Works on railway lines no. 153,199, 681, 682, and 872 on the section Toszek Północ – Rudziniec Gliwicki – Stare Koźle (Q86018)

From EU Knowledge Graph
Revision as of 21:21, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet porte sur les travaux de remise en état des tronçons suivants des lignes de chemin de fer: • Ligne de chemin de fer 153, section: Toszek Północ — Rudziniec Gliwicki du km 0,300 au km 19 318, soit 19,018 km de long; section d’intérêt de l’État, double voie, électrifiée, couverte par les accords internationaux AGC et AGTC. Dans l’option choisie, la réhabilitation de la ligne 153 comprend la voie 1 (actuellement infranchissable), tandis q...)
Jump to navigation Jump to search
Project Q86018 in Poland
Language Label Description Also known as
English
Works on railway lines no. 153,199, 681, 682, and 872 on the section Toszek Północ – Rudziniec Gliwicki – Stare Koźle
Project Q86018 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    169,166,067.38 zloty
    0 references
    40,599,856.17 Euro
    13 January 2020
    0 references
    199,018,902.8 zloty
    0 references
    47,764,536.67 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 June 2017
    0 references
    30 June 2020
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    0 references

    50°17'38.8"N, 18°9'39.6"E
    0 references

    50°31'46.2"N, 18°16'9.1"E
    0 references

    50°21'45.7"N, 18°29'7.8"E
    0 references
    Projekt obejmuje prace o charakterze rehabilitacyjnym na następujących odcinkach linii kolejowych: • Linia kolejowa nr 153, na odcinku: Toszek Północ – Rudziniec Gliwicki od km 0,300 do km 19,318, to jest o długości 19,018 km; odcinek o znaczeniu państwowym, dwutorowy, zelektryfikowany, objęty międzynarodowymi umowami AGC i AGTC. W wybranym wariancie rehabilitacja linii 153 obejmuje tor 1 (obecnie nieprzejezdny), natomiast tor 2 będzie podlegać punktowej naprawie. • Linia kolejowa nr 199, na odcinku: Rudziniec Gliwicki – Kędzierzyn Koźle KKA od km 49,100 do km 61,600, to jest o długości 12,500 km; odcinek o znaczeniu państwowym, jednotorowy, zelektryfikowany. • Linia kolejowa nr 681, linia kolejowa na odcinku: Nowa Wieś – Stare Koźle od km 0,000 do km 3,390, to jest o długości 3,390 km; odcinek o znaczeniu państwowym, jednotorowy, zelektryfikowany. • Linia kolejowa nr 682, na odcinku: Nowa Wieś - Kędzierzyn Koźle KKB od km 0,000 do km 2,500, to jest o długości 2,500 km; linia o znaczeniu lokalnym, zelektryfikowana, jednotorowa. • Linia kolejowa nr 872, na odcinku: Nowa Wieś – Kędzierzyn Koźle KKC od km 61,600 do km 63,000, to jest o długości 1,400 km; odcinek o znaczeniu lokalnym, zelektryfikowany, jednotorowy. W ramach projektu zostanie wykonane: • opracowanie projektów budowlanych i wykonawczych wraz z pozyskaniem decyzji administracyjnych; • roboty budowlane, • opracowanie dokumentacji powykonawczej, • opracowanie i uzyskanie kompletu dokumentów związanych z procesem certyfikacji i dopuszczeniem do eksploatacji podsystemów strukturalnych, • umowy przyłączeniowe, • nadzór inwestorski, • działania informacyjne i promujące projekt. (Polish)
    0 references
    The project includes rehabilitation work on the following sections of railway lines: • Railway Line No 153, in the section: Toszek Północ – Rudziniec Gliwicki from km 0.300 to km 19.318, that is 19.018 km long; a state-of-the-art section, two-track, electrified, covered by international agreements AGC and AGTC. In the selected option, the rehabilitation of Line 153 includes track 1 (currently impassable), while track 2 will be subject to point repair. • Railway Line No 199, in the section: Rudziniec Gliwicki – Kędzierzyn Koźle KKA from km 49.100 to km 61.600, i.e. 12.500 km long; a state-of-the-art section, single track, electrified. • Railway No. 681, railway line on the section: Nowy Wieś – Stare Koźle from km 0.000 to km 3.390, i.e. 3.390 km long; a state-of-the-art section, single track, electrified. • Railway Line No 682, in the section: Nowy Wieś – Kędzierzyn Koźle KKB from km 0.000 to km 2.500, i.e. 2.500 km long; locally important line, electrified, single track. • Railway Line No 872, in the section: Nowy Wieś – Kędzierzyn Koźle KKC from km 61.600 to km 63.000, i.e. 1.400 km long; locally important section, electrified, single track. As part of the project, the following will be carried out: • development of construction and implementation projects together with obtaining administrative decisions; • construction works, • preparation of post-executive documentation, • elaboration and obtaining a complete set of documents related to the process of certification and placing into service of structural subsystems, • connection agreements, • investor supervision, • information and project promotion activities. (English)
    14 October 2020
    0 references
    Le projet porte sur les travaux de remise en état des tronçons suivants des lignes de chemin de fer: • Ligne de chemin de fer 153, section: Toszek Północ — Rudziniec Gliwicki du km 0,300 au km 19 318, soit 19,018 km de long; section d’intérêt de l’État, double voie, électrifiée, couverte par les accords internationaux AGC et AGTC. Dans l’option choisie, la réhabilitation de la ligne 153 comprend la voie 1 (actuellement infranchissable), tandis que la voie 2 fera l’objet d’une réparation ponctuelle. • Ligne de chemin de fer 199, sur le tronçon: Rudziniec Gliwicki — Kędzierzyn Koźle KKA du km 49 100 au km 61 600, il mesure 12 500 km; section d’importance nationale, voie unique, électrifiée. • Ligne de chemin de fer 681, ligne de chemin de fer sur la section: Nowy Wieś — Vieux Koźle de 0,000 à 3,390 km, il fait 3,390 km de long; section d’importance nationale, voie unique, électrifiée. • Ligne de chemin de fer 682, section: Nowy Wieś — Kędzierzyn Koźle KKB de 0,000 km à 2 500 km, il mesure 2,500 km; ligne d’importance locale, électrifiée, simple voie. • Ligne de chemin de fer 872, section: Nowy Wieś — Kędzierzyn Koźle KKC du km 61600 au km 63 000, soit 1,400 km de long; section locale importante, électrifiée, voie unique. Dans le cadre du projet: • développement de projets de construction et de mise en œuvre avec l’acquisition de décisions administratives; • travaux de construction, • développement de la documentation as-built, • préparation et obtention d’un ensemble de documents relatifs au processus de certification et à la mise en service de sous-systèmes structurels, • accords de connexion, • supervision des investisseurs, • activités d’information et de promotion de projets. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.05.02.00-00-0008/16
    0 references