Photovoltaic power plant in Przechbiorstwo Handlowowy Wojciech Łochina
Project Q104983 in Poland

    Statements

    0 references
    883,228.67 zloty
    0 references
    211,974.88 Euro
    13 January 2020
    0 references
    1,358,813.35 zloty
    0 references
    326,115.2 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 August 2018
    0 references
    30 December 2019
    0 references
    ŁOCHINA WOJCIECH, PRZEDSIĘBIORSTWO HANDLOWO-USŁUGOWE
    0 references
    0 references
    Realizacja projektu będzie polegała na budowie instalacji fotowoltaicznej o mocy 320 kW z wyłącznym wykorzystaniem wyprodukowanej energii na własne potrzeby. Projekt będzie realizowany w okresie od 01.02.2018 do 31.05.2018 r. Efektem realizacji projektu będzie instalacja dodatkowych zdolności wytwarzania energii elektrycznej ze źródeł odnawialnych o wartości 0,320 MW, 1 przedsiębiorstwo otrzyma wsparcie na budowę jednostek wytwarzania energii elektrycznej z OZE. Dzięki realizacji projektu Wnioskodawca na podstawie umowy zlecenie zatrudni pracownika do obsługi mini elektrowni. Dzięki realizacji projektu roczne koszty energii elektrycznej ponoszone przez Wnioskodawcę ulegną zmniejszeniu o około 75-80 tys. zł. Środki te będą mogły być przeznaczone na wzrost wynagrodzeń pracowników lub zwiększenie poziomu zatrudnienia w przypadku pozyskania kolejnych kontraktów handlowych. (Polish)
    0 references
    The project will consist of the construction of a photovoltaic installation with a capacity of 320 kW with the exclusive use of the produced energy for own use. The project will be implemented in the period from 01.02.2018 to 31.05.2018. The result of the project will be the installation of additional renewable electricity generation capacity of 0.320 MW, 1 the company will receive support for the construction of electricity generation units from RES. Thanks to the implementation of the project, the applicant will hire an employee to operate mini power plants on the basis of a contract. Thanks to the implementation of the project, the annual costs of electricity incurred by the Applicant will be reduced by about 75-80 thousand PLN. This appropriation could be used to raise salaries of employees or increase the level of employment in the event of subsequent commercial contracts being acquired. (English)
    17 October 2020
    0 references
    La mise en œuvre du projet consistera en la construction d’une installation photovoltaïque de 320 kW utilisant exclusivement l’énergie produite pour son propre usage. Le projet sera mis en œuvre au cours de la période allant du 01.02.2018 au 31.5.2018. Le projet aboutira à l’installation d’une capacité supplémentaire de production d’électricité renouvelable de 0,320 MW, une entreprise bénéficiera d’un soutien pour la construction d’unités de production d’électricité à partir de sources d’énergie renouvelables. Grâce à la mise en œuvre du projet, la requérante engagera, sur la base d’un contrat, un employé pour exploiter une mini centrale électrique. Grâce à la mise en œuvre du projet, les coûts annuels de l’électricité supportés par la requérante diminueront d’environ 75 à 80 000 PLN. Ce crédit peut être utilisé pour augmenter la rémunération des salariés ou pour augmenter le niveau du personnel en cas de nouveaux contrats commerciaux. (French)
    1 December 2021
    0 references
    Die Umsetzung des Projekts wird in der Errichtung einer 320 kW Photovoltaikanlage mit ausschließlicher Nutzung der für den Eigenverbrauch erzeugten Energie bestehen. Das Projekt wird in der Zeit vom 01.02.2018 bis zum 31.05.2018 umgesetzt. Das Projekt wird zur Installation zusätzlicher erneuerbarer Stromerzeugungskapazitäten von 0,320 MW führen, 1 Unternehmen erhält Unterstützung für den Bau von Stromerzeugungsanlagen aus erneuerbaren Quellen. Dank der Umsetzung des Projekts wird die Klägerin auf der Grundlage eines Vertrags einen Mitarbeiter für den Betrieb eines Minikraftwerks einstellen. Dank der Durchführung des Projekts werden die jährlichen Stromkosten der Klägerin um etwa 75-80 Tsd. PLN sinken. Diese Mittel können zur Erhöhung der Dienstbezüge der Arbeitnehmer oder zur Erhöhung des Personalbestands bei weiteren Handelsverträgen verwendet werden. (German)
    7 December 2021
    0 references

    Identifiers

    RPLU.04.02.00-06-0227/17