Investments in RES in the company Grzegorz Winiarek Zajazd “TUSINEK” (Q131923)

From EU Knowledge Graph
Revision as of 19:27, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La présente demande prévoit la construction de deux installations à Rozogi: 1. Installation 32,4 kW — ul. Rozogi — Cologne 2, 12-114 Rozogi (plot: 523/14) Installation au sol. L’installation conçue se compose de 120 panneaux photovoltaïques polycristallins d’une puissance de 270 W, équipés d’optimiseurs de puissance et d’onduleur. 2. Installation 11,88 kW — ul. Rozogi — Cologne 2, 12-114 Rozogi (plot: 523/14) Installation au sol. L’installation...)
Jump to navigation Jump to search
Project Q131923 in Poland
Language Label Description Also known as
English
Investments in RES in the company Grzegorz Winiarek Zajazd “TUSINEK”
Project Q131923 in Poland

    Statements

    0 references
    205,039.96 zloty
    0 references
    49,209.59 Euro
    13 January 2020
    0 references
    241,223.48 zloty
    0 references
    57,893.64 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    11 February 2017
    0 references
    31 March 2020
    0 references
    GRZEGORZ WINIAREK ZAJAZD "TUSINEK"
    0 references
    0 references

    53°28'56.6"N, 21°21'34.9"E
    0 references
    W ramach przedmiotowej aplikacji przewidywana jest budowa w miejscowości Rozogi 2 instalacji: 1. Instalacja 32,4 kW – ul. Rozogi - Kolonia 2, 12-114 Rozogi (działka: 523/14) Instalacja na gruncie. Projektowana instalacja składa się z 120 szt. polikrystalicznych paneli fotowoltaicznych o mocy 270 W, wyposażonych w optymalizatory mocy oraz inwerter. 2. Instalacja 11,88 kW – ul. Rozogi - Kolonia 2, 12-114 Rozogi (działka: 523/14) Instalacja na gruncie. Projektowana instalacja składa się z 44 szt. polikrystalicznych paneli fotowoltaicznych o mocy 270 W, wyposażonych w optymalizatory mocy oraz inwerter. Zadaniem projektowanej instalacji fotowoltaicznej jest wytworzenie energii elektrycznej o parametrach sieci elektroenergetycznej, a następnie zagospodarowanie jej w wewnętrznej instalacji elektrycznej przez odbiorcę. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania projektu: - wybór wykonawcy zgodnie z zasadą konkurencyjności - podpisanie umowy z wykonawcą - montaż inwestycji - zakończenie projektu, podpisanie protokołu końcowego, płatność końcowa Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
    0 references
    As part of this application, the construction of an installation in Rozogi 2 is planned: 1. Installation 32.4 kW – ul. Rozogi – Cologne 2, 12-114 Rozogi (Monday: 523/14) Installation on the ground. The designed installation consists of 120 units of polycrystalline photovoltaic panels with a power output of 270 W, equipped with power optimisations and inverters. 2. Installation 11.88 kW – ul. Rozogi – Cologne 2, 12-114 Rozogi (Monday: 523/14) Installation on the ground. The designed installation consists of 44 units of polycrystalline photovoltaic panels with a power output of 270 W, equipped with power optimisations and inverters. The task of the designed photovoltaic installation is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. Stages of project implementation: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation of the project: — selection of the contractor in accordance with the principle of competitiveness – signing of the contract with the contractor – assembly of the investment – completion of the project, signing of the final protocol, final payment The project is in line with the assumptions entered in the Polish Shoop by pursuing the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English)
    21 October 2020
    0 references
    La présente demande prévoit la construction de deux installations à Rozogi: 1. Installation 32,4 kW — ul. Rozogi — Cologne 2, 12-114 Rozogi (plot: 523/14) Installation au sol. L’installation conçue se compose de 120 panneaux photovoltaïques polycristallins d’une puissance de 270 W, équipés d’optimiseurs de puissance et d’onduleur. 2. Installation 11,88 kW — ul. Rozogi — Cologne 2, 12-114 Rozogi (plot: 523/14) Installation au sol. L’installation prévue se compose de 44 panneaux photovoltaïques polycristallins d’une puissance de 270 W, équipés d’optimiseurs de puissance et d’onduleur. L’objectif de l’installation photovoltaïque prévue est de produire de l’électricité avec les paramètres du réseau électrique, puis de la gérer dans l’installation électrique interne par le client. Étapes de la mise en œuvre du projet: — présentation d’une demande de financement — signature de la convention de subvention — sélection du contractant conformément au principe de compétitivité — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final du projet: — sélection du contractant selon le principe de compétitivité — signature d’un contrat avec le contractant — montage de l’investissement — achèvement du projet, signature du protocole final, paiement final Le projet est conforme aux hypothèses figurant dans le SzOOP RPOW aux fins de: Augmentation de la part des SER dans le bilan énergétique global de la région. La mise en œuvre de la sous-mesure augmentera la part des énergies renouvelables dans le bilan de l’entreprise, ce qui augmentera la part des énergies renouvelables dans le bilan énergétique. La région. Cela permettra de réduire les émissions de gaz et de poussières nocifs dans l’atmosphère et d’accroître la compétitivité de l’utilisation des sources d’énergie renouvelables locales. À la suite de l’investissement, les coûts associés à la consommation d’énergie diminueront (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0308/17
    0 references