Construction of a pressing sanitary collector from the Gostycyn commune to the sewage system of the City and Tuchola commune implemented in two stages (Q98438)

From EU Knowledge Graph
Revision as of 07:06, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet en question est un investissement linéaire consistant en la construction d’un système d’assainissement sanitaire pour la station de captage des eaux usées de Gostycin et l’interception des eaux usées de la station de pompage des eaux usées existante de Łysków via la ligne de rejet (Gostycin — Tuchola). La longueur totale du réseau à créer dans le cadre du projet est de 13 km. Le collecteur de décharges passera de la station centrale de...)
Jump to navigation Jump to search
Project Q98438 in Poland
Language Label Description Also known as
English
Construction of a pressing sanitary collector from the Gostycyn commune to the sewage system of the City and Tuchola commune implemented in two stages
Project Q98438 in Poland

    Statements

    0 references
    2,133,024.82 zloty
    0 references
    511,925.96 Euro
    13 January 2020
    0 references
    2,509,440.97 zloty
    0 references
    602,265.83 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 August 2015
    0 references
    31 December 2016
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWO-HANDLOWE "KAMIONKA" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Przedmiotowy projekt to inwestycja liniowa polegająca na budowie kanalizacji sanitarnej tłocznej zlewni oczyszczalni ścieków w Gostycynie z przechwyceniem po drodze przewodu tłocznego (Gostycyn – Tuchola) ścieków z istniejącej przepompowni ścieków w Łyskowie. Łączna długość sieci, jaka powstanie wramach projektu to 13 km. Kolektor tłoczny przebiegać będzie od centralnej przepompowni ścieków, zlokalizowanej na terenie przewidzianej do likwidacji oczyszczalni w Gostycynie do kolektora sanitarnego w Tucholi, przebiegającego na południowym skraju miasta, po północno - wschodniej stronie rzeki Kicz, w kierunku komunalnej oczyszczalni ścieków. Na odcinku od Gostycyna do Łyskowa trasę kolektora wytyczono wzdłuż prawej strony drogi wojewódzkiej. Kolektor sanitarny na trasie z Łyskowa do granicy administracyjnej miasta Tuchola przebiegać będzie od miejsca lokalizacji istniejącej przepompowni ścieków w Łyskowie, w pasie dróg gminnych i dróg leśnych do ul. Wańkowicza w Tucholi i następnie po przejściu syfonem pod korytem rzeki Kicz zostanie podłączony do kolektora sanitarnego. Projektowana sieć kanalizacyjna wykorzystana zostanie w celu polepszenia warunków socjalno-bytowych oraz umożliwi częściową lub całkowitą likwidację oczyszczalni ścieków w Gostycynie. W ramach zadania zostanie zlikwidowana część biologicznej oczyszczalni ścieków. W celu umożliwienia dostarczenia ścieków dowożonych z nieskanalizowanych zagród gospodarskich oraz oddzielenia piasku z części ogólnospławnej w miejscowości Gostycyn zachowana zostanie część mechaniczna oczyszczalni, poprzez pozostawienie punktu zlewnego oraz piaskownika do czasu całkowitego wyeliminowania dopływu ścieków ogólnospławnych. Na terenie oczyszczalni zaprojektowano również pozostawienie jednego rowu biologicznego i zaadaptowanie go jako czasowy zbiornik ścieków w wypadku awarii kolektora tłocznego do oczyszczalni ścieków w Tucholi. Zbiornik ten będzie wykorzystywany tylko na okres usunięcia awarii. (Polish)
    0 references
    This project is a linear investment consisting of the construction of sanitary sewage drainage system of the sewage treatment plant in Gostycin with interception of discharge pipes (Gosticin – Tuchola) of sewage from the existing sewage pumping plant in Łysków. The total length of the network that will be created within the project is 13 km. The exhaust manifold will run from the central sewage pumping plant, located in the area planned to liquidate the treatment plant in Gostycin to the sanitary manifold in Tuchola, running on the southern edge of the city, on the north-eastern side of the river Kicz, towards the municipal sewage treatment plant. On the section from Gostycin to Łysków the collector route was marked along the right side of the provincial road. The sanitary collector on the route from Łysków to the administrative border of the town of Tuchola will run from the location of the existing sewage pumping plant in Łysków, in the zone of municipal roads and forest roads to ul. Wańkowicza in Tuchola and then after passing by siphon under the river Kicz river will be connected to the sanitary manifold. The designed sewerage network will be used to improve social and domestic conditions and will allow partial or complete decommissioning of the waste water treatment plant in Gostycin. Part of the biological waste water treatment plant will be eliminated as part of the task. In order to allow the delivery of sewage from unscanised farmsteads and the separation of sand from the general part of Gostycin, the mechanical part of the treatment plant will be preserved, by leaving the catchment point and sandstone until the total drainage supply is eliminated. The treatment plant also designed to leave one biological ditch and adapt it as a temporary waste water tank in the event of a failure of the pressure manifold for the sewage treatment plant in Tuchola. This tank will only be used for the period of removal of the failure. (English)
    15 October 2020
    0 references
    Le projet en question est un investissement linéaire consistant en la construction d’un système d’assainissement sanitaire pour la station de captage des eaux usées de Gostycin et l’interception des eaux usées de la station de pompage des eaux usées existante de Łysków via la ligne de rejet (Gostycin — Tuchola). La longueur totale du réseau à créer dans le cadre du projet est de 13 km. Le collecteur de décharges passera de la station centrale de pompage des eaux usées, située sur le site prévu pour le déclassement de la station d’épuration de la Gostycin, au collecteur sanitaire de Tuchola, qui s’étend sur la limite sud de la ville, du côté nord-est de la rivière Kicz, vers la station municipale d’épuration des eaux usées. Sur la section de Gostycin à Łyskowa, la route de collecte a été tracée le long du côté droit de la route provinciale. Le collecteur sanitaire le long de la route allant de Łyskowa à la frontière administrative de Tuchola partira de l’emplacement de la station de pompage des eaux usées existante à Łysków, sur la voie des routes municipales et des routes forestières jusqu’à ul. Wańkowicza à Tuchola puis après avoir passé le siphon sous la rivière Kicz sera relié au collecteur sanitaire. Le réseau d’assainissement prévu sera utilisé pour améliorer les conditions sociales et non résidentielles et permettre le déclassement partiel ou complet de la station d’épuration des eaux usées de Gostycin. Une partie de la station d’épuration biologique des eaux usées sera éliminée dans le cadre de cette tâche. La partie mécanique de la station d’épuration sera maintenue afin de permettre l’acheminement des eaux usées des fermes non traitées et la séparation du sable de la partie générale de Gostycyn, en sortant du point de captage de l’eau et du bac à sable jusqu’à ce que le rejet total des eaux usées soit éliminé. Sur le site de la station d’épuration, il a également été conçu pour laisser un fossé biologique et l’adapter en tant que réservoir d’eaux usées temporaire en cas de défaillance du collecteur de décharge à la station d’épuration de Tuchola. Ce réservoir ne sera utilisé que pour la période de réparation de la défaillance. (French)
    1 December 2021
    0 references

    Identifiers

    RPKP.04.03.00-04-0003/16
    0 references