Green Energy at the Service Business Balbinka Robert Gzik in Good City (Q131935)

From EU Knowledge Graph
Revision as of 19:24, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet consistera en la construction de deux installations photovoltaïques d’une capacité totale de 34,45 kWc dans la Good Town à ul. Łużycka 32A et ul. Łużycka 55A pour la production d’électricité au moyen d’installations photovoltaïques. Chaque système photovoltaïque sera composé de panneaux solaires, d’onduleur et de structure de montage. Le projet sera achevé dans un délai d’un an à compter de la date de signature de la convention de subv...)
Jump to navigation Jump to search
Project Q131935 in Poland
Language Label Description Also known as
English
Green Energy at the Service Business Balbinka Robert Gzik in Good City
Project Q131935 in Poland

    Statements

    0 references
    136,163.62 zloty
    0 references
    32,679.27 Euro
    13 January 2020
    0 references
    160,192.5 zloty
    0 references
    38,446.2 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 March 2018
    0 references
    30 September 2018
    0 references
    FIRMA HANDLOWO USŁUGOWA BALBINKA ROBERT GZIK
    0 references
    0 references

    53°59'12.8"N, 20°23'50.3"E
    0 references
    Projekt polegać będzie na budowie dwóch instalacji PV o łącznej mocy 34,45 kWp w Dobrym Mieście przy ul. Łużyckiej 32A oraz ul. Łużyckiej 55A do produkcji energii elektrycznej poprzez instalacje fotowoltaiczne. Każdy system fotowoltaiczny będzie składać się z paneli słonecznych, inwertera oraz konstrukcji mocującej. Projekt zostanie ukończony w ciągu 1 roku od dnia podpisania umowy o dofinansowanie. Przy wyborze oferentów Wnioskodawca będzie stosował kryteria odnoszące się do kwestii społecznych (dozwolone przez prawo zamówień publicznych). Projekt będzie się składał z następujących etapów: - zaprojektowanie instalacji, - wykonania konstrukcji wspierających - montażu paneli oraz urządzeń wspierających - wykonanie instalacji elektrycznej oraz uruchomienie instalacji (Polish)
    0 references
    The project will consist of the construction of two PV installations with a total power of 34.45 kWp in Dobry Miasto at ul. Lużycka 32A and ul. Lużycka 55A for the production of electricity through photovoltaic installations. Each photovoltaic system will consist of solar panels, inverter and mounting structure. The project will be completed within 1 from the date of signing the grant agreement. When selecting tenderers, the applicant will apply the criteria relating to social issues (authorised by public procurement law). The project will consist of the following stages: — design of the installation, – execution of supporting structures – installation of panels and supporting devices – construction of electrical installation and installation (English)
    21 October 2020
    0 references
    Le projet consistera en la construction de deux installations photovoltaïques d’une capacité totale de 34,45 kWc dans la Good Town à ul. Łużycka 32A et ul. Łużycka 55A pour la production d’électricité au moyen d’installations photovoltaïques. Chaque système photovoltaïque sera composé de panneaux solaires, d’onduleur et de structure de montage. Le projet sera achevé dans un délai d’un an à compter de la date de signature de la convention de subvention. Lors de la sélection des soumissionnaires, la requérante appliquera des critères sociaux (autorisés par le droit des marchés publics). Le projet comprendra les phases suivantes: — conception de l’installation, — construction de structures de soutènement — installation de panneaux et de dispositifs de support — exécution de l’installation électrique et mise en service de l’installation (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0324/16
    0 references