Investments in RES in the guesthouse in Gronówk (Q132021)

From EU Knowledge Graph
Revision as of 09:22, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la construction d’une centrale microélectrique photovoltaïque de 16,25 kWp composée de 50 modules monocristallins d’une puissance de 325 W, située sur le toit du garage aux fins de la maison d’hôtes, et l’installation d’un poêle à biomasse d’une capacité de 75 kW avec les accessoires nécessaires: Gronówko, municipalité de Braniewo, voïvodie de Warmińsko-Mazurskie. Gronówko 18, numéro de la parcelle: 237/12, numéro du cadast...)
Jump to navigation Jump to search
Project Q132021 in Poland
Language Label Description Also known as
English
Investments in RES in the guesthouse in Gronówk
Project Q132021 in Poland

    Statements

    0 references
    138,967.79 zloty
    0 references
    33,352.27 Euro
    13 January 2020
    0 references
    163,530.0 zloty
    0 references
    39,247.2 Euro
    13 January 2020
    0 references
    84.98 percent
    0 references
    16 September 2019
    0 references
    29 November 2019
    0 references
    SEBASTIAN BARANKIEWICZ
    0 references
    0 references
    Przedmiotem projektu jest budowa mikroelektrowni fotowoltaicznej o mocy 16,25 kWp składającej się z 50 modułów monokrystalicznych o mocy 325W, zlokalizowanej na dachu budynku garażowego na potrzeby pensjonatu oraz instalacja pieca na biomasę -na pelet o mocy 75kW wraz z niezbędnym osprzętem: miejscowości Gronówko, gmina Braniewo województwo warmińsko-mazurskie. Gronówko 18, nr działki: 237/12, nr księgi wieczystej: EL1B/00035585/6 Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: - podpisanie umowy - realizacja prac - odbiór końcowy i podpisanie protokołu końcowego Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic microelectric plant with a power of 16.25 kWp, consisting of 50 monocrystalline modules of 325 W, located on the roof of a garage building for the purpose of the guest house and installation of a biomass kiln – for 75 kW pellets with the necessary equipment: Gronówko, municipality of Braniewo Warmińsko-Mazurskie Voivodeship. Gronówko 18, plot number: 237/12, perpetual book number: EL1B/00035585/6 Phases of implementation of the project: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the planned schedule – completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: — signing of the contract – implementation of works – final acceptance and signing of the final protocol The project fits into the assumptions entered in the Polish Szoop with the aim of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. The cost of energy consumption will fall as a result of the investment. (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’une centrale microélectrique photovoltaïque de 16,25 kWp composée de 50 modules monocristallins d’une puissance de 325 W, située sur le toit du garage aux fins de la maison d’hôtes, et l’installation d’un poêle à biomasse d’une capacité de 75 kW avec les accessoires nécessaires: Gronówko, municipalité de Braniewo, voïvodie de Warmińsko-Mazurskie. Gronówko 18, numéro de la parcelle: 237/12, numéro du cadastre: EL1B/00035585/6 Étapes du projet: — présentation d’une demande de financement — signature de la convention de subvention — sélection du contractant selon le principe de compétitivité — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final de la méthode de mise en œuvre du projet: — signature du contrat — exécution des travaux — réception finale et signature du protocole final Le projet est conforme aux hypothèses figurant dans le bureau de développement régional polonais afin d’atteindre l’objectif de: Augmentation de la part des SER dans le bilan énergétique global de la région. La mise en œuvre de la sous-mesure augmentera la part des énergies renouvelables dans le bilan de l’entreprise, ce qui augmentera la part des énergies renouvelables dans le bilan énergétique. La région. Cela permettra de réduire les émissions de gaz et de poussières nocifs dans l’atmosphère et d’accroître la compétitivité de l’utilisation des sources d’énergie renouvelables locales. À la suite de l’investissement, les coûts associés à la consommation d’énergie diminueront. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.04.01.00-28-0431/17
    0 references