“Construction of infrastructure on foot – bicycle in the district of Opole – stage II and construction of the interchange centre in the Lewin Brzeski Commune” (Q114854)
Jump to navigation
Jump to search
Project Q114854 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | “Construction of infrastructure on foot – bicycle in the district of Opole – stage II and construction of the interchange centre in the Lewin Brzeski Commune” |
Project Q114854 in Poland |
Statements
39,791,064.92 zloty
0 references
49,037,887.95 zloty
0 references
81.14 percent
0 references
21 December 2016
0 references
31 December 2021
0 references
POWIAT OPOLSKI
0 references
Przedmiotem projektu jest poprawa jakości życia społeczności lokalnej poprzez ograniczenie zanieczyszczenia powietrza na obszarze Aglomeracji Opolskiej, wskutek rozbudowy infrastruktury dla ruchu rowerowego, a poprzez budowę centrów przesiadkowych oraz parkingów Bike&Ride i Park&Ride łączenie indywidualnych środków transportu z publicznym transportem zbiorowym jakimi są kolej i autobusy. W ramach realizacji projektu powstanie: infrastruktura pieszo-rowerowa o łącznej dług. 38,52 km (w tym wybudowanej 33,19km, przebudowanej 2,80km i wyznaczonej 2,53km); 6 park. Bike&Ride zlokalizowanych w pobliżu stacji kolej. (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice i Turawa) oraz przystanku autobus. (Prószków-Pomologia). Łącznie powstanie 160 stanowisk dla rowerów w ramach park. Bike&Ride; 4 parkingi Park&Ride zlokalizowanych w pobliżu stacji kolej (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice), na łączną liczbę 66 miejsc postojowych dla samochodów w tym 5 miejsc dla osób niepełnosprawnych; centrum przesiadkowe w m. Lewin Brzeski przy dworcu kolejowym obsługującym główną linię relacji Opole – Wrocław; centrum przesiadkowe w m. Tułowice przy stacji kolej. obsługującej linię relacji Opole – Nysa; centrum przesiadkowe w m. Suchy Bór przy stacji kolej. obsługującej linię relacji Opole –Fosowskie. Projekt przewiduje również budowę energooszczędnego oświetlenia typu LED oraz wymianę istniejących lamp na energooszczędne wzdłuż planowanej do budowy infrastruktury pieszo-rowerowej oraz uzupełnienie energooszczędnego oświetlenia ulicznego na terenie miasta Lewin Brzeski (ul.: Rolna, Pocztowa, Krasickiego, Marzanny, Wiśniowa, Leśna, Wiosenna, Rzemieślnicza, Szafirowa, Kościuszki, Ochronna, Kościuszki, Mickiewicza, Zamkowa, Cicha, Jesienna, Słowackiego, Akacjowa, Kolejowa). W ramach projektu wykonane zostaną niezbędne roboty związane z poszerzeniem jezdni dróg powiat. (1702O, 1703O, 1705O, 1712O, 1756O) i wojewódzkich (414, 461), na odc. wzdłuż których powstaną drogi dla rowerów (Polish)
0 references
The aim of the project is to improve the quality of life of the local community by reducing air pollution in the Opole Agglomeration, as a result of the development of infrastructure for cycling, and through the construction of interchange centres and car parks Bike&Ride;Ride combining individual means of transport with public public transport such as railways and buses. As part of the implementation of the project, the following will be created: infrastructure on foot-bicycle with a total debt. 38,52 km (including 33,19 km built, reconstructed 2,80 km and designated 2,53 km); It’s 6 park. Bike &Ride located near the railway station. (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice and Turawa) and bus stop. (Customs-pomology). A total of 160 bicycle stations will be built within the park. Bike&Ride; 4 parking lots of Park &Ride located near the station (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice), for a total of 66 parking spaces for cars including 5 seats for disabled people; interchange centre in Lewin Brzeski at the railway station serving the main line of the Opole-Wroc³aw relationship; interchange centre in Tułowice near the railway station. serving the Opole – Nysa line; interchange centre in Suchy Bór near the railway station. serving the Opole-Fosowskie line. The project also provides for the construction of energy-saving LED lighting and replacement of existing lamps for energy-efficient along the planned construction of foot-bike infrastructure and supplementing energy-saving street lighting in the city of Lewin Brzeski (ul.: Agricultural, Pocztowa, Krasicki, Marzanny, Wiśniowa, Leśna, Spring, Rzemieślnicza, Szafirova, Kościuszki, Ochronna, Kościuszki, Mickiewicza, Zamkowa, Cicha, Autumn, Słowacki, Akaciwa, Kolejowa). As part of the project, the necessary works related to the extension of the roadways of the district will be carried out. (1702O, 1703O, 1705O, 1712O, 1756O) and voivodships (414, 461) along which roads for bicycles will be created (English)
20 October 2020
0 references
L’objectif du projet est d’améliorer la qualité de vie de la communauté locale en réduisant la pollution de l’air dans la zone de l’agglomération d’Opole, grâce au développement d’infrastructures pour le cyclisme, et par la construction de centres de transfert et de parcs de stationnement Bike&Ride et Park, combinant les moyens de transport individuels avec les transports publics tels que les chemins de fer et les autobus. Dans le cadre de la mise en œuvre du projet: infrastructure de vélos à pied avec une dette totale. 38,52 km (dont 33,19 km, reconstruits 2,80 km et 2,53 km); 6ème parc. Bike&Ride est situé près de la gare. (Dry Bór, Tarnów Op., Lewin Brzeski, Tułowice et Turawa) et arrêt de bus. (Pomologie pomologie). Un total de 160 stations cyclables seront construites dans le parc. Vélo &Ride; 4 parkings Park&Ride situé près de la gare (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice), pour un total de 66 places de stationnement pour voitures dont 5 places pour personnes handicapées; le centre de transfert de Lewin Brzeski à la gare desservant la ligne principale des relations Opole — Wrocław; le centre de transfert de Tułowika près de la gare. desservant la ligne de la relation Opole — Nysa; centre de transfert à Suchy Bór par la gare desservant la ligne des relations Opole-Fosowskie. Le projet prévoit également la construction d’un éclairage LED économe en énergie et le remplacement des lampes existantes par des lampes économes en énergie le long de l’infrastructure de vélos à pied prévue et complétant l’éclairage public économe en énergie dans la ville de Lewin Brzeski (ul.: Agriculture, Postal, Krasickiego, Marzanna, Wiśniowa, Forêt, Printemps, Artisanat, Szafirowa, Kościuszki, Protective, Kościuszko, Mickiewicza, Zamkowa, Cicha, Autumn, slovaque, akacjowa, chemin de fer). Dans le cadre du projet, les travaux nécessaires liés à l’extension des routes du district seront réalisés. (1702O, 1703O, 1705O, 1712O, 1756O) et provinciale (414, 461), le long de laquelle des routes pour bicyclettes seront construites (French)
1 December 2021
0 references
Identifiers
RPOP.03.01.02-16-0005/16
0 references