Project Q3848023 in Bulgaria
Language Label Description Also known as
English
“Increasing energy efficiency in VICTORIA-05” OOD
Project Q3848023 in Bulgaria

    Statements

    0 references
    331,372.5 Bulgarian lev
    0 references
    168,999.98 Euro
    1 December 2021
    0 references
    549,780.0 Bulgarian lev
    0 references
    280,387.8 Euro
    1 December 2021
    0 references
    0.6 percent
    0 references
    18 August 2017
    0 references
    8 November 2018
    0 references
    0 references

    43°7'20.21"N, 25°41'19.64"E
    0 references
    Проектът е насочен към повишаване степента на конкурентоспособност на средно предприятие от производствения сектор чрез изпълнение на мерки за енергийна ефективност (ЕЕ). Независимо от доброто пазарно позициониране и сравнителните предимства, слабо звено в производствената дейност на фирмата се явява високата енергоемкост на поизводството, което увеличава дела на енергийната компонента в себестойността на произведената продукция и я прави неконкурентна на пазара. Използването на изключително неефективно отопление, както и отсъствието на санирана производствена сграда, възпрепятстват дейността на предприятието, води до прекъсване на технологичния процес, дискомфортна работна среда, получават се производствени и финансови загуби – брак, текучество, неизпълнение на договорните отношения с възложителите. Решаването на тези проблеми, определят необходимостта от изпълнение на заложените инвестиционни мерки в обследването за ЕЕ. Предвидените дейности по Елемент А „Инвестиции” са: 1. Придобиване на отоплителна лъчисто газово – керамична система, 1 бр. за оптимизиране енергопотреблението на 4 производствени халета; 2. Дейност по СМР за подобряване на функционалните характеристики на производствено хале 1 чрез санирането му; 3. Придобиване на производствено оборудване чрез закупуване на роботизирана заваръчна система, 1 бр.; 4. Придобиване на производствено оборудване чрез закупуване на дробометна машина, 1 бр. По Елемент Б – „Услуги”, проектът предвижда дейности по: въвеждане и сертифициране на Система за енергиен мениджмънт, съгласно изискванията на стандарт БДС EN ISO 50001, с което ще създаде рамка за управление и непрекъснато подобряване на енергийните характеристики, контрол и намаление на енергийното потребление; публичност и визуализация. Очакваните конкретни резултати след изпълнение на проекта са: реализирани енергийни спестявания - 296 204 kWh/год., спестени вредни емисии СО2, причина за "парниковия" ефект за атмосферата – 328,5 т/год. (Bulgarian)
    0 references
    The project aims at increasing the competitiveness of a medium-sized enterprise in the manufacturing sector through the implementation of energy efficiency measures (EE). Despite the good market positioning and comparative advantages, a weak link in the production activity of the company is the high energy intensity of the production, which increases the share of the energy component in the cost price of the produced production and makes it uncompetitive on the market. The use of extremely inefficient heating, as well as the absence of a renovated production building, hinders the operation of the enterprise, leads to disruption of the technological process, uncomfortable working environment, production and financial losses — marriage, turnover, non-performance of contractual relations with the contracting authorities. Solving these problems determine the need to implement the investment measures set out in the EE audit. The envisaged activities under Element A “Investment” are: 1. Acquisition of heating radiant gas — ceramic system, 1 pcs. to optimise the energy consumption of 4 production halls; 2. Works to improve the functional characteristics of production hall 1 through its renovation; 3. Acquisition of production equipment by purchasing a robotic welding system, 1 pcs.; 4. Acquisition of production equipment through the purchase of a shot blasting machine, 1 pcs. Under Element B — “Services”, the project provides for activities under: introduction and certification of the Energy Management System according to the requirements of standard BDS EN ISO 50001, which will create a framework for management and continuous improvement of energy performance, control and reduction of energy consumption; publicity and visualisation. The expected concrete results after project implementation are: realised energy savings — 296 204 kWh/year, CO2 emissions saved, cause of the “greenhouse” effect on the atmosphere — 328.5 t/year. (English)
    2 December 2021
    0 references
    Горна Оряховица
    0 references

    Identifiers

    BG16RFOP002-3.001-0346