Sewage system with connections of the Cross, Różyniec, Shipping Osła – Gromadka with modernisation of the sewage treatment plant in Gromadka – stage I (Q95837)

From EU Knowledge Graph
Revision as of 23:23, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La requérante dans le projet est la municipalité de Gromadka, une JST établie pour organiser la vie de publ. sur son territoire. La municipalité a la personnalité des droits et exécute le publ. en son propre nom et responsabilité. L’objectif du projet est d’augmenter le nombre de personnes bénéficiant d’un traitement amélioré des eaux usées grâce à la construction d’un réseau d’assainissement avec connexions de Krzyżów, Różyniec, Osła avec le tr...)
Jump to navigation Jump to search
Project Q95837 in Poland
Language Label Description Also known as
English
Sewage system with connections of the Cross, Różyniec, Shipping Osła – Gromadka with modernisation of the sewage treatment plant in Gromadka – stage I
Project Q95837 in Poland

    Statements

    0 references
    8,475,010.26 zloty
    0 references
    2,034,002.46 Euro
    13 January 2020
    0 references
    9,970,600.3 zloty
    0 references
    2,392,944.07 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    24 May 2017
    0 references
    30 November 2018
    0 references
    GMINA GROMADKA
    0 references
    Wnioskodawcą w projekcie jest Gmina Gromadka, JST powołana do organizacji życia publ. na swoim terytorium. Gmina posiada osobowość praw. i wykonuje zad. publ. w imieniu własnym i na wł. odpowiedzialność. Celem gł.projektu jest zwiększenie liczby osób korzyst. z ulepszonego oczyszczania ścieków poprzez budowę sieci kanalizacji sanitarnej z przyłączami Krzyżowa, Różyniec, Osła z przesyłem Osła - Gromadka wraz z modernizacją oczyszczalni ścieków w Gromadce – etap I. Realizacja celu nastąpi poprzez wyk. zadań w ramach projektu: Zadanie 1: Budowa sieci kanalizacji sanitarnej i modernizacja oczyszczalni ścieków Działanie 1: Rozbudowa i modernizacja oczyszczalni ścieków BIOCOMP w Gromadce W związku ze złym stanem tech. istniej. obiektu oraz niewielką przepustowością, planuje się przystosować inst. do zwiększonej ilości ścieków zgodnie z KPOŚK. Planowane prace dot. budowy: stacji zlewczej, studzienki, tłoczni, komory rozdziału, komory beztl, reaktora biol, pompowni osadu, komory pomiarowej osadu recyrk.oraz studzienki pom. ściek. ocz., studzienek kan., biofiltra, systemu sterowania i kontroli dla całej oczyszczalni. Działanie 2: Budowa rurociągu przesyłowego Osła-Gromadka Budowa rurociągu tłocznego mającego za zad. przesył ścieków z plan. do budowy sieci kan. sanit. w m. Osła do istniejącego systemu w m. Gromadka. W zakr. wchodzi również budowa przepompowni ścieków oraz odcinek sieci grawit. Działanie 3: Rozbudowa sieci kanalizacji sanitarnej z przyłączami: Różyniec, Osła Planuje się budowę kan.grawit.z elementami tłocznej. Łączna dł. rurociągu razem z przyłączami planowana do bud. - 23,19 km, przyłącza - 5,08km, dł. kanalizacji bez przyłączy - 18,1 km. Działanie 4: Nadzór inwestorski Działanie 5: Zarządzanie projektem Zadanie 2: Działania promocyjne (Polish)
    0 references
    The applicant in the project is the Municipality of Gromadka, JST appointed to organise publ life on its territory. The municipality has a legal personality and performs publ. on its own behalf and on its own responsibility. The aim of the project is to increase the number of people benefiting from improved sewage treatment through the construction of a sanitary sewage system with the connections of Krzyżów, Różyniec, Osła – Gromadka transport, along with modernisation of the sewage treatment plant in Gromadka – stage I. Task 1: Construction of sanitary sewage system and modernisation of sewage treatment plants Action 1: Expansion and modernisation of the BIOCOMP waste water treatment plant in Gromadka Due to the poor state of the technology, there is a low capacity of the facility, it is planned to adapt the inst. to the increased amount of sewage according to the CPOŚK. Planned construction works: sinking stations, wells, pressing plants, partition chambers, arbitrary chambers, biol reactor, sludge pumping room, recyrk. sediment measuring chamber, and sewage wells, sewer well, biofilter, control and control system for the entire treatment plant. Action 2: Construction of a transport pipeline Osła-Gromadka Construction of a press pipeline with sewage transport from the plan for construction of a sanitary network in m. The Dodge to the existing system in Gromadka. The construction of a sewage pumping station and a section of gravitational nets are also included in the corner. Action 3: Extension of sanitary sewage system with connections: Różyniec, Osła The construction of can.gravit.with pressing elements is planned. The total length of the pipeline with the connections planned for the building. — 23.19 km, connections – 5.08 km, length of sewage without connection – 18.1 km. Action 4: Investor supervision Action 5: Project management Task 2: Promotion activities (English)
    15 October 2020
    0 references
    La requérante dans le projet est la municipalité de Gromadka, une JST établie pour organiser la vie de publ. sur son territoire. La municipalité a la personnalité des droits et exécute le publ. en son propre nom et responsabilité. L’objectif du projet est d’augmenter le nombre de personnes bénéficiant d’un traitement amélioré des eaux usées grâce à la construction d’un réseau d’assainissement avec connexions de Krzyżów, Różyniec, Osła avec le transport d’Osła — Gromadka ainsi que la modernisation de la station d’épuration des eaux usées à Gromadka — phase I. L’objectif sera atteint par l’achèvement des tâches dans le cadre du projet: Activité 1: Construction d’un réseau d’assainissement sanitaire et modernisation d’une station d’épuration des eaux usées Action 1: Extension et modernisation de la station de traitement des eaux usées Biocomp à Gromadka En raison du mauvais état de la technologie, il y a une installation et une petite capacité, il est prévu d’adapter l’inst. à la quantité accrue d’eaux usées conformément à la KPOŚK. Travaux de construction prévus: station d’eau, puits, stations de compression, chambres de séparation, chambres sans tl, réacteur à biol, station de pompage des boues, chambre de mesure des boues de récupération et puits d’égouts, puits de canal, biofiltre, système de contrôle et de contrôle pour l’ensemble de la station de traitement. Action 2: Construction du gazoduc de transport Osła-Gromadka Construction d’un gazoduc de décharge pour le transport des eaux usées à partir du projet de construction d’un réseau de canettes sanitaires dans la ville d’Osła jusqu’au réseau existant à Gromadka. La construction d’une station de pompage des eaux usées et d’une section du réseau gravitationnel est également incluse. Action 3: Extension du réseau d’assainissement sanitaire avec raccordements: Rosyniec, Osła est prévu de construire can.gravit.avec des éléments de compressé. La longueur totale du pipeline ainsi que les raccordements prévus pour le chantier. — 23,19 km, connexions — 5,08 km, longueur d’égout sans raccordement — 18,1 km. Action 4: Surveillance des investisseurs Action 5: Tâche 2 de gestion de projet: Activités de promotion (French)
    1 December 2021
    0 references

    Identifiers

    RPDS.04.02.01-02-0017/16
    0 references