Thermal modernisation of public utility facilities in the municipality of Lisewo (Q98181)

From EU Knowledge Graph
Revision as of 06:52, 1 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objet du projet est la thermomodernisation de 4 bâtiments publics dans la municipalité de Lisewo (bâtiment multifonctionnel à Lisevo, St. rural à Bartlewo, St. rural à Mgoszcz et le bâtiment. Le GRT de Lisevo). Les bâtiments ont été mis en service à la fin des années 1970 et 1990. Ils ne sont pas isolés, et une partie importante de la menuiserie de fenêtre et de porte nécessite un remplacement. À Lisewo, il y a un faible niveau de développemen...)
Jump to navigation Jump to search
Project Q98181 in Poland
Language Label Description Also known as
English
Thermal modernisation of public utility facilities in the municipality of Lisewo
Project Q98181 in Poland

    Statements

    0 references
    1,143,945.85 zloty
    0 references
    274,547.00 Euro
    13 January 2020
    0 references
    1,401,228.72 zloty
    0 references
    336,294.89 Euro
    13 January 2020
    0 references
    81.64 percent
    0 references
    1 September 2017
    0 references
    30 November 2019
    0 references
    GMINA LISEWO
    0 references
    Q2520069 (Deleted Item)
    0 references
    Przedmiotem projektu jest termomodernizacja 4 obiektów użyteczności publicznej w gminie Lisewo(pawilon wielofunkcyjny w Lisewie, św. wiejska w Bartlewie, św. wiejska w Mgoszczu i bud. OSP w Lisewie). Budynki zostały oddane do użytku na przełomie lat 70-tych i 90-tych. Nie są ocieplone zew., a znaczna część stolarki okiennej i drzwiowej wymaga wymiany. W gm. Lisewo występuje niski poziom rozwoju OZE oraz zbyt wysokie zapotrzebowanie na energię bud. użyteczności pub. Celem projektu jest zwiększenie efektywności energetycznej obiektów w gm. Lisewo w okresie od 1 marca 2018 do 30 czerwca 2019 roku. Dzięki realizacji projektu nastąpi poprawa w infrastrukturze bud. użyteczności pub. w zakresie termomodernizacji. Przełoży się to bezpośrednio na poprawę jakości powietrza atmosferycznego oraz na zmniejszenie kosztów utrzymania bud. W ramach projektu zaplanowano przeprowadzenie prac przygotowawczych polegających na pozyskaniu niezbędnych pozwoleń i decyzji administracyjnych, opracowaniu dokumentacji tech., wybór wykonawców oraz przeprowadzenie właściwych robót bud., zarządzanie projektem i promocję przedsięwzięcia. Wsk. produktu: -Liczba zmodernizowanych energet. bud. – 4 szt.-Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE- 2 szt.-Powierzchnia użytkowa bud. poddanych termomodernizacji- 1 985,31 m2.Wsk. rezultatu: -Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzyst. OZE- 463,71 MWh/rok.-Il. zaoszczędzonej energii cieplnej- 2 185,75 GJ/rok.-Zmniej. rocznego zużycia energii pierwotnej w budynkach pub.- 1 338 548,903 kWh/rok.-Szacowany roczny spadek emisji gazów ciep.- 558,68 tony równoważnika CO2.Termin realizacji projektu od od 1 marca 2018 do 30 czerwca 2019 roku. Całkowite nakłady inwestycyjne projektu wynoszą łącznie 1 470 779,17 brutto, koszty kwalifikowalne 1 401 228,72 z czego 1 195 755,43 stanowi kwotę netto, a 275 023,74 podatek od towarów i usług VAT. Do kosztów kwalifikowalnych inwestycji został zaliczony podatek VAT. (Polish)
    0 references
    The subject of the project is the modernisation of 4 public utility facilities in the commune of Lisewo (multifunctional pavilion in Lisewo, St. OSP in Lisewa). The buildings were commissioned in the late 70s and early 90s. They are not warmed, and much of the window and door carpentry requires replacement. In Lisewo there is a low level of RES development and too high demand for energy building. utility pub. The aim of the project is to increase the energy efficiency of buildings in Lisewo in the period from 1 March 2018 to 30 June 2019. Thanks to the implementation of the project there will be an improvement in the infrastructure building. utility pub. in the field of thermomodernisation. This will translate directly into improving ambient air quality and reducing the cost of building maintenance. The project planned to carry out preparatory works consisting of obtaining the necessary administrative permits and decisions, developing technical documentation, selecting contractors and carrying out appropriate construction works, project management and promotion of the project. Product Specification: —Number of modernised energet. bud. — 4 units-Number of built units of thermal energy production from RES- 2 pcs-Used surface of buildings undergoing thermo-modernisation- 1985,31 m². —Production of thermal energy from newly built installations. RES-463.71 MWh/year.-How many thermal energy savings- 2 185.75 GJ/year.-Reduced annual primary energy consumption in pub buildings.- 1338548,903 kWh/year.- Estimated annual decrease in heat gas emissions.- 558.68 tonnes CO2 equivalent. The total investment outlays of the project amount to a total of 1 470 779.17 gross, the eligible costs 1 401 228,72 of which 1 195 755.43 is the net amount and 275 023,74 VAT on goods and services. VAT was included in the eligible investment costs. (English)
    15 October 2020
    0 references
    L’objet du projet est la thermomodernisation de 4 bâtiments publics dans la municipalité de Lisewo (bâtiment multifonctionnel à Lisevo, St. rural à Bartlewo, St. rural à Mgoszcz et le bâtiment. Le GRT de Lisevo). Les bâtiments ont été mis en service à la fin des années 1970 et 1990. Ils ne sont pas isolés, et une partie importante de la menuiserie de fenêtre et de porte nécessite un remplacement. À Lisewo, il y a un faible niveau de développement des SER et une demande d’énergie trop élevée pour les services publics de construction. L’objectif du projet est d’accroître l’efficacité énergétique des bâtiments de Lisewo au cours de la période allant du 1er mars 2018 au 30 juin 2019. Grâce à la mise en œuvre du projet, il y aura une amélioration de l’infrastructure de la construction de pub utilitaire dans le domaine de la thermomodernisation. Cela se traduira directement par une amélioration de la qualité de l’air ambiant et une réduction des coûts d’entretien des bâtiments. Le projet prévoyait la réalisation de travaux préparatoires consistant à obtenir les autorisations et les décisions administratives nécessaires, à rédiger la documentation technique, à sélectionner les contractants et à réaliser les travaux de construction appropriés, la gestion du projet et la promotion du projet. Index des produits: Nombre d’énerget modernisé. bourgeon. — 4 unités-Nombre d’unités construites pour la production d’énergie thermique à partir de sources d’énergie renouvelables — 2 unités- Superficie utilisable du bâtiment en thermomodernisation- 1 985,31 m².Résultat: —Production d’énergie thermique à partir d’installations nouvellement construites. Res- 463,71 MWh/an.-Il. économie d’énergie thermique- 2 185,75 GJ/an.-Réduction annuelle de la consommation d’énergie primaire dans les bâtiments des pubs- 1 338 548,903 kWh/an.-Réduction annuelle estimée des émissions de gaz à effet de serre- 558,68 tonnes d’équivalent CO2.Durée de la mise en œuvre du projet du 1er mars 2018 au 30 juin 2019. Les dépenses d’investissement totales du projet s’élèvent au total à 1 470 779,17 coûts bruts et éligibles 1 401 228,72 dont 1 195 755,43 est un montant net et 275 023,74 TVA. La TVA a été incluse dans les coûts éligibles de l’investissement. (French)
    1 December 2021
    0 references

    Identifiers

    RPKP.03.03.00-04-0023/17
    0 references