Increasing energy efficiency in the company Arkadiusz Rataj (Q132165)

From EU Knowledge Graph
Revision as of 06:43, 9 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q132165 in Poland
Language Label Description Also known as
English
Increasing energy efficiency in the company Arkadiusz Rataj
Project Q132165 in Poland

    Statements

    0 references
    832,540.63 zloty
    0 references
    199,809.75 Euro
    13 January 2020
    0 references
    1,197,900.19 zloty
    0 references
    287,496.05 Euro
    13 January 2020
    0 references
    69.5 percent
    0 references
    9 May 2019
    0 references
    31 December 2019
    0 references
    ARKADIUSZ RATAJ
    0 references
    0 references

    54°6'56.2"N, 20°7'49.1"E
    0 references
    Termomodernizacja budynku wraz z zamontowaniem pieca na biomasę do produkcji energii cieplnej. Usprawnienie stanu technicznego budynku przy ul. Braniewskiej 10D w Ornecie zakłada ulepszenia w następującym zakresie: Montaż źródła ciepła c.o. - kotła na paliwo stałe przystosowanego do spalania biomasy (pellet drzewny) z podajnikiem automatycznym. Pełna automatyka obiegów grzewczych, automatyka pogodowa. Budowa zasobnika paliwa. Wymiana instalacji c.o. - montaż nowego orurowania, montaż grzejników stalowych z zaworami termostatycznymi. Montaż zaworów podpionowych lub regulatorów strefowych. Montaż licznika ciepła. Regulacja hydrauliczna instalacji, Wymiana instalacji c.w.u., Montaż zasobnika c.w.u, przyłączenie instalacji do nowego źródła ciepła, Docieplenie ścian zewnętrznych nadziemnych oraz ścian w gruncie od wewnątrz, Docieplenie dachu budynku. Wymiana wszystkich okien w budynku na stolarkę energooszczędną, Wymiana drzwi starego typu na stolarkę energooszczędną. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP RPO WiM 2014-2020. W ramach projektu zostanie poddany głębokiej termomodernizacji obiekt o powierzchni 1312,32 m2 i 7705,1 m3 kubatury. Poprzez realizacji inwestycji nastąpi likwidacja przestarzałego i nieekologicznego źródła ciepła w postaci pieca węglowego, który zostanie zastąpiony nowoczesnym urządzeniem zasilanym biomasą o mocy 127 kW . Realizacji projektu przewiduje znaczny spadek zapotrzebowania na energię cieplną w obiekcie przekraczający ponad 80%. Budynek jest obiektem znajdującym się na obszarze objętym nadzorem konserwatora zabytków, który wyraził zgodę na przeprowadzenie inwestycji objętej wnioskiem o dofinansowanie. Czynności związane z realizacją, tj, przygotowanie projektu budowlanego, wystąpienie o pozwolenie na budowę zostały podjęte w 2016 roku. Audyt został opracowany w 2016 roku i został zaktualizowany w lipcu 2018 roku. (Polish)
    0 references
    Thermal modernisation of the building with the installation of a biomass kiln for the production of heat. Improvement of the technical condition of the building at ul. Braniewska 10D in Ornet assumes improvements in the following range: Installation of hot water source – solid fuel boiler designed for the combustion of biomass (wood pellet) with automatic feeder. Full automation of heating circuits, weather automation. Construction of a fuel tank. Replacement of central heating system – installation of new piping, installation of steel radiators with thermostatic valves. Installation of upholstery valves or zone regulators. Installation of the heat meter. Hydraulic adjustment of the installation, Replacement of the central heating system, installation of the hot water tank, connection of the installation to a new heat source, warming of external walls and walls in the ground from the inside, Warming of the roof of the building. Replacement of all windows in the building for energy-saving carpentry, Replacement of old type doors for energy-saving carpentry. The project meets all the shore conditions specified in the SHOOP RPO WiM 2014-2020. The project will undergo a deep thermal modernisation of 1312.32 m² and 7705.1 m³ cubature. Through the implementation of the investment, an outdated and non-organic heat source in the form of a coal kiln will be liquidated, which will be replaced by a modern biomass device powered by 127 kW. The implementation of the project foresees a significant decrease in the demand for thermal energy in the facility exceeding 80 %. The building is a facility located in the area under the supervision of the monument conservator, which has agreed to carry out the investment covered by the application for funding. The work related to the implementation, i.e. the preparation of the construction project, the application for a construction permit was undertaken in 2016. The audit was developed in 2016 and was updated in July 2018. (English)
    21 October 2020
    0 references
    Thermomodernisation du bâtiment avec l’installation d’un four à biomasse pour la production d’énergie thermique. Amélioration de l’état technique du bâtiment à ul. Braniewska 10D à Ornet suppose des améliorations dans les domaines suivants: Installation d’une source de chauffage — chaudière à combustible solide adaptée à la combustion de la biomasse (grappes de bois) avec alimentation automatique. Circuits de chauffage entièrement automatiques, automatisation météorologique. Construction d’un réservoir de carburant. Remplacement des installations de chauffage central — installation de nouvelles canalisations, installation de radiateurs en acier avec vannes thermostatiques. Installation de vannes verticales ou de régulateurs de zone. Installation d’un compteur de chaleur. Régulation hydraulique de l’installation, Remplacement des installations d’eau chaude, installation du réservoir de stockage, raccordement de l’installation à une nouvelle source de chaleur, Réchauffement des murs extérieurs et des murs hors sol du sol de l’intérieur, Réchauffement du toit du bâtiment. Remplacement de toutes les fenêtres du bâtiment par des menuiseries économes en énergie, remplacement des portes anciennes par des menuiseries économes en énergie. Le projet répond à toutes les conditions limites fixées dans le SzOOP ROP WiM 2014-2020. Le projet fera l’objet d’une thermomodernisation profonde de 1 312,32 m² et de 7 705,1 m³ de volume. L’investissement permettra d’éliminer une source de chaleur désuète et non organique sous la forme d’un four à charbon, qui sera remplacé par un dispositif moderne alimenté par la biomasse d’une puissance de 127 kW. La mise en œuvre du projet prévoit une diminution significative de la demande de chaleur dans l’installation, dépassant 80 %. Le bâtiment est un bâtiment situé dans la zone sous la supervision du conservateur du monument qui a accepté de réaliser l’investissement faisant l’objet de la demande de financement. Les activités de mise en œuvre, c’est-à-dire la préparation du projet de construction, la demande de permis de construire ont été entreprises en 2016. L’audit a été élaboré en 2016 et mis à jour en juillet 2018. (French)
    2 December 2021
    0 references
    Thermomodernisierung des Gebäudes mit der Installation eines Biomasseofens zur Erzeugung von thermischer Energie. Verbesserung des technischen Zustands des Gebäudes bei ul. Braniewska 10D in Ornet setzt Verbesserungen in den folgenden Bereichen voraus: Installation der Heizquelle – Festbrennstoffkessel für die Verbrennung von Biomasse (Holzpellets) mit automatischer Zufuhr. Vollautomatische Heizkreise, Wetterautomatisierung. Bau eines Kraftstofftanks. Austausch von Zentralheizungsanlagen – Installation neuer Rohrleitungen, Installation von Stahlheizkörpern mit thermostatischen Ventilen. Einbau von vertikalen Ventilen oder Zonenreglern. Installation eines Wärmezählers. Hydraulische Regelung der Installation, Ersatz von Warmwasseranlagen, Installation des Speicherbehälters, Anschluss der Anlage an eine neue Wärmequelle, Erwärmung der oberirdischen Außenwände und Wände im Boden von innen, Erwärmung des Daches des Gebäudes. Alle Fenster im Gebäude durch energiesparende Tischlerei ersetzen, alte Türen durch energiesparende Tischlerei ersetzen. Das Projekt erfüllt alle im SzOOP ROP WiM 2014-2020 festgelegten Randbedingungen. Das Projekt wird einer tiefen Thermomodernisierung von 1 312,32 m² und 7 705,1 m³ Volumen unterzogen. Die Investition wird zur Beseitigung einer veralteten und nichtökologischen Wärmequelle in Form eines Kohleofens führen, der durch ein modernes Biomassekraftwerk mit einer Leistung von 127 kW ersetzt wird. Die Durchführung des Projekts sieht einen deutlichen Rückgang des Wärmebedarfs in der Anlage über 80 % vor. Das Gebäude ist ein Gebäude, das sich unter der Aufsicht des Denkmalkonservators befindet und sich bereit erklärt hat, die Investition im Rahmen des Förderantrags durchzuführen. Die Durchführungsmaßnahmen, d. h. die Vorbereitung des Bauvorhabens, die Beantragung einer Baugenehmigung wurden 2016 durchgeführt. Das Audit wurde 2016 entwickelt und im Juli 2018 aktualisiert. (German)
    9 December 2021
    0 references

    Identifiers

    RPWM.04.02.00-28-0031/18
    0 references