Thermal modernisation of building No. 63 NOSG headquarters, administrative buildings PSG Kodeń, PSG Lubycza Królewska and 2 administrative buildings PSG Skryhiczyn (Q84624)

From EU Knowledge Graph
Revision as of 20:58, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’objectif principal du projet est d’améliorer l’efficacité énergétique des cinq bâtiments publics appartenant au Trésor public dans le cadre de la gestion permanente de la section des gardes-frontières de Nadbuzan à Chełm. Les travaux de modernisation thermique de chaque bâtiment comprendront principalement: — isolation des parois extérieures avec une couche d’isolation thermique du styrofoam et une expédition d’élévation de plâtre acrylique te...)
Jump to navigation Jump to search
Project Q84624 in Poland
Language Label Description Also known as
English
Thermal modernisation of building No. 63 NOSG headquarters, administrative buildings PSG Kodeń, PSG Lubycza Królewska and 2 administrative buildings PSG Skryhiczyn
Project Q84624 in Poland

    Statements

    0 references
    1,803,268.68 zloty
    0 references
    432,784.48 Euro
    13 January 2020
    0 references
    2,121,492.57 zloty
    0 references
    509,158.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 August 2017
    0 references
    31 December 2018
    0 references
    NADBUŻAŃSKI ODDZIAŁ STRAŻY GRANICZNEJ W CHEŁMIE
    0 references
    0 references
    0 references
    Głównym celem projektu jest poprawa efektywności energetycznej pięciu budynków użyteczności publicznej będących własnością Skarbu Państwa w trwałym zarządzie Nadbużańskiego Oddziału Straży Granicznej w Chełmie. Zakres prac termomodernizacyjnych każdego z budynków będzie polegał głównie na: - dociepleniu ścian zewnętrznych warstwą izolacji cieplnej ze styropianu i wyprawie elewacyjnej z tynku akrylowego barwionego w masie; - dociepleniu ścian zewnętrznych w gruncie styropianem ekstrudowanym, - dociepleniu stropodachów; - wymianie okien i drzwi zewnętrznych; - kompleksowej modernizacji instalacji c.o. (demontaż starej instalacji, montaż nowych grzejników i zaworów termostatycznych). Na w/w przedsięwzięcia opracowano dokumentację techniczną z uwzględnieniem zasady poszanowania energii. W trakcie robót budowlanych nadzór autorski będzie sprawował autor dokumentacji. Termomodernizacja pozwoli zabezpieczyć budynki przed wpływami czynników atmosferycznych (zwłaszcza w okresie zimowym) zmniejszając wydatki związane z dostawami ciepła i poprawiając komfort cieplny w okresie zimowym. Planowana realizacja nie ingeruje w chroniony unijnym programem "Natura 2000" obszar nadbużański. (Polish)
    0 references
    The main objective of the project is to improve the energy efficiency of five public utility buildings owned by the State Treasury in the permanent management of the Border Guard Division in Chełm. The scope of thermal retrofitting works of each building will consist mainly of: — insulation of the outer walls with a layer of heat insulation made of styrofoam and an acrylic plaster dyed in mass; — insulation of external walls in extruded styrofoam ground, – insulation of stropodache; — replacement of windows and external doors; — comprehensive modernisation of the central heating system (disassembly of the old installation, installation of new radiators and thermostatic valves). Technical documentation has been developed on the above-mentioned project, taking into account the principle of energy respect. During the construction works, the author of the documentation will be supervised by the author. Thermo-modernisation will help to protect buildings against atmospheric influences (especially in the winter) by reducing expenses related to heat supply and improving thermal comfort during the winter. The planned implementation does not interfere with the EU Natura 2000 programme. (English)
    14 October 2020
    0 references
    L’objectif principal du projet est d’améliorer l’efficacité énergétique des cinq bâtiments publics appartenant au Trésor public dans le cadre de la gestion permanente de la section des gardes-frontières de Nadbuzan à Chełm. Les travaux de modernisation thermique de chaque bâtiment comprendront principalement: — isolation des parois extérieures avec une couche d’isolation thermique du styrofoam et une expédition d’élévation de plâtre acrylique teint dans la masse; — isolation des murs extérieurs dans le sol avec du polystyrène extrudé, — réchauffement des roseaux; — remplacement des fenêtres et des portes extérieures; — modernisation complète des installations de chauffage central (démontage de l’ancienne installation, installation de nouveaux radiateurs et vannes thermostatiques). Une documentation technique a été établie pour le projet susmentionné, en tenant compte du principe du respect de l’énergie. Pendant les travaux de construction, la supervision de l’auteur sera assurée par l’auteur de la documentation. La thermomodernisation contribuera à protéger les bâtiments contre l’influence des conditions météorologiques (en particulier en hiver) en réduisant les dépenses liées à l’approvisionnement en chaleur et en améliorant le confort thermique pendant la période hivernale. La mise en œuvre prévue n’interfère pas avec le programme Natura 2000 protégé de la zone de Nadbużański. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.01.03.01-00-0110/15
    0 references