Energy modernisation of public utility buildings of the City of Jasła (Q118688)

From EU Knowledge Graph
Revision as of 07:16, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la modernisation de l’énerget. 7 bâtiments publics à Jasła: L’hôtel de ville (par exemple, chauffage des murs, plafond, remise à neuf, givrage, remplacement des fenêtres et des portes extérieures, remplacement des radiateurs, installation de vannes thermostat, remplacement des conduits, isolation des câbles, remplacement des chaudières pour un rendement élevé 166 kW, remplacement de l’éclairage, système de foudre); SP no 2...)
Jump to navigation Jump to search
Project Q118688 in Poland
Language Label Description Also known as
English
Energy modernisation of public utility buildings of the City of Jasła
Project Q118688 in Poland

    Statements

    0 references
    8,643,226.37 zloty
    0 references
    2,074,374.33 Euro
    13 January 2020
    0 references
    10,168,501.76 zloty
    0 references
    2,440,440.42 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 February 2016
    0 references
    29 December 2017
    0 references
    MIASTO JASŁO
    0 references
    0 references
    Przedmiotem projektu jest modernizacja energet. 7 budynków użyteczności publicznej w Jaśle: Urząd Miasta (m.in. ocieplenie ścian, stropu, stropodachu, lukarn, wymiana okien i drzwi zewn., wymiana grzejników, montaż zaworów termostat., wymiana przewodów, izolacja przewodów, wymiana kotła na wysokosprawny 166 kW, wymiana oświetlenia, inst. odgromowa); SP nr 2 (m.in. docieplenie ścian, stropodachu, wymiana okien i drzwi, docieplenie kominów, demontaż i montaż nowych elementów inst. CO, wymiana inst. elekt. i opraw oświetleniowych, inst. odgromowa); SP nr 4 (m.in. docieplenie ścian, stropodachu, wymiana stolarki okiennej i drzwiowej, wykonanie obróbek blacharskich, remont kominów, wymiana oświetlenia, montaż wywietrznika wraz z rekuperatorem, modernizacja inst. CO); SP nr 11 (m.in. docieplenie ścian, stropodachu, stropu żelbetowego, kominów, przebudowa szachtów piwniczych, wymiana stolarki okienno-drzwiowej, prace przy inst. CO, inst. odgromowa, wymiana oświetlenia); ZSM nr 5 (m.in. docieplenie ścian i dachu, wymiana stolarki drzwiowej i okiennej, docieplenie kominów, inst. CO - demontaż, wymiana kotła na gazowy 200 kW, montaż systemu – grzejników, głowic termostatycznych, wykonanie inst. elekt., miedzianej, puszek rozdzielczych, wymiana opraw, inst. odgromowa); budynek siłowni MOSiR (m.in. docieplenia ścian i dachu, docieplenie kominów, wymiana stolarki okienno-drzwiowej, inst. CO - wodna pompowa wraz z armaturą i grzejnikami, wymiana oświetlenia, inst. odgromowa); budynek techniczno-administracyjny MOSiR (m.in. docieplenie ścian i dachu, docieplenie kominów, wymiana stolarki okienno-drzwiowej, wymiana grzejników, modernizacja oświetlenia, inst. odgromowa). Cel strategiczny projektu: zmniejszenie zapotrzebowania na energię oraz poprawa efektywności energet. obiektów. Wskaźnik energii pierwotnej 984,825 [kWh/(m2rok)], zmniejszenie zapotrzebowania na zużycie energii o 60,85 %. Wskazany zakres robót jest zgodny z optymalnymi wariantami z audytów energ. budynków. (Polish)
    0 references
    The subject of the project is the modernisation of the energet. 7 public buildings in Jaslo: City Hall (e.g. wall warming, ceiling, ceiling, glazing, window and exterior doors, replacement of radiators, installation of thermostat valves, wiring, insulation of wires, replacement of boiler for high performance 166 kW, replacement of lighting, lightning protection); SP nr 2 (including warming of walls, ceiling, window and door replacement, chimney warming, dismantling and assembly of new elements inst. What, replacement of electrical equipment and luminaires, lightning protection); SP nr 4 (e.g. insulation of walls, ceiling, replacement of window and door carpentry, metalworking, chimney repair, lighting replacement, installation of vents with recuperator, modernisation of inst. CO; SP nr 11 (e.g. warming of walls, ceiling, reinforced concrete ceiling, chimneys, reconstruction of cellar chess, replacement of window and door carpentry, work on the inst. What, lightning protection, lighting exchange); ZSM No 5 (e.g. insulation of walls and roof, replacement of door and window joinery, chimney warming, inst. What – dismantling, replacement of the boiler for gas 200 kW, installation of the system – radiators, thermostatic heads, manufacture of electrical, copper, distribution cans, exchange of luminaires, lightning protection); building of the MOSiR gym (e.g. insulation of walls and roof, warming of chimneys, replacement of window and door carpentry, inst. Co – water pump with fittings and radiators, lighting exchange, lightning protection); technical and administrative building MOSiR (e.g. insulation of walls and roof, warming of chimneys, replacement of window and door joinery, replacement of radiators, modernisation of lighting, lightning protection). Strategic objective of the project: reduce energy demand and improve energy efficiency of objects. Primary energy ratio 984,825 [kWh/(m2year)], reduction of energy consumption by 60,85 %. The scope of works indicated is consistent with optimal variants of energy audits of buildings. (English)
    20 October 2020
    0 references
    L’objet du projet est la modernisation de l’énerget. 7 bâtiments publics à Jasła: L’hôtel de ville (par exemple, chauffage des murs, plafond, remise à neuf, givrage, remplacement des fenêtres et des portes extérieures, remplacement des radiateurs, installation de vannes thermostat, remplacement des conduits, isolation des câbles, remplacement des chaudières pour un rendement élevé 166 kW, remplacement de l’éclairage, système de foudre); SP no 2 (par exemple isolation des murs, rénovation des fenêtres et des portes, réchauffement des cheminées, démontage et montage de nouveaux éléments. Quoi, l’échange d’électricité et d’appareils d’éclairage, la foudre inst.); SP 4 (par exemple isolation des murs, rénovation, remplacement de la menuiserie des fenêtres et des portes, travail des tôles, rénovation des cheminées, remplacement de l’éclairage, installation d’un évent avec un récupérateur, modernisation de l’intérieur. QUOI); SP no 11 (y compris l’isolation des murs, des planchers, du plafond en béton armé, des cheminées, des échecs de bière, le remplacement de la menuiserie des fenêtres et des portes, travaux à l’intérieur. Quoi, la foudre inst., le remplacement de l’éclairage); ZSM No 5 (y compris l’isolation des murs et du toit, le remplacement de la menuiserie des portes et des fenêtres, le réchauffement des cheminées, inst. Quoi — démontage, remplacement de la chaudière pour 200 kW de gaz, installation du système — radiateurs, têtes thermostatiques, exécution électrique, cuivre, boîtes de distribution, remplacement des luminaires, foudre inst.); construction du gymnase MOSiR (y compris l’isolation des murs et du toit, le réchauffement des cheminées, le remplacement de la menuiserie des fenêtres et des portes, inst. Quoi — pompe à eau avec raccords et radiateurs, remplacement de l’éclairage, éclair inst.); bâtiment technique et administratif MOSiR (par exemple, isolation des murs et du toit, réchauffement des cheminées, remplacement de menuiseries de fenêtres et de portes, remplacement des radiateurs, modernisation de l’éclairage, foudre inst.). Objectif stratégique du projet: réduire la demande d’énergie et améliorer l’efficacité énergétique des installations. Ratio d’énergie primaire 984,825 [kWh/(m2year)], réduction de la demande de consommation d’énergie de 60,85 %. L’éventail des travaux indiqués est conforme aux variantes optimales des audits énergétiques des bâtiments. (French)
    2 December 2021
    0 references

    Identifiers

    RPPK.03.02.00-18-0056/16
    0 references