Renewable Energy Sources in municipalities: Sokhachev, New Drawing, Fish and Teresin (Q108903)

From EU Knowledge Graph
Revision as of 17:29, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: contained in NUTS (P1845): Żyrardowski (Q2577195), Removing duplicate contained in NUTS)
Jump to navigation Jump to search
Project Q108903 in Poland
Language Label Description Also known as
English
Renewable Energy Sources in municipalities: Sokhachev, New Drawing, Fish and Teresin
Project Q108903 in Poland

    Statements

    0 references
    0 references
    0 references
    9,925,477.11 zloty
    0 references
    2,382,114.51 Euro
    13 January 2020
    0 references
    12,406,846.39 zloty
    0 references
    2,977,643.13 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    11 May 2016
    0 references
    18 December 2019
    0 references
    GMINA SOCHACZEW
    0 references

    52°9'15.5"N, 20°10'43.3"E
    0 references

    52°14'32.6"N, 20°6'12.2"E
    0 references

    52°11'57.1"N, 20°24'59.8"E
    0 references
    Realizacja projektu polega na montażu odnawialnych źródeł energii na obiektach prywatnych o raz budynkach użyteczności publicznej na terenie gmin: Sochaczew, Nowa Sucha, Rybno i Teresin. Celem głównym projektu jest efektywne wykorzystanie energii ze źródeł odnawialnych w 4 gminach: Sochaczew, Nowa Sucha Rybno i Teresin przyczyniające się do powstania infrastruktury przyjaznej środowisku. Cele projektu są związane z wykorzystaniem alternatywnych źródeł energii przez mieszkańców 4 gminy co wiąże się m.in. z poprawą jakości powietrza w regionie i poprzez to, są spójne z celami Regionalnego Programu Operacyjnego Województwa Mazowieckiego na lata 2014-2020. W wyniku realizacji projektu osiągnięte zostaną następujące rezultaty: Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE - 1 281,27 MWhe/rok, Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE - 2 478,53 MWht/rok. Szacowany roczny spadek emisji gazów cieplarnianych (CI34) - 1 243,49 [tony ekwiwalentu CO2 /rok]. Produkcja energii cieplnej z nowych mocy wytwórczych instalacji wykorzystujących OZE 2 478,53 MWht/rok. Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE 2 478,53 MWht/rok. Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE 1 281,00 MWhe/rok. Produkcja energii elektrycznej z nowych mocy wytwórczych instalacji wykorzystujących OZE 1 281,00 MWhe/rok. Produkty: Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE - 322 szt. Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE - 151 szt. Grupę docelową projektu będą mieszkańcy 4 Gmin Sochaczew, Nowa Sucha, Rybno, Teresin oraz pracownicy i użytkownicy obiektów użyteczności publicznej. (Polish)
    0 references
    The project consists of mounting renewable energy sources on private buildings, once public buildings in the communes: Sokhachev, New Duck, Fish and Teresin. The main objective of the project is the efficient use of energy from renewable sources in 4 municipalities: Sochaczew, Nowa Sucha Rybno and Teresin contribute to the creation of environmentally friendly infrastructure. The objectives of the project are related to the use of alternative energy sources by residents of 4 communes, which is connected, among other things, with the improvement of air quality in the region and, therefore, are consistent with the objectives of the Regional Operational Programme of Mazovian Voivodship for the years 2014-2020. The following results will be achieved as a result of the project: Production of electricity from newly built/new RES-based installations – 1 281,27 MWhe/year, Production of heat from newly built/new RES-based installations – 2 478,53 MWht/year. Estimated annual decrease in greenhouse gas emissions (CI34) – 1 243,49 [tonnes of CO2 equivalent/year]. Production of heat from new generation capacity of RES installations 2 478,53 MWht/year. Production of heat from newly built RES installations 2 478,53 MWht/year. Production of electricity from newly built RES installations 1 281.00 MWhe/year. Production of electricity from new generation capacities of RES installations 1 281,00 MWhe/year. Products: Number of built units of electricity generation from RES – 322 pcs. Number of built units of heat generation from RES – 151 pcs. The target group of the project will be residents of the 4 Municipalities of Sochaczew, Nowa Sucha, Rybno, Teresin and employees and users of public facilities. (English)
    17 October 2020
    0 references
    La mise en œuvre du projet consiste en l’installation de sources d’énergie renouvelables sur des bâtiments privés, une fois des bâtiments publics, sur le territoire des communes: Sochaczew, Nowa Sucha, Rybno et Teresin. L’objectif principal du projet est l’utilisation efficace de l’énergie produite à partir de sources renouvelables dans 4 municipalités: Sochaczew, Nowa Sucha Rybno et Teresin contribuent à la création d’infrastructures respectueuses de l’environnement. Les objectifs du projet sont liés à l’utilisation de sources d’énergie de substitution par les habitants de 4 municipalités, ce qui est lié, entre autres, à l’amélioration de la qualité de l’air dans la région et donc conforme aux objectifs du programme opérationnel régional pour la voïvodie de Mazowieckie 2014-2020. Grâce au projet, les résultats suivants seront atteints: Production d’électricité à partir de nouvelles capacités de production d’installations SER — 1 281,27 MWhe/an, Production de chaleur à partir de nouvelles capacités de production d’installations SER — 2 478,53 MWht/an. Réduction annuelle estimée des émissions de gaz à effet de serre (CI34) — 1 243,49 [tonnes d’équivalent CO2/an]. Production de chaleur à partir de nouvelles capacités de production d’installations SER 2 478,53 MWht/an. Production d’énergie thermique à partir d’installations nouvellement construites utilisant RES 2 478,53 MWht/an. Production d’électricité à partir d’installations SER nouvellement construites 1 281,00 MWhe/an. Production d’électricité à partir de nouvelles capacités de production d’installations SER 1 281,00 MWhe/an. Produits: Nombre d’unités de production d’électricité SER construites — 322 unités Nombre d’unités de production de chaleur SER construites — 151 unités Le groupe cible du projet sera les résidents de 4 municipalités de Sochaczew, Nowa Sucha, Rybno, Teresin et les employés et utilisateurs des bâtiments publics. (French)
    1 December 2021
    0 references

    Identifiers

    RPMA.04.01.00-14-6955/16
    0 references