Construction of micro photovoltaic installations up to 40KWp on sewage treatment plant at ul. Rataja 4 in Reszl and water treatment station at ul. Gdańska 3 in Reszlu. (Q132061)
Jump to navigation
Jump to search
Project Q132061 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of micro photovoltaic installations up to 40KWp on sewage treatment plant at ul. Rataja 4 in Reszl and water treatment station at ul. Gdańska 3 in Reszlu. |
Project Q132061 in Poland |
Statements
237,561.81 zloty
0 references
344,142.85 zloty
0 references
69.03 percent
0 references
22 February 2016
0 references
30 September 2018
0 references
WIELOBRANŻOWE PRZEDSIĘBIORSTWO KOMUNALNE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
0 references
Planowana inwestycja polegać będzie na zakupie i montażu 2 instalacji fotowoltaicznej o mocy 39,6 kW każda na ujęciu wody przy ul. Gdańskiej w Reszlu przez Wielobranżowe Przedsiębiorstwo Komunalne Sp. z o.o. w Reszlu z wykorzystaniem 132 paneli fotowoltaicznych (każda instalacja) o mocy 300 W każdy panel. Do realizacji przedmiotowej inwestycji nie są wymagane pozwolenie na budowę, ani uzyskanie decyzji środowiskowej. Uzyskana energia będzie wykorzystywana na potrzeby własne przedsiębiorstwa a nadwyżka energii sprzedawana będzie do ogólnopolskiego operatora energii elektrycznej. Realizacja projektu jest uzasadniona zarówno ekonomicznie, środowiskowo, społecznie i gospodarczo oraz przyczyni się do osiągania założonych przez Unię Europejską wytycznych. Głównym celem projektu jest zwiększenie udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym gminy Reszel poprzez budowę mikroelektrowni fotowoltaicznych o mocy 39,6 kWp w oczyszczalni ścieków przy ul. Rataja oraz na ujęciu wody przy ul. Gdański w Reszlu przez Wielobranżowe Przedsiębiorstwo Komunalne Sp. z o.o. w Reszlu do września 2018 roku. Etapy realizacji: 1. Etap przygotowań – wybór wykonawcy zgodnie z zasadą konkurencyjności 2. Etap Wdrożenia- zakup i montaż 2 instalacji Projekt jest zgodny ze Strategią rozwoju społeczno-gospodarczego województwa warmińsko- mazurskiego do roku 2025 oraz wpisuje się w SZOOP RPO WiM 2014-2020 gdyż przyczynia się do realizacji zaplanowanych ww. dokumentach celów, wskaźników i rezultatów, jest zgodny z możliwymi do dofinansowania formami wsparcia oraz typem beneficjentów . Projekt realizuje cel Działania 4.1 zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu poprzez zakup i montaż 2 instalacji fotowoltaicznej o mocy 39,6 kW. Projekt zakończy się w ciągu 1 roku od daty podpisania umowy o dofinansowanie. (Polish)
0 references
The planned investment will consist of the purchase and installation of 2 photovoltaic installations with a capacity of 39.6 kW each on water capture at ul. Gdańska w Reszlu by Wielobranżowe Przedsiębiorstwo Komunalne Sp. z o.o. in Reszl using 132 photovoltaic panels (each installation) with a capacity of 300 W each panel. No construction permit or environmental decision are required to carry out this investment. The resulting energy will be used for the own needs of the company and the excess energy will be sold to a nationwide electricity operator. The implementation of the project is justified both economically, environmentally, socially and economically and will contribute to achieving the guidelines established by the European Union. The main objective of the project is to increase the share of renewable energy sources in the overall energy balance of the municipality of Reszel through the construction of photovoltaic microelectric plants with a capacity of 39.6 kWp in the sewage treatment plant at ul. Rataja and on the angle of water at ul. Gdański w Reszlu by Wielobranżowe Przedsiębiorstwo Komunalne Sp. z o.o. in Reszl until September 2018. Stages of implementation: 1. Preparation phase – selection of the contractor in accordance with the principle of competitiveness 2. Implementation stage – purchase and assembly of 2 installations The project is consistent with the strategy of socio-economic development of the Warmia-Mazury voivodship until 2025 and is in line with SZOOP RPO WiM 2014-2020 as it contributes to the realisation of the objectives, indicators and results planned above, is compatible with co-financed forms of support and type of beneficiaries. The project fulfils the objective of Measure 4.1 increased share of renewable energy sources in the overall energy balance of the region through the purchase and assembly of 2 photovoltaic installations with a capacity of 39.6 kW. The project will be completed within 1 from the date of signing the grant agreement. (English)
21 October 2020
0 references
L’investissement prévu consistera en l’achat et l’installation de 2 installations photovoltaïques d’une capacité de 39,6 kW chacune sur la prise d’eau à ul. Gdański à Reszl par Wielobranzowe Przedsiębiorstwo Komunalne Sp. z o.o. à Reszl utilisant 132 panneaux photovoltaïques (chaque installation) de 300 W chaque panneau. Aucun permis de construire ou décision environnementale n’est requis pour la mise en œuvre de l’investissement. L’énergie obtenue sera utilisée pour les besoins propres de l’entreprise et l’excédent d’énergie sera vendu à l’opérateur électrique national. La mise en œuvre du projet est à la fois justifiée sur les plans économique, environnemental, social et économique et contribuera à la réalisation des orientations fixées par l’Union européenne. L’objectif principal du projet est d’augmenter la part des sources d’énergie renouvelables dans le bilan énergétique global de la commune de Reszel par la construction d’une centrale photovoltaïque de microélectricité d’une capacité de 39,6 kWp dans une station d’épuration des eaux usées à UL. Rataja et prise d’eau à l’ul. Gdański à Reszl par Wielobranzowe Przedsiębiorstwo Komunalne Sp. z o.o. à Reszl jusqu’en septembre 2018. Étapes de la mise en œuvre: 1. Phase de préparation — sélection du contractant conformément au principe de compétitivité 2. Phase de mise en œuvre — achat et installation de 2 installations Le projet est conforme à la stratégie de développement socio-économique de la voïvodie de Warmińsko-Mazurskie jusqu’en 2025 et fait partie du ROP WiM 2014-2020 du SZOOP parce qu’il contribue à la mise en œuvre des documents, objectifs, indicateurs et résultats susmentionnés, conformément aux formes de soutien pouvant être cofinancées et au type de bénéficiaires. Le projet met en œuvre l’objectif de la mesure 4.1 d’augmenter la part des sources d’énergie renouvelables dans le bilan énergétique global de la région en achetant et en installant 2 installations photovoltaïques d’une capacité de 39,6 kW. Le projet sera achevé dans un délai d’un an à compter de la date de signature de la convention de subvention. (French)
2 December 2021
0 references
Identifiers
RPWM.04.01.00-28-0482/16
0 references