYTNIKI
0 references
Przedsięwzięcie realizowane będzie na terenie gminy Szczytniki, w powiecie kaliskim, województwie wielkopolskim w obszarze Aglomeracji Szczytniki. Aglomeracja ta została wyznaczona Uchwałą Sejmiku Województwa Wielkopolskiego nr XXIII/633/16 Sejmiku Województwa Wielkopolskiego z dnia 31 października 2016 r. Odbiorcami projektu są mieszkańcy i przedsiębiorcy z terenu aglomeracji o równoważnej liczbie mieszkańców równej 3 608 RLM. Przedmiotem projektu jest budowa sieci kanalizacji sanitarnej z przyłączami dla odprowadzenia ścieków bytowo- gospodarczych z miejscowości Korzekwin i fragmentarycznie z miejscowości Popów do istniejącej sieci kanalizacyjnej w miejscowości Popów. Celem szczegółowym poddziałania jest zwiększony odsetek ludności korzystających z systemu oczyszczania ścieków.W ramach zadania (całego projektu) zostanie wykonane:-Kolektory grawitacyjne PVC?200mm – 2 483,1 m-Przyłącza kanalizacyjne PVC?160mm – 41 szt / 526,5 m-Rurociąg tłoczny PE?110mm – 1 639,7 m-Studzienki rewizyjne betonowe TB?1000- 22 szt.-Studzienki rozprężone ?1200 - 3 szt.-Studzienki rewizyjne ?400 – 50szt. -Przepompownie ścieków – 4 szt.-Kable energetyczne YAKXS (wewnętrzne linie zasilające) – 34,0 mBezpośrednimi odbiorcami będą mieszkańcy, którzy zostaną podłączeni do sieci kanalizacyjnej z miejscowości: Korzekwin oraz Popów. Wartość projektu: 1 474 964,34 zł (wydatki kwalifikowalne: 987 253,60 zł), w tym:-dofinansowanie z EFRR: 839 165,55 zł-środki własne (15%) 148 088,05 zł- koszty niekwalifikowane 487 710,74 zł Wskaźnik produktu planowany do osiągnięcia w 2020 roku:• Długość wybudowanej kanalizacji sanitarnej: 3,164 km (Polish)
0 references
The project will be carried out in Szczytniki commune, Kalisz County, Wielkopolska Voivodeship in the area of Szczytniki Agglomeration. This agglomeration was designated by Resolution of the Sejm of the Wielkopolska Voivodship No XXIII/633/16 of the Wielkopolska Regional Assembly of 31 October 2016. The recipients of the project are residents and entrepreneurs from the area of agglomeration with an equivalent number of inhabitants equal to 3 608 RLM. The subject of the project is the construction of a sanitary sewerage network with connections for the drainage of household and economic sewage from the town of Korzekwin and fragmentary from Popów to the existing sewage network in Popów. The specific purpose of the sub-measure is to increase the percentage of the population using the sewage treatment system.As part of the task (the whole project) will be carried out:-Great collectors PVC?200 mm – 2483,1 m-PVC sewer connections?160 mm – 41 pcs/526.5 m-PVC?110 mm – 1639,7 m-Concrete repairs TB?1000-22 pcs-Expanded?1200-3 pieces. —Water pumping plants – 4 units-YAKXS power cables (internal supply lines) – 34.0 mDirect customers will be residents who will be connected to the sewage network from the town: Korzekwin and Pops. Value of the project: PLN 1 474 964,34 (eligible expenditure: PLN 987 253.60), including:-funding from the ERDF: 839 165,55 PLN-own resources (15 %) 148 088,05 zł- ineligible costs 487 710,74 zł Product indicator planned to be achieved in 2020:• Length of built sanitary sewage system: 3.164 km (English)
21 October 2020
0 references
Le projet sera mis en œuvre dans la municipalité de Szczytniki, dans le comté de Kalisz, dans la voïvodie de Wielkopolskie, dans la zone de l’agglomération Szczytniki. Cette agglomération a été désignée par la résolution no XXIII/633/16 de l’Assemblée régionale de Wielkopolska du 31 octobre 2016. Les bénéficiaires du projet sont les résidents et les entrepreneurs de l’agglomération ayant une population équivalente de 3 608 EH. L’objet du projet est la construction d’un réseau d’assainissement sanitaire avec raccordements pour le rejet des eaux usées domestiques et économiques de Korzekwin et fragmentés de Popów au réseau d’égouts existant à Popów. L’objectif spécifique de la sous-mesure est d’augmenter le pourcentage de la population qui utilise le système de traitement des eaux usées. Dans le cadre de la tâche (l’ensemble du projet) sera exécutée: — Convertisseurs de gravitation PVC?200 mm — 2 483,1 m-Raccord d’égouts en PVC?160 mm — 41 pcs/526,5 m-Soduc de presse PE?110 mm — 1 639,7 m-Études de révision du béton TB?1000-22 pcs-Tutudes expansées?1200-3 pcs-Révision?400-50pcs. —Stations de pompage de l’eau — 4 câbles d’alimentation pcs-YAKXS (lignes électriques internes) — 34,0 mD clients directs seront des résidents qui seront connectés au réseau d’assainissement à partir de la localité: Korzekwin et Pops. Valeur du projet: 1 474 964,34 PLN (dépenses éligibles: 987 253,60 PLN), dont — cofinancement du FEDER: 839 165,55 PLN ressources propres (15 %) PLN 148 088,05 — coûts inéligibles 487 710,74 PLN Indicateur de produit devant être atteint en 2020:• Longueur du système d’assainissement sanitaire construit: 3,164 km (French)
2 December 2021
0 references
Identifiers
RPWP.04.03.02-30-0001/17
0 references