Adapt the container terminal DB Port Szczecin for handling ships with higher tonnage. (Q85909)

From EU Knowledge Graph
Revision as of 21:12, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Ce projet consiste à adapter le terminal intermodal accessible au public à Ostrów Grabowski dans le port de Szczecin à des navires de service de tonnage supérieur, grâce à l’utilisation d’équipements de transbordement adaptés à l’exploitation de porte-conteneurs d’une immersion allant jusqu’à 11,5 m. Cela donnera au terminal la possibilité d’acquérir des volumes supplémentaires grâce aux armateurs, qui n’ont pu jusqu’à présent faire appel à Szcz...)
Jump to navigation Jump to search
Project Q85909 in Poland
Language Label Description Also known as
English
Adapt the container terminal DB Port Szczecin for handling ships with higher tonnage.
Project Q85909 in Poland

    Statements

    0 references
    32,016,550.0 zloty
    0 references
    7,683,972.0 Euro
    13 January 2020
    0 references
    64,033,100.0 zloty
    0 references
    15,367,944.0 Euro
    13 January 2020
    0 references
    50.0 percent
    0 references
    30 January 2018
    0 references
    31 December 2023
    0 references
    DB PORT SZCZECIN SP. Z O.O.
    0 references
    0 references
    0 references

    53°25'46.9"N, 14°35'34.4"E
    0 references
    Niniejszy projekt zakłada dostosowanie ogólnodostępnego terminala intermodalnego na Ostrowie Grabowskim w Porcie Szczecin do obsługi statków o większym tonażu, dzięki wykorzystaniu sprzętu przeładunkowego dostosowanego do obsługi statków kontenerowych o zanurzeniu do 11,5 m. Stworzy to terminalowi szansę na pozyskanie dodatkowych wolumenów za sprawą armatorów, które dotychczas nie były w stanie zawinąć do Szczecina z powodu braku możliwości nawigacyjnych. Możliwa stanie się obsługa statków wymagających użycia suwnicy STS o wysięgu do 17 rzędów. Zakupione zostaną także 3 suwnice typu RTG (rubber tyre gantry) lub odpowiedniki spełniający wymogi operacyjne i wydajnościowe. Zakres przedmiotowego Projektu obejmuje zakup następujących urządzeń: - Zakup 1 suwnicy STS (wydatek nieinfrastrukturalny) - Zakup 3 suwnic RTG (wydatek nieinfrastrukturalny) W skład projektu wchodzą również niezbędne wydatki na: - Działania informacyjno-promocyjne - Usługi prawne (związane z obsługą projektu) Dzięki inwestycji terminal będzie zdolny do obsługi 180 000 TEU rocznie (przy niezmienionych godzinach pracy terminala w porównaniu ze stanem obecnym). Aktualna przepustowość terminala liczona zdolnością przeładunkową suwnic STS (ship-to-shore) lub odpowiedników spełniających wymogi operacyjne i wydajnościowe szacowana na 120 000 TEU. (Polish)
    0 references
    This project aims to adapt the public intermodal terminal in Ostrów Grabowski in Port Szczecin for handling ships with higher tonnage, thanks to the use of transhipment equipment adapted to handle container ships with submersible up to 11.5 m. This creates an opportunity for the terminal to acquire additional volumes due to shipowners which were not able to call to Szczecin due to the lack of navigation possibilities. It will be possible to operate ships requiring the use of an STS overhead crane up to 17 rows. 3 X-ray cranes (rubber tyre gantry) or equivalents that meet operational and performance requirements will also be purchased. The scope of this Project includes the purchase of the following equipment: — Purchase of 1 STS overhead cranes (non-infrastructure expenditure) – Purchase of 3 RTG overhead cranes (non-infrastructure expenditure) The project also includes the necessary expenditure on: — Information and promotion activities – Legal services (related to project support) Thanks to the investment, the terminal will be able to handle 180 000 TEU per year (with unchanged terminal operating hours compared to the current situation). Current terminal capacity based on the capacity of STS overhead cranes (ship-to-shore) or equivalents meeting operational and performance requirements is estimated at 120 000 TEU. (English)
    14 October 2020
    0 references
    Ce projet consiste à adapter le terminal intermodal accessible au public à Ostrów Grabowski dans le port de Szczecin à des navires de service de tonnage supérieur, grâce à l’utilisation d’équipements de transbordement adaptés à l’exploitation de porte-conteneurs d’une immersion allant jusqu’à 11,5 m. Cela donnera au terminal la possibilité d’acquérir des volumes supplémentaires grâce aux armateurs, qui n’ont pu jusqu’à présent faire appel à Szczecin en raison du manque de capacité de navigation. Il sera possible d’exploiter des navires nécessitant l’utilisation de grues STS jusqu’à 17 rangées. 3 grues à rayons X (panneaux pneumatiques en caoutchouc) ou des appareils équivalents répondant aux exigences opérationnelles et de performance seront également achetés. Le champ d’application du projet couvre l’achat des équipements suivants: — Achat de 1 grue STS (dépenses autres que l’infrastructure) — Achat de 3 grues à rayons X (dépenses autres que l’infrastructure) Le projet comprend également les dépenses nécessaires pour: — Activités d’information et de promotion — Services juridiques (liés à la gestion de projet) Le terminal sera en mesure de gérer 180 000 EVP annuellement (avec des heures d’exploitation du terminal inchangées par rapport à l’état actuel) grâce à l’investissement. Capacité terminale actuelle calculée avec la capacité des grues STS (navire à terre) ou équivalentes avec des exigences opérationnelles et de performance estimées à 120 000 EVP. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.03.02.00-00-0046/18
    0 references