Establishment of a back-up facility – a public transport centre in Brzeźnica through the reconstruction of the infrastructure for the service of travellers (Q113038)
Jump to navigation
Jump to search
Project Q113038 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Establishment of a back-up facility – a public transport centre in Brzeźnica through the reconstruction of the infrastructure for the service of travellers |
Project Q113038 in Poland |
Statements
2,251,979.66 zloty
0 references
2,649,387.97 zloty
0 references
85.0 percent
0 references
1 January 2018
0 references
31 December 2018
0 references
GMINA BRZEŹNICA
0 references
Projekt polega na przebudowie zabytkowego, będącego w ruinie, Dworca kolejowego w Brzeźnicy i zagospodarowaniu terenów do niego przylegających na centrum transportu komunikacji zbiorowej działania objęte projektem nie dotyczą prac remontowych, jak również nie będą dotyczyły utrzymania tej infrastruktury. Stworzy to możliwość obsługi podróżnych, w tym przesiadki z komunikacji indywidualnej na środek komunikacji zbiorowej. Obiekty powstałe w ramach projektu zostaną przystosowane do potrzeb osób niepełnosprawnych oraz spełnią wytyczne ujęte w systemie Małopolska Karta Aglomeracyjna MKA. Zakres rzeczowy inwestycji:1. Przebudowa budynku dworca kolejowego w zakresie wykonania: robót budowlanych roboty murowe, izolacja pozioma ścian iniekcji krystalicznej ciśnieniowej, kominy, schody żelbetowe z parteru na piętro, roboty tynkarskie, wymiana konstrukcji i pokrycia dachu, stropy nad parterem, nad piętrem, stolarka i ślusarka budowlana, posadzki i okładziny ścian, roboty malarskie, elewacja, instalacje: c.o., wod.kan., elektrycznej teletechniczne, wyposażenie2. Zagospodarowanie terenu wokół dworca polegające m.in. na: wykonaniu nowych miejsc postojowych parkingów utwardzonych kostką brukową ParkRide, wykonanie chodników, częściowe przebudowanie drogi zapewniającej dojazd do dworca, wkomponowanie zaplecza komunikacji autobusowej w teren dworca odpowiednia lokalizacja i montaż nowej wiaty przystankowej, podjazdy i udogodnienia dla osób niepełnosprawnych, wiaty rowerowe, system monitoringu, oświetlenie, mała architektura, zagospodarowanie terenów zielonych. W centrum przesiadkowym znajdzie się miejsce m.in. na rowery, tablicę świetlną, a także na co najmniej jeden biletomat. Przygotowany zostanie parking dla rowerów i miejsca na instalacje sterujące ruchem drogowym i monitoringiem.Ponadto realizowane będą zadania z zakresu: wyposażenia dworca PKP w tym system informacji pasażerskiej tablice multimedialne, nadzoru inwestorskiego i promocji. (Polish)
0 references
The project consists of the reconstruction of the historic railway station in Brzeźnica, which is in ruins and the development of areas adjacent to the public transport centre, the activities covered by the project do not concern repair works, nor will they concern the maintenance of this infrastructure. This will create the possibility of handling travellers, including switching from individual to public transport. The facilities created as part of the project will be adapted to the needs of people with disabilities and will meet the guidelines included in the system of the Małopolska Agglomeration Card MKA. Material scope of investments:1. Reconstruction of the railway station building in the scope of: construction works for masonry, horizontal insulation of walls of crystal pressure injection, chimneys, reinforced concrete stairs from ground to floor, plaster works, replacement of roof structures and roof coverings, ceilings above the ground floor, above the floor, carpenter and locksmith, floors and wall coverings, painting works, facades, installations: C.O., water.can., electrical teletechnics, equipment2. The development of the area around the station consists of, among others: construction of new parking spaces paved with paving stones ParkRide, construction of pavements, partial reconstruction of the road providing access to the station, integration of bus transport facilities in the station area appropriate location and installation of a new stop shelter, driveways and facilities for disabled people, bicycle shelters, monitoring system, lighting, small architecture, development of green areas. In the interchange centre there will be a place for bicycles, light boards, as well as at least one ticket machine. There will be a parking lot for bicycles and spaces for traffic control and monitoring installations.In addition, the following tasks will be carried out: equipment of the PKP station including a system of passenger information multimedia boards, investor supervision and promotion. (English)
20 October 2020
0 references
Le projet consiste en la reconstruction de la gare historique de Brzeźnica, en ruines, et par le développement de zones adjacentes au centre des transports publics, les activités couvertes par le projet ne concernent pas les travaux de rénovation et ne concerneront pas l’entretien de ces infrastructures. Cela offrira la possibilité de desservir les voyageurs, y compris le passage des transports individuels aux transports publics. Les installations créées dans le cadre du projet seront adaptées aux besoins des personnes handicapées et répondront aux lignes directrices énoncées dans le système de cartes d’agglomération MKA de Małopolska. Portée matérielle de l’investissement:1. Reconstruction du bâtiment de la gare ferroviaire en ce qui concerne l’exécution de: travaux de construction maçonnerie, isolation horizontale des murs à injection de pression cristalline, cheminées, escaliers en béton armé du rez-de-chaussée, travaux de plâtre, remplacement des structures et revêtements de toiture, plafonds au-dessus du rez-de-chaussée, au-dessus du sol, menuiserie et serrurier, planchers et revêtements muraux, travaux de peinture, façades, installations: c.o., hydrocan, matériel télétechnique électrique, équipement2. Développement de la zone autour de la station comprenant, entre autres: la construction de nouveaux espaces de stationnement pavés de chaussées ParkRide, la construction de trottoirs, la reconstruction partielle de la route assurant l’accès à la gare, l’intégration des moyens de transport par autobus dans la zone de la gare et l’installation d’un nouvel abri, des allées et des installations pour les personnes handicapées, des hangars à vélos, un système de surveillance, l’éclairage, de petites architectures, des espaces verts. Dans le centre de transfert, il y aura de l’espace pour les vélos, une plaque légère, ainsi que pour au moins un distributeur de billets. Un parking pour les vélos et un espace pour les systèmes de contrôle et de surveillance de la circulation seront mis en place et des tâches seront effectuées dans les domaines suivants: l’équipement de la gare, y compris les cartes multimédias du système d’information des voyageurs, la supervision et la promotion des investisseurs. (French)
1 December 2021
0 references
Identifiers
RPMP.07.02.04-12-0345/17
0 references