Installation of RES for the needs of the hotel-gastronomical facility Folwark Żuławski company PRZEMYSŁAW PASTEWSKI (Q131810)

From EU Knowledge Graph
Revision as of 19:24, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet prévoit de construire deux instances SER, à savoir une installation photovoltaïque sur réseau de 39,75 kWp utilisant l’énergie solaire et des installations utilisant des pompes à chaleur verticales utilisant l’énergie géothermique de 72 kW. Les installations prévues seront utilisées pour la production d’énergie éclectique et thermique, qui seront utilisées pour répondre aux besoins de l’activité de restauration et d’hôtellerie PRZEMYSŁ...)
Jump to navigation Jump to search
Project Q131810 in Poland
Language Label Description Also known as
English
Installation of RES for the needs of the hotel-gastronomical facility Folwark Żuławski company PRZEMYSŁAW PASTEWSKI
Project Q131810 in Poland

    Statements

    0 references
    437,838.76 zloty
    0 references
    105,081.30 Euro
    13 January 2020
    0 references
    515,104.42 zloty
    0 references
    123,625.06 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 April 2017
    0 references
    31 December 2019
    0 references
    PRZEMYSŁAW PASTEWSKI
    0 references
    0 references

    54°9'30.2"N, 19°18'31.7"E
    0 references
    W ramach przedsięwzięcia planuje się budowę dwóch instancji OZE tj instalacji fotowoltaicznej on-grid o mocy 39,75kWp wykorzystującą energię ze słońca oraz instalacji z zastosowaniem pionowych pomp ciepła wykorzystującą energię geotermalną o mocy 72kW. Projektowane instalacje będą służyły do produkcji energii eklektycznej i cieplnej , która będzie wykorzystywana na potrzeby prowadzonej przez Wnioskodawcę PRZEMYSŁAW PASTEWSKI działalności gastronomiczno-hotelowej w obiekcie Folwark Żuławski. Zakres inwestycji będzie obejmował: 1. Zakup i montaż instalacji fotowoltaicznej o mocy 39,75kW w której skład będzie wchodziło 150 szt. modułów PV, inwerter sieciowy oraz zabezpieczenie AC/DC. Sprawność układu szacuje się na ok. 85 %. System pozwoli na pozyskanie rocznie ok. 42,57 MWh czystej energii elektrycznej, 2. Zakup i montaż dwóch pomp ciepła o łącznej mocy 72k w raz z zasobnikami, prace ziemne związane z wykopami 18 otworów, w których zostaną umieszczone sondy głębinowe. System pozwoli na pozyskanie rocznie ok. 180,66 MWht czystej energii cieplnej. Cała inwestycja będzie zlokalizowana na działce nr 82/5 ob. 0029, w miejscowości Władysławowo 4a gm. Elbląg. Realizacja inwestycji przyniesie pozytywne efekty środowiskowe, w tym w zakresie redukcji emisji CO2, która szacowana jest na poziomie 126,80/rok. Projekt wpisuje się w zał. 4 osi priorytet. RPO WiM dział. 4.1, jest zgodny z celem szczegółowym "zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu". Wnioskodawca posiada odpowiedni potencjał finansowy i instytucjonalny, w tym zasoby kadrowe i organizacyjne, do realizacji projektu. Analiza formalno-prawna potwierdziła pełną formalno-prawną wykonalność inwestycji. Przedsięwzięcie będzie finansowane ze środków własnych przedsiębiorstwa (15%) oraz dotacji ze środków unijnych (85%). Z uwagi na znaczące nakłady inwestycyjne,w przypadku nie uzyskania dotacji, przedsięwzięcie nie zostanie zrealizowane. (Polish)
    0 references
    The project plans to build two RES instances, i.e. on-grid photovoltaic installation with a power of 39.75kWp using solar energy and installations using vertical heat pumps using geothermal energy of 72 kW. The planned installations will be used for the production of eclectic and thermal energy, which will be used for the purposes of catering and hotel activities carried out by the Applicant PASTEWSKI in the Folwark Żuławski building. The scope of the investment will include: 1. Purchase and installation of a 39.75 kW photovoltaic installation consisting of 150 PV modules, a network inverter and AC/DC security. The efficiency of the system is estimated to be approx. IT’S 85 %. The system will allow to obtain approx. 42.57 MWh of clean electricity, 2. Purchase and assembly of two heat pumps with a total capacity of 72k at once with storage tanks, earthworks related to excavations of 18 holes in which deep-sea probes will be placed. The system will allow to obtain approx. 180,66 MWht of clean thermal energy. The entire investment will be located on plot no. 82/5. 0029, in the village of Władysławowo 4a gm. Elbląg. The implementation of the investment will have positive environmental effects, including in terms of CO2 reductions, which is estimated at 126.80/year. The project fits in. 4 axes priority. RPO WiM department. 4.1 is in line with the specific objective “increased share of renewable energy sources in the overall energy balance of the region”. The applicant shall have adequate financial and institutional capacity, including staff and organisational resources, to carry out the project. The formal and legal analysis confirmed the full formal and legal feasibility of the investment. The project will be financed from the company’s own resources (15 %) and grants from EU funds (85 %). Due to significant investment outlays, in the absence of a grant, the project will not be carried out. (English)
    21 October 2020
    0 references
    Le projet prévoit de construire deux instances SER, à savoir une installation photovoltaïque sur réseau de 39,75 kWp utilisant l’énergie solaire et des installations utilisant des pompes à chaleur verticales utilisant l’énergie géothermique de 72 kW. Les installations prévues seront utilisées pour la production d’énergie éclectique et thermique, qui seront utilisées pour répondre aux besoins de l’activité de restauration et d’hôtellerie PRZEMYSŁAW Pastewski de la requérante dans l’installation de Folwark ▲uławski. La portée de l’investissement comprendra: 1. Achat et installation d’une installation photovoltaïque de 39,75 kW composée de 150 modules PV, onduleur réseau et protection AC/DC. L’efficacité du système est estimée à environ. 85 %. Le système permettra d’obtenir environ. 42,57 MWh d’électricité pure, 2. Achat et installation de deux pompes à chaleur d’une puissance totale de 72k dans le temps avec des réservoirs de stockage, travaux de terre liés à l’excavation de 18 trous dans lesquels des sondes en eau profonde seront placées. Le système permettra d’obtenir environ. 180,66 MWht d’énergie thermique pure. L’ensemble de l’investissement sera situé sur la parcelle no 82/5 ob. 0029, dans le village de Władysławowo 4a Elbląg. La mise en œuvre de l’investissement aura des effets positifs sur l’environnement, notamment en termes de réduction des émissions de CO2, qui est estimée à 126,80 par an. Le projet s’inscrit dans l’annexe. 4 axes prioritaires. Service ROP WiM. 4.1 est conforme à l’objectif spécifique consistant à «accroître la part des sources d’énergie renouvelables dans le bilan énergétique global de la région». Le demandeur dispose des capacités financières et institutionnelles adéquates, y compris des ressources humaines et organisationnelles, pour mettre en œuvre le projet. L’analyse formelle et juridique a confirmé la faisabilité formelle et juridique de l’investissement. Le projet sera financé sur les ressources propres de l’entreprise (15 %) et sur les subventions de l’UE (85 %). En l’absence de subvention, le projet ne sera pas mis en œuvre en raison de coûts d’investissement importants. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0171/17
    0 references