“Rehabilitation and reconstruction of Bratya Miladinovi-North Street”, ETAP 1: from Sofroniy Vrachabski Str. (km 1+ 930) to Konstantin Fotinov Str. (km 2+ 931.86) (Q3886636)

From EU Knowledge Graph
Revision as of 22:37, 2 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding en translations)
Jump to navigation Jump to search
Project Q3886636 in Bulgaria
Language Label Description Also known as
English
“Rehabilitation and reconstruction of Bratya Miladinovi-North Street”, ETAP 1: from Sofroniy Vrachabski Str. (km 1+ 930) to Konstantin Fotinov Str. (km 2+ 931.86)
Project Q3886636 in Bulgaria

    Statements

    0 references
    830,153.72 Bulgarian lev
    0 references
    423,378.4 Euro
    1 December 2021
    0 references
    976,651.44 Bulgarian lev
    0 references
    498,092.23 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    11 November 2021
    0 references
    15 September 2023
    0 references
    0 references
    Проектното предложение се отнася за рехабилитация и реконструкция на ул. „Братя Миладинови-Север. Улицата се намира в гр. Първомай. Участъка, предвиден за реконструкция е от от ул. Софроний Врачабски(км 1+930) до ул. Константин Фотинов(км 2+ 931.86). Приблизителната й дължина е 1000 м. с променлив габарит приблизително от 6,50 м. до 8 м. Не по цялата дължина на улицата има изградени тротоари и положени бордюри. Предвижда се рехабилитация на пътната настилка на улицата, също така и реконструкция на съществуващите тротоари и ситуиране на нови, съответстващи на класа на улицата, прилежащата застройка и регулационния план. Предвижда се и подмяна на съществуващи бордюри и полагане на нови на местата, където такива няма. (Bulgarian)
    0 references
    The project proposal concerns rehabilitation and reconstruction of Bratya Miladinovi-North Street. The street is located in Parvomay. The section intended for reconstruction is from Sofroniy Vrachabski Str. (km 1+ 930) to Konstantin Fotinov Str. (km 2+ 931.86). Its approximate length is 1 000 m. with a variable gauge of approximately 6.50 m to 8 m. Not along the entire length of the street there are pavements and laid curbs. Rehabilitation of the road surface on the street is also envisaged, as well as reconstruction of existing sidewalks and the situation of new ones corresponding to the street class, the adjoining building and the zoning plan. It is also envisaged to replace existing curbs and lay new ones in places where they do not exist. (English)
    2 December 2021
    0 references
    Първомай
    0 references

    Identifiers

    BG06RDNP001-7.001-0116
    0 references