Thermomodernisation of three public buildings with heat exchange and installation of renewable energy sources in the Radmno commune (Q118681)

From EU Knowledge Graph
Revision as of 07:16, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet est de réduire la consommation d’énergie finale/primaire, de réduire les coûts de production de chaleur et d’électricité dans les bâtiments couverts par le projet, de produire de l’énergie électrique/chauffante à partir des SER et de réduire la quantité de polluants dans l’atmosphère. Le projet de thermomodernisation ainsi que le remplacement de la source de chaleur et l’installation de bâtiments RES 3 utilisant le...)
Jump to navigation Jump to search
Project Q118681 in Poland
Language Label Description Also known as
English
Thermomodernisation of three public buildings with heat exchange and installation of renewable energy sources in the Radmno commune
Project Q118681 in Poland

    Statements

    0 references
    2,238,155.41 zloty
    0 references
    537,157.30 Euro
    13 January 2020
    0 references
    2,633,124.08 zloty
    0 references
    631,949.78 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2015
    0 references
    31 December 2017
    0 references
    GMINA RADYMNO
    0 references
    0 references
    Głównym celem realizacji projektu jest zmniejszenie zużycia energii końcowej/pierwotnej, obniżenie kosztów wytwarzania energii cieplnej oraz energii elektr. w bud. objętych przedmiotowym projektem, wytwarzanie energii elektr./cieplnej z OZE oraz zmniejszenie ilości zanieczyszczeń do atmosfery.Projekt dot. termomodernizacji wraz z wymianą źródła ciepła oraz montażem OZE 3 bud. użyt. publ.: ZS w Łazach, ZS w Ostrowie, ZS Korczowa budynek w Młynach.W ZS w Łazach zaplanowano:-docieplenie stropu pod nieogrz. poddaszem-482,00m2-docieplenie ścian zewn.-524,6m2-docieplenie podłóg na gruncie-482,00m2-modernizację inst. ogrzewania wraz z montażem kotła na biomasę o mocy 100kW-wymianę okien o łącznej pow.181,64m2 i drzwi o łącznej pow.11,60m2-montaż paneli PV o mocy 3,36kWW ZS Korczowa, bud. w Młynach zaplanowano:-docieplenie stropu pod nieogrz. poddaszem-443,00m2-docieplenie ścian zewn.-611,60m2-docieplenie podłóg na gruncie-405,80m2-modernizację inst. ogrzewania wraz z montażem kotła na biomasę o mocy 60kW-wymianę okien o łącznej pow. 112,82m2 i drzwi o łącznej pow. 17,84m2-montaż paneli PV o mocy 3,08kWW ZS w Ostrowie zaplanowano:-wymianę okien o łącznej pow. 308,62m2 i drzwi o łącznej pow. 13,51m2-docieplenie stropu pod nieogrz. poddaszem-472,3m2-docieplenie dachów-696,5m2-docieplenie ścian zewn.-1452,20m2-docieplenie podłóg na gruncie-1083,50m2-modernizację inst. ogrzewania wraz z montażem kaskady 2 kotłów gazowych kondensacyjnych, każdy o mocy 100kW-montaż paneli PV o mocy 4,20kW-inst. kol. słon. o mocy 6,61kWRealizacja inwest. pozwoli na uzyskanie:a)w ZS w Łazach wskaźnika EP na poziomie 47,55kWh/(m2*rok)oraz zostanie zmniejszone zapotrzeb. na zużycie energii o 60,79%b)w ZS w Korczowej, budynek w Młynach wskaźnika EP na poziomie 59,93kWh/(m2*rok) oraz zostanie zmniejszone zapotrzeb. na zużycie energii o 63,17%c)w ZS w Ostrowie wskaźnika EP na poziomie 80,62kWh/(m2*rok) oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 55,69% (Polish)
    0 references
    The main objective of the project is to reduce final/primary energy consumption, reduce the costs of heat and electricity generation in the buildings covered by the project, generation of electricity/warm energy from RES and reduce the amount of pollutants into the atmosphere. In the ZS in Łazy it is planned:-increasing floor warming under the attic-482.00 m²-warming of the outer walls.-524.6 m²-increase of flooring on the ground-482.00 m²-modernisation of inst. heating together with the installation of a boiler for biomass 64 sq.m. 112,82 m² and doors with total area. 17.84 m²-assembly of PV panels with a capacity of 3.08kWW ZS in Ostrów is planned for:-exchange of windows with total area. 308,62 m² and doors with total area. 20.20 m² floor warming in the area of 63.50 m²-conditioning of the roofs-696.5 m²-warming of the outer walls.-1452.20 m²-heated floor warming on land-1083.50 m²-upgrading of the heating in 17.2 sq. of energy with assembly of the cascade of 2 condensation boilers, each with a power 100 kW-assembly of PV panels of 4,20 kW-inst. (English)
    20 October 2020
    0 references
    L’objectif principal du projet est de réduire la consommation d’énergie finale/primaire, de réduire les coûts de production de chaleur et d’électricité dans les bâtiments couverts par le projet, de produire de l’énergie électrique/chauffante à partir des SER et de réduire la quantité de polluants dans l’atmosphère. Le projet de thermomodernisation ainsi que le remplacement de la source de chaleur et l’installation de bâtiments RES 3 utilisant le publ. ZS à Łazy, ZS à Ostrów, bâtiment ZS Korczowa à Młyny. Dans le ZS à Łazay, il est prévu de réchauffer le plafond sous chaleur. grenier-482,00 m² — isolation des murs extérieurs 524,6 m² — isolation des planchers sur le sol — 482,00 m² — modernisation du chauffage inst. avec l’installation d’une chaudière à biomasse d’une capacité de 100 kW-replacement de fenêtres d’une superficie totale de 181,64 m² et portes d’une surface totale de 11,60 m²-ensemble de panneaux PV d’une puissance de 3,36kWW ZS Korczowa, ZS Korczowa, ZS Korczowa. bâtiment à Młyny prévu: — réchauffement du plafond sous chaleur. grenier-443,00 m² — isolation des murs extérieurs-611,60 m²-chauffement des planchers sur le sol-405,80 m² — modernisation du chauffage inst. avec l’installation d’une chaudière à biomasse d’une puissance de 60 kW — remplacement des fenêtres par une surface totale. 112,82 m² et portes d’une superficie totale. 17,84 m²-assemblage de panneaux PV d’une puissance de 3,08kWW ZS à Ostrów prévu:-remplacement des fenêtres avec une superficie totale. 308,62 m² et portes d’une superficie totale. 13,51 m²-chauffage du plafond sous non-chauffage. grenier-472,3 m²-chauffage des toitures 696,5 m² — isolation des murs extérieurs-1 452,20 m²-chaudage des planchers au sol-1 083,50 m²-mise à niveau du chauffage inst. avec l’installation de 2 chaudières à gaz à condensation en cascade, chacune d’une puissance de 100 kW-ensemble de panneaux photovoltaïques d’une puissance de 4,20 kW-col. saline. avec une puissance de 6,61kWInvestissement permettra d’effectuer des travaux de chauffage. pour obtenir:a)en ZS à Łazas, l’indicateur PE au niveau de 47,55 kWh/(m²*an) et sera réduit. pour la consommation d’énergie de 60,79 %b)dans le ZS de Korczowa, le bâtiment dans les moulins de l’indicateur PE de 59,93 kWh/(m²*an) et la demande de consommation d’énergie seront réduites de 63,17 %c)dans le ZS à Ostrów l’indicateur PE de 80,62 kWh/(m²*an) et la demande d’énergie sera réduite de 55,69 % (French)
    2 December 2021