CONSTRUCTION OF UL. NEW CARBON IN A BOAT ON ODC. FROM THE HIVE. WIERZBOWA TO UL. KOCCIŃSKIEGO ALONG WITH THE EXTENSION OF THE INTERSECTION WITH UL. KOPCINSKI (Q101716)

From EU Knowledge Graph
Revision as of 08:28, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’INVESTISSEMENT COMPREND M.IN.: CONSTRUCTION DE TROTTOIRS DE RUE NOVO-CARBIDE POUR LA QUID. DE UL.WIERZBOVA À UL.KOPCI’SKI, EXTENSION DE L’INTERSECTION DE UL. NOVOCARBON DE UL.KOPCI’SKI (CONNEXION DE DEUXIÈME NIVEAU), OBEJMUJĄCA:BUDOWĘ CONNEXION, CONSTRUCTION D’UN CONNECTEUR, RECONSTRUCTION D’UL. PUBLICATION, QUI EST L’INTERSECTION SUD, RECONSTRUCTION DE L’UL.TUWIMA, Y COMPRIS UN CHANGEMENT DE CAP DANS LE VOISINAGE DE LA BOUCLE D’AUTOBUS, RECON...)
Jump to navigation Jump to search
Project Q101716 in Poland
Language Label Description Also known as
English
CONSTRUCTION OF UL. NEW CARBON IN A BOAT ON ODC. FROM THE HIVE. WIERZBOWA TO UL. KOCCIŃSKIEGO ALONG WITH THE EXTENSION OF THE INTERSECTION WITH UL. KOPCINSKI
Project Q101716 in Poland

    Statements

    0 references
    12,383,864.23 zloty
    0 references
    2,972,127.42 Euro
    13 January 2020
    0 references
    14,569,252.04 zloty
    0 references
    3,496,620.49 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 November 2014
    0 references
    30 June 2019
    0 references
    MIASTO ŁÓDŹ
    0 references
    0 references

    51°46'23.2"N, 19°28'42.2"E
    0 references
    INWESTYCJA OBEJMUJE M.IN.: BUDOWA NAWIERZCHNI UL. NOWOWĘGLOWEJ NA ODC. OD UL.WIERZBOWEJ DO UL.KOPCIŃSKIEGO, ROZBUDOWA SKRZYŻOWANIA UL. NOWOWĘGLOWEJ Z UL.KOPCIŃSKIEGO (SKRZYŻOWANIE 2 POZIOMOWE), OBEJMUJĄCA:BUDOWĘ ŁĄCZNICY PÓŁNOCNEJ,BUDOWĘ ŁĄCZNIKA,PRZEBUDOWĘ UL. WYDAWNICZEJ, STANOWIĄCEJ ŁĄCZNICE POŁUDNIOWĄ SKRZYŻOWANIA,PRZEBUDOWĘ UL.TUWIMA, W TYM ZMIANĘ JEJ PRZEBIEGU W SĄSIEDZTWIE PĘTLI AUTOBUSOWEJ, PRZEBUDOWĘ PĘTLI AUTOBUSOWEJ. W RAMACH WW ODCINKÓW ZREALIZOWANE ZOSTANĄ M.IN. NASTĘPUJĄCE RODZAJE ROBÓT: WYKONANIE NOWYCH NAWIERZCHNI JEZDNI Z MIESZANEK MINERALNO-ASFALTOWYCH WYKONANIE PRZEBUDOWY ISTNIEJĄCYCH NAWIERZCHNI MONTAŻ OBRAMOWAŃ JEZDNI, CHODNIKÓW, ŚCIEŻEK ROWEROWYCH, OPASEK, ZJAZDÓW, ZATOK WYKONANIE NAWIERZCHNI ZJAZDÓW INDYWIDUALNYCH WYKONANIE NAWIERZCHNI ZJAZDÓW PUBLICZNYCH WYKONANIE NAWIERZCHNI CHODNIKÓW Z PŁYTEK BETONOWYCH I KOSTKI KAMIENNEJ WYKONANIE NAWIERZCHNI ŚCIEŻEK ROWEROWYCH I CIĄGÓW PIESZO-ROWEROWYCH WYKONANIE OPASEK JEZDNI WYKONANIE ZATOK / STANOWISK AUTOBUSOWYCH WYKONANIE NAWIERZCHNI PARKINGU Z KOSTKI BETONOWEJ / MIESZANKI MINERALNO-ASFALTOWEJ MONTAŻ NAWIERZCHNI SYGNALIZACYJNYCH DLA OSÓB NIEDOWIDZĄCYCH MONTAŻ BARIER, WYGRODZEŃ I OGRODZEŃ BUDOWA SIECI KANALIZACJI DESZCZOWEJ PRZEBUDOWA SIECI WODOCIĄGOWEJ I GAZOWEJ BUDOWA OŚWIETLENIA ULICZNEGO BUDOWA SYGNALIZACJI ŚWIETLNEJ WRAZ Z ZASILANIEM NASADZENIA ZIELENI WZDŁUŻ PASA DROGOWEGO NOWO PROJEKTOWANEJ UL. NOWOWEGLOWEJ ORAZ PRZEBUDOWYWANYCH ULIC TUWIMA, WYDAWNICZEJ ORAZ ŁĄCZNIKA KOPCIŃSKIEGO – WYDAWNICZA. GRUPY DOCELOWE: UŻYTKOWNICY INFRASTRUKTURY DROGOWEJ ZADANIA: 1) PROJEKT 2) ROBOTY BUDOWLANE 3) INŻYNIER KONTRAKTU 4) INFORMACJA I PROMOCJA 5) WYKUP GRUNTÓW CEL PODSTAWOWY:LEPSZA DOSTĘPNOŚĆ TRANSPORTOWA WOJEWÓDZTWA W RUCHU DROGOWYM, ZAPEWNIENIE BEZPOŚREDNIEGO POŁĄCZENIA DROGOWEGO DO DWORCA ŁÓDŹ FABRYCZNA BĘDĄCEGO ELEMENTEM PUNKTOWYM SIECI TEN-T, POPRAWA BEZPIECZEŃSTWA, JAKOŚCI SIECI DROGOWEJ I JEJ PRZEPUSTOWOŚCI. (Polish)
    0 references
    THE INVESTMENT INCLUDES M.IN.: CONSTRUCTION OF THE PAVEMENT UL. IT’S NEW CARBON ON F.C. FROM UL.WIERZBOWEJ TO UL.KOPCIŃSKI, EXTENSION OF THE INTERSECTION OF UL. NOWOWĘGLOWA FROM UL.KOPCIŃSKI (2 LEVEL CROSSROADS), INCLUDING: CONSTRUCTION OF THE NORTHERN LINK, CONSTRUCTION OF A CONNECTOR, REFURBISHMENT OF UL. PUBLISHING, WHICH IS A LINKAGE OF THE SOUTHERN INTERSECTION, THE REFURBISHMENT OF UL.TUWIMA, INCLUDING CHANGING ITS COURSE IN THE VICINITY OF THE BUS LOOP, RECONSTRUCTION OF THE BUS LOOP. AS PART OF THESE EPISODES, M.IN WILL BE IMPLEMENTED. THE FOLLOWING TYPES OF WORK: CONSTRUCTION OF NEW ROAD SURFACES OF ROADWAYS WITH MINERAL-ASPHALT MIXTURES EXECUTION OF RECONSTRUCTION OF EXISTING PAVEMENTS ASSEMBLY OF ROAD BORDERS, PAVEMENTS, BICYCLE PATHS, BELTS, SLIDES, SINUSES EXECUTION OF THE PAVEMENTS OF THE INDIVIDUAL PAVEMENT OF THE PUBLIC ROADWAYS CONSTRUCTION OF THE CONSTRUCTION OF THE PAVEMENTS OF THE PAVEMENT OF THE GROUND AND THE CONSTRUCTION OF THE STONY STONES, MAKING THE PAVEMENT OF BICYCLE PATHS AND CYCLES ON FOOT. NEW AND RECONSTRUCTED TUWIMA STREETS, PUBLISHING HOUSES AND KOPCIŃSKIEGO CONNECTOR – PUBLISHING HOUSE. TARGET GROUPS: USERS OF ROAD INFRASTRUCTURE TASK: 1) PROJECT 2) CONSTRUCTION WORKS 3) CONTRACT ENGINEER 4) INFORMATION AND PROMOTION 5) LAND PURCHASE BASIC OBJECTIVE:IMPROVED TRANSPORT ACCESSIBILITY OF THE VOIVODSHIP IN ROAD TRAFFIC, PROVISION OF DIRECT ROAD CONNECTION TO THE STATION ŁÓDŹ FABRYCZNA WHICH IS A POINT ELEMENT OF THE TEN-T NETWORK, IMPROVEMENT OF SAFETY, QUALITY OF THE ROAD NETWORK AND ITS CAPACITY. (English)
    17 October 2020
    0 references
    L’INVESTISSEMENT COMPREND M.IN.: CONSTRUCTION DE TROTTOIRS DE RUE NOVO-CARBIDE POUR LA QUID. DE UL.WIERZBOVA À UL.KOPCI’SKI, EXTENSION DE L’INTERSECTION DE UL. NOVOCARBON DE UL.KOPCI’SKI (CONNEXION DE DEUXIÈME NIVEAU), OBEJMUJĄCA:BUDOWĘ CONNEXION, CONSTRUCTION D’UN CONNECTEUR, RECONSTRUCTION D’UL. PUBLICATION, QUI EST L’INTERSECTION SUD, RECONSTRUCTION DE L’UL.TUWIMA, Y COMPRIS UN CHANGEMENT DE CAP DANS LE VOISINAGE DE LA BOUCLE D’AUTOBUS, RECONSTRUCTION DE LA BOUCLE D’AUTOBUS. DANS CES SECTIONS, M.IN SERA MIS EN ŒUVRE. LES TYPES D’OUVRAGES SUIVANTS: CONSTRUCTION DE NOUVELLES SURFACES DE ROUTES À PARTIR DE MÉLANGES MINÉRAUX ET ASPHALTÉS RECONSTRUCTION DE TROTTOIRS EXISTANTS INSTALLATION DE TROTTOIRS, TROTTOIRS, PISTES CYCLABLES, TRAVERSES, DESCENTES, BAIES EXÉCUTION DE LA SURFACE DES SORTIES INDIVIDUELLES. NOWOWEGLOVAJ ET LES RUES RECONSTRUITES TUWIMA, L’ÉDITION ET LE KOPCI’SKI — LIEN D’ÉDITION. GROUPES CIBLES: TÂCHES DES USAGERS DE L’INFRASTRUCTURE ROUTIÈRE: 1) CONCEPTION 2) TRAVAUX DE CONSTRUCTION 3) INGÉNIEUR CONTRACTUEL 4) INFORMATION ET PROMOTION 5) OBJECTIF D’ACHAT DE TERRAINS: L’ACCESSIBILITÉ DES TRANSPORTS DE LA PROVINCE DANS LA CIRCULATION ROUTIÈRE, FOURNISSANT UNE CONNEXION ROUTIÈRE DIRECTE AU BATEAU-USINE DE LA GARE ÉTANT UN ÉLÉMENT POINTU DU RÉSEAU DE DIX T, L’AMÉLIORATION DE LA SÉCURITÉ, LA QUALITÉ DU RÉSEAU ROUTIER ET SA CAPACITÉ. (French)
    1 December 2021
    0 references

    Identifiers

    RPLD.03.02.02-10-0018/15
    0 references