Modernisation of public buildings in Lubień commune (Q112268)

From EU Knowledge Graph
Revision as of 12:11, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Dans le cadre du projet, deux tâches d’investissement sont prévues: 1. Modernisation énergétique globale du bâtiment no 34: — Réchauffement du plafond au-dessus de la salle de bal et du bureau (W1) — Réchauffement des murs extérieurs recouverts de tôle (W1) — Réchauffement du plafond au-dessus de l’aile SE et de l’arrière du Hall (W1) — Réchauffement des murs extérieurs au g.38 cm (W1) — Modernisation du système de chauffage — Modernisation du s...)
Jump to navigation Jump to search
Project Q112268 in Poland
Language Label Description Also known as
English
Modernisation of public buildings in Lubień commune
Project Q112268 in Poland

    Statements

    0 references
    510,719.02 zloty
    0 references
    122,572.56 Euro
    13 January 2020
    0 references
    894,899.38 zloty
    0 references
    214,775.85 Euro
    13 January 2020
    0 references
    57.07 percent
    0 references
    2 May 2016
    0 references
    31 March 2018
    0 references
    GMINA LUBIEŃ
    0 references
    0 references
    W ramach projektu zaplanowano realizację dwóch zadań inwestycyjnych: 1. Kompleksowej modernizacji energetycznej budynku nr 34: - Ocieplenie stropu nad salą balową i biurem (W1) - Ocieplenie ścian zewnętrznych pokrytych blachą (W1) - Ocieplenie stropu nad skrzydłem SE i zapleczem Sali (W1) - Ocieplenie ścian zewnętrznych o gr.38cm (W1) - Modernizacja systemu ogrzewania - Modernizacja systemu oświetlenia - Ocieplenie stropu nad balkonem w pom.201 (W1) - Ocieplenie stropu nad pokojem 114 (W1) - Wymiana okien zewnętrznych U=2,6W/m2K (W1) - Wymiana drzwi zewnętrznych U=2,5W/m2K (W1) 2. Kompleksowej modernizacji energetycznej budynku nr 50: Modernizacja systemu oświetlenia (W2) Ocieplenie ścian zewnętrznych o gr. 25cm (W1) Ocieplenie stropu pod nieogrzewanym poddaszem (W1) Ocieplenie ścian zewnętrznych o gr.37cm (W1) Modernizacja systemu ogrzewania (W1) Wymiana okien zewnętrznych U=2,0W/m2K (W1) Budowa instalacji fotowoltaicznej Wymiana drzwi zewnętrznych (W1) Konieczność realizacji wyżej wymienionych przedsięwzięć wynika bezpośrednio z przeprowadzonych audytów energetycznych dla obu budynków objętych projektem. Projekt cechują następujące wskaźniki: 1. % wartość poprawy efektywności energetycznej: 62,7% 2. W projekcie zastosowano liczniki ciepła; 3. Audyt energetyczny budynku wskazuje na konieczność zastosowania zaworów termostatycznych i regulacyjnych; 4. % wartość redukcji emisji CO2: 57,4%; 5. % wartość obniżenia emisji pyłów (PM 10 i PM 2,5): 65,7%. (Polish)
    0 references
    The project plans to carry out two investment tasks: 1. Comprehensive energy modernisation of building 34: — Warming of the floor above the ballroom and office (W1) – Warming of the outer walls covered with sheet metal (W1) – Warming of the ceiling over the SE wing and the room’s facilities (W1) – Warming of the outer walls of 1.2 cm (W1) – Modernisation of the heating system – Modernisation of the lighting system – Warming of the ceiling over the balcony in 201 (W1) – Winding-up of the ceiling (W1) – Cooling of the ceiling over the balcony (W1). Comprehensive energy modernisation of building 50: Modernisation of the lighting system (W2) Warming of external walls of 25 cm (W1) Floor warming under unheated attic (W1) Warming of external walls by gr.37 cm (W1) Modernisation of heating system (W1) Replacement of external windows U=2.0W/m2K (W1) Construction of the photovoltaic installation Replacement of external doors (W1) The need to carry out the above-mentioned projects results directly from the energy project carried out for both buildings. The project shall be characterised by the following indicators: 1. % Energy Efficiency Improvement Value: 62.7 % 2. The design uses heat meters; 3. The building’s energy audit indicates the need for thermostatic and regulatory valves; 4. % CO2 reduction: 57,4 %; 5. % particulate emission reduction (PM 10 and PM 2,5): IT’S 65.7 %. (English)
    20 October 2020
    0 references
    Dans le cadre du projet, deux tâches d’investissement sont prévues: 1. Modernisation énergétique globale du bâtiment no 34: — Réchauffement du plafond au-dessus de la salle de bal et du bureau (W1) — Réchauffement des murs extérieurs recouverts de tôle (W1) — Réchauffement du plafond au-dessus de l’aile SE et de l’arrière du Hall (W1) — Réchauffement des murs extérieurs au g.38 cm (W1) — Modernisation du système de chauffage — Modernisation du système d’éclairage — Réchauffement du plafond au-dessus du balcon en pom.201 (W1) — Chauffage du plafond au-dessus de la pièce 114 (W1) — Remplacement des fenêtres extérieures U=2, 6 W/m2K (W1) — Remplacement des portes extérieures U=2,5W/m2K (W1) Modernisation énergétique complète du bâtiment no 50: Modernisation du système d’éclairage (W2) Réchauffement des murs extérieurs par 25 cm (W1) Réchauffement du plafond sous le grenier non chauffé (W1) Réchauffement des murs extérieurs par gr.37 cm (W1) Modernisation du système de chauffage (W1) Remplacement des fenêtres extérieures U=2,0W/m2K (W1) Construction d’une installation photovoltaïque Remplacement des portes extérieures (W1) La nécessité de mettre en œuvre les projets susmentionnés résulte directement des audits énergétiques effectués pour les deux bâtiments couverts par le projet. Le projet se caractérise par les indicateurs suivants: 1. % d’amélioration de l’efficacité énergétique: 62,7 % 2. Le projet utilise des compteurs de chaleur; 3. L’audit énergétique du bâtiment indique la nécessité de vannes thermostatiques et régulatrices; 4. % De réduction des émissions de CO2: 57,4 %; 5. % de réduction des émissions de poussières (PM 10 et PM 2.5): 65,7 %. (French)