Renewable energy in the company W9 Investment s.c. – photovoltaic micro-installations (Q104870)

From EU Knowledge Graph
Revision as of 09:12, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet est conforme aux objectifs de la mesure 4.2 Production d’énergie SER dans les entreprises, axe prioritaire IV. Énergie respectueuse de l’environnement pour le ROP WL 2014-2020 et concerne la construction d’installations de production d’électricité à partir de sources renouvelables (construction d’une nouvelle installation SER d’unités 7 d’une capacité de 0,0397 MW chacune et la production nette moyenne prévue d’électricité pendant la d...)
Jump to navigation Jump to search
Project Q104870 in Poland
Language Label Description Also known as
English
Renewable energy in the company W9 Investment s.c. – photovoltaic micro-installations
Project Q104870 in Poland

    Statements

    0 references
    779,211.16 zloty
    0 references
    187,010.68 Euro
    13 January 2020
    0 references
    1,198,786.4 zloty
    0 references
    287,708.74 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    2 January 2018
    0 references
    30 June 2019
    0 references
    W9 INVESTMENT S.C., J. URBAN,D. PIĄTEK
    0 references
    0 references
    Projekt wpisuje się w cele działania 4.2 Produkcja energii OZE w przedsiębiorstwach, Osi Priorytetowej IV. Energia przyjazna środowisku RPO WL 2014-2020 i dotyczy budowy instalacji do produkcji energii elektrycznej ze źródeł odnawialnych (budowa nowej instalacji OZE sztuk 7 o mocy 0,0397 MW każda i planowanej średniej produkcji netto energii elektrycznej w okresie trwałości projektu poniżej 400 MWh/rok). Cele projektu zbieżne z celami strategicznymi województwa oraz gospodarki niskoemisyjnej przez: m.in. zwiększenie udziału OZE w wytwarzaniu energii elektrycznej (dodatkowe moce wytwórcze), poprawa jakości powietrza przez zastąpienie poboru e.e. z sieci pochodzącej ze źródeł konwencjonalnych- energią ze źródeł odnawialnych (redukcja emisji CO2 i pyłów w tym PM10), podniesienie świadomości ekologicznej innych mieszkańców regionu (edukacja ekologiczna). Zakres rzeczowy projektu dotyczy budowy instalacji OZE (sztuk 7) o mocy 0,0397 MW każda (wykonanie robót budowlanych polegających na montażu urządzeń fotowoltaicznych o mocy do 40 kW) wraz z systemem monitoringu pracy przy wykorzystaniu TIK. Ogólna moc zainstalowana w projekcie wyniesie 0,278 MW. Z rodzaju instalacji w projekcie oraz średniego czasu pracy instalacji PV w roku i sprawności urządzeń po uwzględnieniu ubytków i strat wynika produkcja roczna energii elektrycznej netto ogółem w projekcie (264,33 MWh/rok). Cel w projekcie wyrażają mierzalne wskaźniki produktu i rezultatu (określone w sekcji VI wniosku). Grupa docelowa i użytkownik wytworzonej infrastruktury to przedsiębiorstwo Wnioskodawcy (energia z instalacji przeznaczona na potrzeby własne). Wartość netto projektu 1212331,40 zł (brutto 1491167,62 zł), wydatki kwalifikowane 1198786,40 zł (pomoc publiczna art. 41 ust 6 lit c GBER). Technologia w projekcie, rodzaj źródła odnawialnego - energia promieniowania słonecznego. Nowa instalacja. Projekt jest w pełni zgodny z zapisami SZOOP woj. Lubelskiego i regulaminem konkursu. (Polish)
    0 references
    The project fits into the objectives of action 4.2 Production of RES energy in enterprises, Priority Axis IV. Environmentally friendly energy RPO WL 2014-2020 and relates to the construction of installations for the production of electricity from renewable sources (construction of a new RES installation of units 7 with a capacity of 0,0397 MWW each and the planned average net production of electricity during the project’s lifetime of less than 400 MWh/year). Project objectives converging with the strategic objectives of the voivodship and the low-carbon economy by: among others, increasing the share of RES in electricity generation (additional generation capacity), improving air quality by replacing e.e. consumption from conventional sources- renewable energy (reduction of CO2 and particulate emissions including PM10), raising the environmental awareness of other inhabitants of the region (green education). The material scope of the project concerns the construction of RES installations (pieces 7) with a capacity of 0.0397 MW each (execution of construction works consisting of installation of photovoltaic devices up to 40 kW) together with a system for monitoring work using ICT. The overall installed capacity of the project will be 0.278 MW. The type of installation in the project and the average working time of PV installations per year and the efficiency of the equipment after taking account of losses and losses result from the net annual production of total electricity in the project (264.33 MWh/year). The objective in the project shall be expressed by measurable output and result indicators (as defined in Section VI of the proposal). Target group and user of the built infrastructure is the Applicant’s enterprise (energy from installations dedicated to own needs). Net value of the project PLN 1212331.40 (gross PLN 1491167.62), eligible expenditure PLN 1198786.40 (public aid Art. 41 par. 6(c) of the GBER). Technology in the project, type of renewable source – solar energy. It’s a new installation. The project is fully compliant with the provisions of the SZOOP voivodship. Lubelski and the rules of the competition. (English)
    17 October 2020
    0 references
    Le projet est conforme aux objectifs de la mesure 4.2 Production d’énergie SER dans les entreprises, axe prioritaire IV. Énergie respectueuse de l’environnement pour le ROP WL 2014-2020 et concerne la construction d’installations de production d’électricité à partir de sources renouvelables (construction d’une nouvelle installation SER d’unités 7 d’une capacité de 0,0397 MW chacune et la production nette moyenne prévue d’électricité pendant la durée du projet de moins de 400 MWh/an). Objectifs du projet conformes aux objectifs stratégiques de la voïvodie et de l’économie sobre en carbone: entre autres, l’augmentation de la part des SER dans la production d’électricité (capacité de production supplémentaire), l’amélioration de la qualité de l’air en remplaçant la consommation de sources d’énergie conventionnelles (réduction des émissions de CO2 et de poussières, y compris les PM10), et la sensibilisation des autres habitants de la région à l’environnement (éducation environnementale). Le champ d’application matériel du projet concerne la construction d’une installation SER (article 7) d’une capacité de 0,0397 MW chacune (l’exécution de travaux de construction consistant en l’installation de dispositifs photovoltaïques jusqu’à 40 kW) ainsi qu’un système de surveillance des travaux utilisant les TIC. La capacité totale installée du projet sera de 0,278 MW. Le type d’installation dans le projet et le temps de travail moyen de l’installation photovoltaïque au cours de l’année et l’efficacité de l’équipement après prise en compte des pertes et pertes entraînent la production annuelle nette d’électricité dans le projet (264,33 MWh/an). L’objectif du projet est exprimé par des indicateurs de réalisation et de résultat mesurables (tels que définis à la section VI de la proposition). Le groupe cible et l’utilisateur de l’infrastructure produite sont l’entreprise de la requérante (énergie provenant de l’installation destinée à un usage propre). Valeur nette du projet 1212331,40 PLN (brut 1491167,62 PLN), dépenses éligibles 1198786,40 PLN (aide d’État article 41, paragraphe 6, point c), RGEC). Technologie dans le projet, type de source renouvelable — énergie solaire. Une nouvelle installation. Le projet est pleinement conforme aux dispositions de la voïvodie SZOOP. Lubelski et les règles du concours. (French)
    1 December 2021
    0 references

    Identifiers

    RPLU.04.02.00-06-0059/17
    0 references