Construction of Somonino integration node with access routes (Q122334)

From EU Knowledge Graph
Revision as of 08:22, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la construction d’un nœud d’intégration à Somonin, qui consiste en la rénovation d’une partie du bâtiment de la gare, en tenant compte des fonctions de transport de l’installation, la création d’un système de surveillance de la gare, la modernisation de la route d’accès ul. Le chemin de fer avec la construction de trottoirs, de baies et d’espaces de stationnement, la construction d’un parcours cyclable de la jonction Somoni...)
Jump to navigation Jump to search
Project Q122334 in Poland
Language Label Description Also known as
English
Construction of Somonino integration node with access routes
Project Q122334 in Poland

    Statements

    0 references
    2,457,469.0 zloty
    0 references
    589,792.56 Euro
    13 January 2020
    0 references
    4,289,825.88 zloty
    0 references
    1,029,558.21 Euro
    13 January 2020
    0 references
    57.29 percent
    0 references
    29 May 2017
    0 references
    31 December 2019
    0 references
    GMINA SOMONINO
    0 references
    Przedmiotem projektu jest budowa węzła integracyjnego w Somoninie polegająca na remoncie części budynku dworca kolejowego z uwzględnieniem funkcji transportowych obiektu, utworzeniu systemu monitoringu dworca, modernizacji drogi dojazdowej ul. Kolejowej wraz z budową chodników, zatoczek i miejsc parkingowych, budowie trasy rowerowej od węzła Somonino do Ostrzyc (5 313 m). Na zakończenie projektu w ramach instrumentu elastyczności zostaną przeprowadzone działania informacyjno-edukacyjne, promujące transport zbiorowy i niezmotoryzowany. Inwestycja realizowana będzie na terenie Gminy Somonino w pow. kartuskim. Celem głównym projektu jest wzrost liczby pasażerów transportu zbiorowego i transportu niezmotoryzowanego. Przewidywany wskaźniki: Liczba wybudowanych zintegrowanych węzłów przesiadkowych 1 szt. Liczba wybudowanych obiektów „parkuj i jedź” 1 szt. Liczba pasażerów publicznego transportu zbiorowego korzystających z infrastruktury-21900 osoby/rok (Polish)
    0 references
    The object of the project is the construction of an integration hub in Somonin consisting of repairing part of the railway station building, including the transport functions of the facility, the creation of a monitoring system for the station, modernisation of the access road ul. Railway with the construction of pavements, coves and parking spaces, construction of a bicycle route from the Somonino junction to the blades (5313 m). At the end of the project, information and education activities will be carried out under the Flexibility Instrument, promoting collective transport and non-motorised transport. The investment will be carried out in the Somonino commune in the area of Kartuskie. The main objective of the project is to increase the number of passengers in public transport and non-motorised transport. Projected indicators: Number of integrated interchange nodes built 1 pcs. Number of built objects “park and drive” 1 pcs. Number of public public transport passengers using infrastructure-21900 persons/year (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’un nœud d’intégration à Somonin, qui consiste en la rénovation d’une partie du bâtiment de la gare, en tenant compte des fonctions de transport de l’installation, la création d’un système de surveillance de la gare, la modernisation de la route d’accès ul. Le chemin de fer avec la construction de trottoirs, de baies et d’espaces de stationnement, la construction d’un parcours cyclable de la jonction Somonino à Ostrzyce (5 313 m). À la fin du projet, des activités d’information et d’éducation seront menées dans le cadre de l’instrument de flexibilité pour promouvoir les transports collectifs et non motorisés. L’investissement sera réalisé dans la commune de Somonino dans la région de Kartusa. L’objectif principal du projet est d’augmenter le nombre de passagers dans les transports publics et les transports non motorisés. Indicateurs projetés: Nombre de moyeux intégrés construits 1 pièce Nombre de bâtiments construits «park and drive» 1 pcs. Nombre de passagers des transports publics utilisant l’infrastructure-21900 personnes/an (French)
    2 December 2021
    0 references

    Identifiers

    RPPM.09.01.01-22-0011/17
    0 references